IR 05000400/2009402

From kanterella
Jump to navigation Jump to search
IR 05000400-09-402, on 05/21/2009, Shearon Harris Nuclear Power Plant - NRC Security Inspection
ML091700123
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 06/19/2009
From: Ernstes M
NRC/RGN-II/DRS/PSB2
To: Burton C
Carolina Power & Light Co
References
IR-09-402
Download: ML091700123 (4)


Text

une 19, 2009

SUBJECT:

SHEARON HARRIS NUCLEAR POWER PLANT - NRC SECURITY INSPECTION REPORT 05000400/2009402

Dear Mr. Burton:

On May 21, 2009, the U. S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Shearon Harris Nuclear Power Plant, Unit 1. The inspection covered one or more of the key attributes of the security cornerstone of the NRCs Reactor Oversight Process. The enclosed report documents the inspection results, which were discussed with Mr. K. Henderson, and other members of your staff.

This inspection examined activities conducted under your license as they relate to security and compliance with the Commission=s rules and regulations and with the conditions of your license.

The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.

Based on the results of this inspection, no findings of significance were identified.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system, ADAMS.

ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter=s enclosure will not be available for public inspection.

In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC=s document system, ADAMS. If Safeguards Information is necessary to provide an acceptable CP&L 2 response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response ASecurity Related Information-Withhold Under 10 CFR 2.390" and follow the instructions for withholding in 10 CFR 2.390 (b)(1).

Sincerely,

.RA.

Michael E. Ernstes, Chief Plant Support Branch 2 Division of Reactor Safety Docket No.: 50-400 License No.: NPF-63 Enclosure: Inspection Report 05000400/2009402 w/Attachment Supplemental Information cc: See Page 3 CP&L 3 Thomas D. Walt cc w/encl: Vice President Brian C. McCabe Nuclear Oversight Manager, Nuclear Regulatory Affairs Carolina Power and Light Company Progress Energy Carolinas, Inc. P.O. Box 1551 P.O. Box 10429 Raleigh, NC 27602-1551 Southport, NC 28461-0429 Kelvin Henderson Plant General Manager Carolina Power and Light Company Shearon Harris Nuclear Power Plant P.O. Box 165, Mail Zone 3 New Hill, NC 27562-0165 R. J. Duncan, II Vice President Nuclear Operations Carolina Power & Light Company P.O. Box 165, Mail Zone 1 New Hill, NC 27562-0165 David H. Corlett Supervisor Licensing/Regulatory Programs Progress Energy P.O. Box 165, Mail Code: Zone 1 New Hill, NC 27562-0165 David T. Conley Associate General Counsel Legal Dept.

Progress Energy Service Company, LLC P.O. Box 1551 Raleigh, NC 27602-1551 Kimberly Harshaw Manager Support Services Progress Energy Carolinas, Inc.

Shearon Harris Nuclear Power Plant P.O Box 165, Mail Zone 1 New Hill, NC 27562-0165 Christos Kamilaris Director Fleet Support Services Carolina Power & Light Company P.O. Box 1551 Raleigh, NC 27602-1551 _________________________

OFFICE RII:DRS RII:DRS RII:DRS RII:DRP RII:DRP SIGNATURE /RA/ /RA/ / /RA/ /RA/

NAME A. Richardson J. Shehee M. Ernsets R. Musserr DATE 6/16/2009 6/17/2009 6/19/2009 6/18/2009 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO