ML060610575

From kanterella
Jump to navigation Jump to search
Annual Assessment Letter - McGuire Nuclear Station (NRC Inspection Report 05000369-06-001 and 05000370-06-001)
ML060610575
Person / Time
Site: Mcguire, McGuire  Duke Energy icon.png
Issue date: 03/02/2006
From: Ernstes M
NRC/RGN-II/DRP/RPB1
To: Gordon Peterson
Duke Energy Corp
Shared Package
ML060610567 List:
References
IR-06-001
Download: ML060610575 (4)


See also: IR 05000369/2006001

Text

March 2, 2006

Duke Energy Corporation

ATTN: Mr. G. R. Peterson

Site Vice President

McGuire Nuclear Station

12700 Hagers Ferry Road

Huntersville, NC 28078-8985

SUBJECT:

ANNUAL ASSESSMENT LETTER - MCGUIRE NUCLEAR STATION

(NRC INSPECTION REPORT 05000369/2006001 AND 05000370/2006001)

Dear Mr. Peterson:

On February 7, 2006, the NRC staff completed its performance review of the McGuire Nuclear

Station. Our technical staff reviewed performance indicators (PIs) for the most recent quarter

and inspection results for the period from January 1 through December 31, 2005. The purpose

of this letter is to inform you of our assessment of your safety performance during this period

and our plans for future inspections at your facility.

This performance review and enclosed inspection plan do not include physical protection

information. A separate letter, designated and marked as Official Use Only - Security-Related

Information, will include the physical protection performance review and resultant inspection

plan.

Overall, McGuire Units 1 and 2 operated in a manner that preserved public health and safety

and fully met all cornerstone objectives. Plant performance for the most recent quarter, as well

as for the first three quarters of the assessment cycle, was within the Licensee Response

column of the NRCs Action Matrix. We base this conclusion on the fact that all inspection

findings were classified as having very low safety significance (Green) and all PIs indicated

performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to

conduct reactor oversight process (ROP) baseline inspections at your facility. We also plan on

conducting several non-ROP inspections which include the independent spent fuel storage

facility, reactor vessel head and head penetrations, containment emergency recirculation sump

blockage, and initial reactor operator licensing examinations.

The enclosed inspection plan details the inspections, less those related to physical protection,

scheduled through September 30, 2007. The inspection plan is provided to allow for the

resolution of any scheduling conflicts and personnel availability issues well in advance of

inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and

continuous nature. The inspections in the last nine months of the inspection plan are tentative

and may be revised at the mid-cycle review. Although our intent is to maintain the enclosed

inspection plan fixed for the first nine months, a need may arise to conduct one or more

DEC

2

unanticipated inspections prior to issuing an updated inspection plan with the 2006 assessment

cycle mid-cycle letter. If an inspection of this type becomes necessary, we will notify you of the

planned inspection dates as soon as possible to resolve, as much as we can, any scheduling

and personnel availability conflicts you may have.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its

enclosure will be made available electronically for public inspection in the NRC Public

Document Room or from the Publicly Available Records (PARS) component of NRC's

document system (ADAMS). ADAMS is accessible from the NRC Web site at

http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

If circumstances arise which cause us to change this inspection plan, we will contact you to

discuss the change as soon as possible. Please contact me at (404) 562-4540 with any

questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Michael E. Ernstes, Chief

Reactor Projects Branch 1

Division of Reactor Projects

Docket Nos.: 50-369, 50-370, 72-38

License Nos.: NPF-9, NPF-17

Enclosure: McGuire Inspection/Activity Plan

DEC

3

cc w/encl:

C. J. Thomas

Regulatory Compliance Manager (MNS)

Duke Energy Corporation

Electronic Mail Distribution

R. L. Gill, Jr., Manager

Nuclear Regulatory Issues

and Industry Affairs

Duke Energy Corporation

526 S. Church Street

Charlotte, NC 28201-0006

Lisa Vaughn

Associate General Counsel

Duke Energy Corporation

526 South Church Street

Mail Code EC 07H

Charlotte, NC 28201-1244

Anne Cottingham

Winston & Strawn LLP

Electronic Mail Distribution

Beverly Hall, Acting Director

Division of Radiation Protection

N. C. Department of Environmental

Health & Natural Resources

Electronic Mail Distribution

County Manager of Mecklenburg County

720 East Fourth Street

Charlotte, NC 28202

Peggy Force

Assistant Attorney General

N. C. Department of Justice

Electronic Mail Distribution

Distribution w/encl: (See page 4)

_________________________

OFFICE

RII:DRP

SIGNATURE

CWR1

NAME

CRapp:rcm

DATE

03/01/06

3/ /2006

3/ /2006

3/ /2006

3/ /2006

3/ /2006

3/ /2006

E-MAIL COPY?

YES

NO YES

NO YES

NO YES

NO YES

NO YES

NO YES

NO