Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in IE Insp Repts 50-373/80-32 & 50-374/80-20
ML19338G388
Person / Time
Site: LaSalle  
Issue date: 10/09/1980
From: Fiorelli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML19338G389 List:
References
NUDOCS 8010290181
Download: ML19338G388 (1)


Text

gS 4 Guq'o't, UNITED STATES

~

! \\*

_. I NUCLEAR REGULATORY COMMISSION ib 2. k,'h E

REGION lit

.

o, Ac

[

799 ROOSEVELT ROAD

'As g

GLEN E LLYN, ILLINOIS 60137

  • ....

Docket No. 50-373 OCT 9 80 Docket No. 50-374 Commonwealth Edison Company ATTN:

Mr. Cordell Reed Vice President Post Office Box 767 Chicago, IL 60690 Gentlemen:

Thank you for your letter dated September 20, 1980, informing us of the steps you have taken to correct the items of noncompliance which we brought to your attention in Inspection Reports No. 50-373/80-32; 50-374/80-20 forwarded by our letter dated August 27, 1980. We have performed follow up inspections of these items and will examine these matters further during a subsequent inspection.

Your cooperatien with us is appreciated.

Sincerely, JiCby G. Fiorelli, Chief Reactor Construction and Engineering Support Branch cc:

Mr. J. S. Abel, Director of Nuclear Licensing Mr. L. J. Burke, Site Construction Superintendent Mr. T. E. Quaka, Quality Assurance Supervisor Mr. B.11. Holyoak, Station Superintendent Mr. B. B. Stephenson, Project Manager cc w/ltr dtd 9/26/80:

Central Files Reproduction Unit hPC 20b AEOD Resident Inspector, RIII PDR Local PDR NSIC TIC Mr. Dean Hansell, Office of Assistant Attorney General i