January 5, 2010
SUBJECT:
SHEARON HARRIS NUCLEAR POWER PLANT - NRC PROBLEM IDENTIFICATION AND RESOLUTION INSPECTION REPORT 05000400/2009006 ERRATA
Dear Mr. Burton:
On October 30, 2009, the US Nuclear Regulatory Commission (NRC) issued the subject inspection report for the Shearon Harris Nuclear Power Plant, ADAMS accession ML093060038. In reviewing this report, it was noted that the cover letter and inspection report incorrectly referred to license number DPR-63, vice the correct license number, NPF-63.
Accordingly, we are providing a portion of the revised version of Inspection Report 05000400/2009006 that documents the correction.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter, its enclosure, and your response, if any, will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
I apologize for any inconvenience this error may have caused. If you have any questions, please contact me at (404) 562-4421
Sincerely,
/RA/
Daniel J. Merzke, Acting Chief
Reactor Projects Branch 7
Division of Reactor Projects
Docket Nos.: 50-400 License Nos.: NPF-63
Enclosure:
Corrected pages
REGION II==
Docket Nos.:
50-400
License Nos.:
Report No:
Licensee:
Carolina Power and Light Company (CP&L)
Facility:
Shearon Harris Nuclear Power Plant, Unit 1
Location:
5413 Shearon Harris Road New Hill, NC 27562
Dates:
September 14 - 18, 2009
September 28 - October 2, 2009
Inspectors:
M. Catts, Resident Inspector, Palo Verde, Team Leader P. Lessard, Resident Inspector, Harris P. Niebaum, Resident Inspector, Hatch R. Taylor, Senior Project Inspector E. Stamm, Project Engineer
Approved by:
Daniel J. Merzke, Acting Chief Reactor Projects Branch 7 Division of Reactor Projects
In addition, if you disagree with the characterization of any finding in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the Regional Administrator, Region II, and the NRC Resident Inspector at the Shearon Harris Power Plant. The information you provide will be considered in accordance with Inspection Manual Chapter 0305.
In accordance with 10 CFR 2.390 of the NRCs "Rules of Practice," a copy of this letter, its enclosure, and your response (if any), will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Daniel Merzke, Acting Chief Reactor Projects Branch 7 Division of Reactor Projects
Docket Nos.
50-400 License Nos. DPR-63
Enclosure:
Inspection Report 05000400/2009006
w/Attachment: Supplemental Information
REGION II==
Docket Nos.:
50-400
License Nos.:
Report No:
Licensee:
Carolina Power and Light Company (CP&L)
Facility:
Shearon Harris Nuclear Power Plant, Unit 1
Location:
5413 Shearon Harris Road New Hill, NC 27562
Dates:
September 14 - 18, 2009
September 28 - October 2, 2009
Inspectors:
M. Catts, Resident Inspector, Palo Verde, Team Leader P. Lessard, Resident Inspector, Harris P. Niebaum, Resident Inspector, Hatch R. Taylor, Senior Project Inspector E. Stamm, Project Engineer
Approved by:
Daniel Merzke, Acting Chief Reactor Projects Branch 7 Division of Reactor Projects