Forwards IE Insp Repts 50-369/78-37 & 50-370/78-16 on 781106-09.No Noncompliance Noted
ML19267A300
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 11/30/1978
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parker W
DUKE POWER CO.
Shared Package
ML19263A954 List:
References
NUDOCS 7901040017
Download: ML19267A300 (2)


Text

o s

..

UNITED STATES

[g* "800g[o

NUCLEAR REGULATORY COMMISSION

,,

R EGION ll

{

3p g

" r g

101 M ARIETTA STREET, N.W.

.-*

f ATt.ANTA, GEORGI A 30303 o,

s, * * " * /

NOV 3 o 997g In Reply Refer To:

RII:MDH 50-369/78-37 50-370/78-16 Duke Power Company

.

ATTN:

Mr. William O. Parker, Jr.

Vice President, Steam Production P. O. Box 2178 422 South Church Street Charlotte, North Carolina 28247.

Gentlemen:

This refers to the inspection conducted by Mr. M. D. Hunt of this office on November 6-9, 1978, of activities authorized by NRC Construction Permit Nos. CPPR-83 and CPPR-84 for the McGuire Nuclear Station Units 1 and 2 facility, and to the discussion of our findings held with Mr. G. W. Grier at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the enclosed inspection report. Within these areas, the inspection consisted of selective examinations of procedures and representative records, interviews with personnel, and observations by the inspectors.

Within the scope of this inspection, no items of noncompliance were disclosed.

We have examined actions you have taken with regard to previously identified enforcement matters and unresolved items.

The status of these items is discussed in the enclosed report.

One new unresolved item resulted from this inspection and is discussed in the enclosed report. This item will be examined during subsequent inspections.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title 10, Code of Federal Regulations, a copy of'this letter and the enclosed inspection report will be placed in the NRC's Public Document Room.

If this report contains any information that you (or your contractor) believe to be proprietary, it is necessary that you make a written application within 20 days to this office to withhold such information from public disclosure.

Any such application must include a full statement of the reasons on the basis of which it is claimed that the information is proprietary, and should 79010400M

.

.

.

.

Duke Power Company-2-NOV 3 01978 be prepared so that proprietary information identified in the application is contained in a separate part of the document. If we do not hear from you in this regard within the specified period, the report will be placed in the Public Document Room.

Should you have any questions concerning this letter, we will be glad to discuss them with you.

.

Sincerely, b$11 l

d/ Charles E. Murphy, Chief Reactor Construction and Engineering Support Branch Enclosure:

Inspection Report Nos. 50-369/78-37 50-370/78-16 cc w/ encl:

Mr. J. E. Smith, Station Manager Oconee Nuclear Plant P. O. Box 1175 Seneca, South Carolina 29678

.