ENCLOSURE NOTICE OF VIOLATION l

'

Georgia Power Company Docket N Hatch 2 License No. NPF-5 The following violation was identified during an inspection conducted on May 24 - June 28, 1985. The Severity Level was assigned in accordance with the NRC Enforcement Policy (10 CFR Part 2, Appendix C).

Technical Specification 6.8.1 requires that procedures shall be established, implemented and maintained covering safety-related activitie Contrary to the above, Procedure HNP-2-1500, Primary Containment Atmospheric Control System, was not properly implemented in that on May 24, 1985, two nitrogen makeup valves were found out of the position required by Data Package 1 of HNP-2-1500. The position of these valves, being shut instead of open, caused a SCRAM when the air was secured to the Main Steam Isolation valves in preparation for inerting the drywel This is a Seversty Level IV violation (Supplement I).

Pursuant to 10 CFR 2.201, you are required to submit to this office within 30 days of the date of this Notice, a written statement or explanation in reply, including: (1) admission or denial of the alleged violation; (2) the reasons for the violation if admitted; (3) the corrective steps which have been taken and the results achieved; (4) corrective steps which will be taken to avoid further violations; and (5) the date when full compliance will be achieve Security or safeguards information should be submitted as an enclosure to

'

facilitate withholding it from public disclosure as required by 10 CFR 2.790(d)

or 10 CFR 73.2 Date: M 8508140399 850722 PDR ADOCK 05000321 O PDR

._ _ _ _

._.