IE Insp Repts 50-373/80-13 & 50-374/80-09 on 800319-20.No Noncompliance Noted.Major Areas Inspected:Suppression Pool Mod,Licensee Action Re IE Bulletins & Previously Identified Items
ML19323C762
Person / Time
Site: LaSalle  
Issue date: 04/09/1980
From: Neisler J, Williams C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML19323C760 List:
References
50-373-80-13, 50-374-80-09, 50-374-80-9, NUDOCS 8005190147
Download: ML19323C762 (4)


Text

___ __

_. _

___.

_ _ _ _ _.

8005190147

.

O U.S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT

REGION III

,

Report Nos. 50-373/80-13; 50-374/80-09 Docket Nos. 50-373; 50-374 License Nos. CPPR-99; CPPR-100 Licensee:

Commonwealth Edison Company Post Office Box 767

,

Chicago, IL 60690

.

Facility Name: La Salle, Units 1 & 2 Inspection At: La Salle County Station, Marseilles, IL Inspection Conducted: March 19-20, 1980 Inspector:

J. H. Neisler

.c[a-,.

[M4 J

f.. #

l!.!!I Approved By:

C. C. Willia

,thle f,6 Project S ion 2 Inspection Summary Inspection on March 19-20, 1980 (Report Nos. 50-373/80-13; 50-374/80-09)

Areas Inspected: Suppression pool modification. Follow up licensee action relative to IE Bulletins 78-04 and 79-07. Follow up licensee actien on previously identified items and on items reported by licensee pursuant to 10 CFR 50.55(e). The inspection involved 11 inspector-hours on site by one NRC inspector.

Results: No items of noncompliance or deviations were identified.

l l

_

O

.

!

.

-___- - ____ _ _ - - -. _ _

-

._

_

_

-

.

_-

--.

- _ _ _ _ _ _ - _ _ _ _ _ _

.

'

DETAILS Persons Contacted

.

Principal Licensee Employees L. J. Burke, Site Project Superintendent T. E. Quaka, Site QA Supervisor

  • G. E. Groth, Station Construction
  • R. T. Rose, Lead Structural Engineer
  • L. J. Tapella, QA Engineer
  • J.

W. Gieseker, Station Construction

.

W. Grosko, Station Construction D. Skoza, Qa Engineer E. Falb, Field Engineer

'

Contractor and Other Personnel

  • M. R. Dougherty, QA Manager Walsh Construction Company V. Raklaitis, Structural Project Engineer, Sargent & Lundy
  • Denotes those personnel attending exit interview.

Licensee Action on Previously Reported Items (Closed) Unresolved Item (50-373/79-21-02): Environmental qualification of containment electrical penetrations manufactured by CONAX.

Sargent &

Lundy letter of December 26, 1979 states that environmental tests are in compliance with IEEE 317-72, IEE 323-71 and that tests were acceptable.

Test data reviewed on sitt by the inspector indicated the environmental qualification tests met the requirements of IEEE 317 and IEEE 323. This matter is resolved.

(Open) Unresolved Item (50-373/79-17-02; 50-374/79-11-01): FSAR require-ments for concrete creep and shrinkage analysis to be performed on actual concrete used for construction. Licensee representatives indicated that all tests have been performed and that test results are currently being reviewed. This item remains open pending review of test documentation.

(Closed) Licensee reported item pursuant to 10 CFR 50.55(e)

(50-374/79-XX-02): Defects in La Salle Unit 2 reactor containment struc-tural steel stub column cap plates. Licensee has completed a 100% in-spection of stub column steel in Unit 2 and a 70% inspection in Unit 1.

Pesults of the inspection indicate that 19 pieces of high carbon steel were found in Unit 2 and none in Unit 1.

Tests indicate this material was not the specified A36 steel but, resembled SAE 1547..As a r_esult of this investigation, the fabricator has included high carbon steel in his color coding system to prevent recurrence. The defective cap plates have been replaced with the specified A36 material. This item is con-sidered closed.

-2-

'

.

.

_

. l

_ _ - _ _ - _

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

.

O Program or Functional Areas Inspected 1.

Suppression Pool Modification The inspector observed work activities and reviewed QC documentation of work performed in the Unit I suppression pool.

Liner plate on containment wall has been removed and holes drilled for installation of anchor bolts at locations where downcomer brac-

)

ing is to be attached to the containment wall. The plate has been removed and the contractor is presently drilling anchor bolt holes in the reactor vessel pedestal wall.

'

The inspector reviewed Qc inspection records relative to drilling anchor bolt holes in the containment wall. Records pertaining to grouting of anchor bolts into the containment wall were reviewed.

All grout used is Master Builders EMBECO 636.

Certificates were available indicating confromance with Corps of Engineers Specifica-tion CRD-C588-78.

No items of noncompliance or deviations were identified in this area.

2.

Inspection and Enforcement Bulletins IEB 78-04 Environmental Qualification of Certain Stem Mounted Limit Switches Inside Reactor Containment. Licensee's response to IEB 78-04 committed to replace limit switches on the Main Steam Isolation Valves (MSIV) and ordered his contractors to replace the switches with an environmentally qualified switch (NAMCO EA 740). The unqual-ified limit switches have been replaced on the MSIV's, both inside and outside containment in Unit 1.

ECN 57A instructs the contractor to also replace the limit switches on the MSIV's in Unit 2.

This bulletin is considered closed.

IEB 79-07 Seismic Stress Analysis of Safety Related Piping. The licensee's response indicates that he has taken the actions required by the above bulletin. Documentation and data have been submitted to NRC/NRR by the licensee's NSSS contractor. No further action regarding this bulletin is contemplated by the RIII inspector. Any further questions involving this bulletin will be initiated by NRC headquarters. This item is considered closed.

3.

Labor Contracts During discussions with site management, the inspector was informed that several labor contracts involving the La Salle craft unions

_

were due to expire during 1980. Expiration dates for the contracts are as follows:

,

l l

l-3-j

,

.

-

-

-

,

..

..

. -.....

.... -....

t

.-.

. -... - -..

.

>

April 30, 1980 Glaziers Local #87 Laborers Local #393

-

Painters Local #465 Sheet Metal Workers Local #1 Teamsters Local #722 May 31, 1980 Bricklayers Local #10 Cement Masons Cecal #297 Ironworkers Local #386

-

Plumbers Local #81 Roofers Local #55 The licensee indicated that negotiations for renewal of the contracts were in progress.

Exit Interview The inspector met with licensee repre.entatives (denoted under Persons Contacted) at the conclusion of the inspection on March 20, 1980. The inspector summarized the scope and findings of the inspection.

-

.

O-4-