March 2, 2006
Duke Energy Corporation
ATTN: Mr. G. R. Peterson
Site Vice President
McGuire Nuclear Station
12700 Hagers Ferry Road
Huntersville, NC 28078-8985
SUBJECT:
ANNUAL ASSESSMENT LETTER - MCGUIRE NUCLEAR STATION
(NRC INSPECTION REPORT 05000369/2006001 AND 05000370/2006001)
Dear Mr. Peterson:
On February 7, 2006, the NRC staff completed its performance review of the McGuire Nuclear
Station. Our technical staff reviewed performance indicators (PIs) for the most recent quarter
and inspection results for the period from January 1 through December 31, 2005. The purpose
of this letter is to inform you of our assessment of your safety performance during this period
and our plans for future inspections at your facility.
This performance review and enclosed inspection plan do not include physical protection
information. A separate letter, designated and marked as Official Use Only - Security-Related
Information, will include the physical protection performance review and resultant inspection
plan.
Overall, McGuire Units 1 and 2 operated in a manner that preserved public health and safety
and fully met all cornerstone objectives. Plant performance for the most recent quarter, as well
as for the first three quarters of the assessment cycle, was within the Licensee Response
column of the NRCs Action Matrix. We base this conclusion on the fact that all inspection
findings were classified as having very low safety significance (Green) and all PIs indicated
performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to
conduct reactor oversight process (ROP) baseline inspections at your facility. We also plan on
conducting several non-ROP inspections which include the independent spent fuel storage
facility, reactor vessel head and head penetrations, containment emergency recirculation sump
blockage, and initial reactor operator licensing examinations.
The enclosed inspection plan details the inspections, less those related to physical protection,
scheduled through September 30, 2007. The inspection plan is provided to allow for the
resolution of any scheduling conflicts and personnel availability issues well in advance of
inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and
continuous nature. The inspections in the last nine months of the inspection plan are tentative
and may be revised at the mid-cycle review. Although our intent is to maintain the enclosed
inspection plan fixed for the first nine months, a need may arise to conduct one or more
2
unanticipated inspections prior to issuing an updated inspection plan with the 2006 assessment
cycle mid-cycle letter. If an inspection of this type becomes necessary, we will notify you of the
planned inspection dates as soon as possible to resolve, as much as we can, any scheduling
and personnel availability conflicts you may have.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its
enclosure will be made available electronically for public inspection in the NRC Public
Document Room or from the Publicly Available Records (PARS) component of NRC's
document system (ADAMS). ADAMS is accessible from the NRC Web site at
http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
If circumstances arise which cause us to change this inspection plan, we will contact you to
discuss the change as soon as possible. Please contact me at (404) 562-4540 with any
questions you may have regarding this letter or the inspection plan.
Sincerely,
/RA/
Michael E. Ernstes, Chief
Reactor Projects Branch 1
Division of Reactor Projects
Docket Nos.: 50-369, 50-370, 72-38
Enclosure: McGuire Inspection/Activity Plan
3
cc w/encl:
C. J. Thomas
Regulatory Compliance Manager (MNS)
Duke Energy Corporation
Electronic Mail Distribution
R. L. Gill, Jr., Manager
Nuclear Regulatory Issues
and Industry Affairs
Duke Energy Corporation
526 S. Church Street
Charlotte, NC 28201-0006
Lisa Vaughn
Associate General Counsel
Duke Energy Corporation
526 South Church Street
Mail Code EC 07H
Charlotte, NC 28201-1244
Anne Cottingham
Winston & Strawn LLP
Electronic Mail Distribution
Beverly Hall, Acting Director
Division of Radiation Protection
N. C. Department of Environmental
Health & Natural Resources
Electronic Mail Distribution
County Manager of Mecklenburg County
720 East Fourth Street
Charlotte, NC 28202
Peggy Force
Assistant Attorney General
N. C. Department of Justice
Electronic Mail Distribution
Distribution w/encl: (See page 4)
_________________________
OFFICE
RII:DRP
SIGNATURE
CWR1
NAME
CRapp:rcm
DATE
03/01/06
3/ /2006
3/ /2006
3/ /2006
3/ /2006
3/ /2006
3/ /2006
E-MAIL COPY?
YES
NO YES
NO YES
NO YES
NO YES
NO YES
NO YES
NO