IR 05000400/1994013

From kanterella
Jump to navigation Jump to search
Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-400/94-13
ML18011A583
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 09/08/1994
From: Boger B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Robinson W
CAROLINA POWER & LIGHT CO.
References
NUDOCS 9409190002
Download: ML18011A583 (5)


Text

PRIDRI'TY Z (NUDOCS OFFSITE FACILITY)

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9409190002 DOC.DATE: 94/09/08 NOTARIZED: NO FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTH.NAME AUTHOR AFFILIATION OGERiB.A.

Region 2 (Post 820201)

RECIP.NAME RECIPIENT AFFILIATION ROBINSON,W.R.

Carolina Power

& Light Co.

SUBJECT:

Ack receipt of 940824 ltr informing NRC of steps taken to correct violations noted in insp rept 50-400/94-13.

DISTRIBUTION CODE:

1E01D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: General (50 Dkt)-Insp Rept/Notice of Violation sponse NOTES:Application for permit renewal filed.

DOCKET 05000400 05000400 (

RECIPIENT ID CODE/NAME PD2-1 PD INTERNAL: ACRS AEOD/SPD/RAB AEOD/TTC NRR/DORS/OEAB NRR/PMAS/IRCB-E O'ER g-RE~-r E

~

~

RGN2 FILE

ERNAL: EG&G/BRYCEgJ.H.

NRC PDR COPIES LTTR ENCL RECIPIENT ID CODE/NAME LE,N AEOD/DEIB AEOD/SPD/RRAB DEDRO NRR/DRCH/HHFB NUDOCS-ABSTRACT OGC/HDS2 RES/HFB NOAC COPIES LTTR ENCL 1-

1

1

1 NOTE TO ALL'RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACTTHE DOCUMENTCONTROL DESK, ROOM Pl-37 (EXT. 504-2083 ) TO ELIMINATEYOUR NAMEFROM DISTRIBUTIONLISTS FOR DOCUMENTS YOU DON'TNEED!

TOTAL NUMBER OF COPIES REQUIRED:

LTTR

ENCL

SEP -8 1994 Docket No.:

50-400 License No.:

NPF-63 Carolina Power

& Light Company ATTN:

Hr.

W.

R. Robinson Vice President Shearon Harris Nuclear Power Plant P. 0.

Box 165, Hail Code:

Zone

New Hill, NC 27562-0165 Gentlemen:

SUBJECT:

NRC INSPECTION REPORT NO. 50-400/94-13 This will acknowledge receipt of your response of August 24, 1994, to our Notice of Violation issued on July 25, 1994, concerning activities conducted at your Harris facility.

We have examined your response and found that it meets the requirements of

CFR '2.201.

In your response, you denied violation A and admitted violation B.

With respect to violation A, we understand your explanation of the sequence of events to use priority-E work to open valve 1SW-20 and concur that a violation of Technical Specification (TS) 6.8. l.a did not occur.

The decision by the nuclear shift supervisor to authorize emergency work was based upon a

perceived impression that TS 3.0.3 was applicable and that immediate work was required to avoid an unnecessary plant transient.

Only after a detailed review of the system design was it subsequently determined that TS 3.0.3 was not applicable.

Therefore, we conclude that the shift supervisor's actions were appropriate.

As a result of the telephone conversation with Hr. Prunty of your staff on September 6,

1994, we understand that you will provide additional guidance to the shift supervisors to help them in similar situations with TS 3.0.3 applicability.

Accordingly, we will adjust our records to reflect that no violation of regulatory requirements occurred with respect to Item A.

We will examine the implementation of your action to correct violation B

during future inspections.

(af) I (;pa 9409190002 940908 ~

PDR ADOCK 05000400

PDR

Carolina Power

& Light Company

Thank you for your cooperation in this matter.

Sincerely, SEP -8 ISSUE Bruce A. Boger, Acting Direc Division of Reactor Projects tor CC:

H.

W. Habermeyer, Jr.

Vice President Nuclear Services Department Carolina Power

& Light Company P. 0.

Box 1551

- Hail OHS7 Raleigh, NC 27602 J.

W. Donahue Plant Manager

- Harris Plant Carolina Power

& Light Company S. Harris Nuclear Power Plant P. 0.

Box 165, HC:

Zone

New Hill,,NC 27562-0165 David NcCarthy, Manager Regulatory Affairs Harris Nuclear Project P. 0.

Box 165 New Hill, NC 27562 H.

Ray Starling Vice President

- Legal Dept.

Carolina Power and Light Co.

P. 0.

Box 1551 Raleigh, NC 27602 Dayne H. Brown, Director Div. of Radiation Protection N.

C. Dept. of Environmental Commerce

& Natural Resources P. 0.

Box 27687 Raleigh, NC 27611-7687 Karen E.

Long Assistant Attorney General State of North Carolina P. 0.

Box 629 Raleigh, NC 27602 (cc cont'd - See page 3)

Carolina Power

& Light Company (cc cont'd)

Public Service Commission State of South Carolina P. 0.

Box 11649 Columbia, SC 29211 Admiral Kinnaird R.

HcKee 214 South Norris Street Oxford, HD 21654 Robert D. Martin 3382 Sean Way Lawrenceville, GA 30244 Robert P. Gruber Executive Director Public Staff NCUC P. 0.

Box 29520 Raleigh, NC 27626 bcc:

H. Christensen, RII N. Le, NRR G. A. Hallstrom, RII Document Control Desk SEP "8" I994 NRC Resident Inspector U. S. Nuclear Regulatory Comm.

5421 Shearon Harris Road New Hill, NC 27562-9998 SEND TO

?

FC RI I:DRP JStarefo tj NAME 09/

/94 ATE No COPY'FFICIAL RECORD COPY RI I:DRP JTedrow RI I:DRP HChristensen 09/

/94 09/

/94 Yes e

No DOC MENT NAME:

PtiHARRI

~

P5 No

/

/94 Yes

/

/94 Yes

1