Category:INSPECTION REPORT
MONTHYEARIR 05000354/19990051999-10-0101 October 1999 Insp Rept 50-354/99-05 on 990711-0829.Four Violations of NRC Requirements Occurred & Being Treated as Ncvs.Major Areas Inspected:Mitigating Sys,Barrier Integrity & Performance Indicator Verification IR 05000354/19990041999-08-11011 August 1999 Insp Rept 50-354/99-04 on 990530-0711.No Violations Noted. Major Areas inspected:cornerstone-mitigating Sys,Pi Verification IR 05000354/19990031999-06-21021 June 1999 Insp Rept 50-354/99-03 on 990419-0529.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000354/19990021999-05-14014 May 1999 Insp Rept 50-354/99-02 on 990308-0418.Non-cited Violation Identified.Major Areas Inspected:Operations,Maint & Plant Support IR 05000354/19990011999-04-19019 April 1999 Insp Rept 50-354/99-01 on 990124-0307.Violations Noted.Major Areas Inspected:Operations,Engineering,Maint & Plant Support IR 05000354/19980111998-12-22022 December 1998 Insp Rept 50-354/98-11 on 981101-1212.No Violations Noted. Major Areas Inspected:Aspects of Licensee Operations, Engineering,Maint & Plant Support IR 05000354/19980101998-11-23023 November 1998 Insp Rept 50-354/98-10 on 980920-1031.Violations Noted. Major Areas Inspected:Operations,Maint & Engineering IR 05000354/19980081998-10-0909 October 1998 Insp Rept 50-354/98-08 on 980809-1019.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000354/19980091998-10-0202 October 1998 Insp Rept 50-354/98-09 on 980817-26 & 0908.No Violations Noted.Major Areas Inspected:Maint & Engineering IR 05000354/19980071998-08-25025 August 1998 Insp Rept 50-354/98-07 on 980628-0808.Violation Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000354/19980061998-07-21021 July 1998 Insp Rept 50-354/98-06 on 980517-0627.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000272/19982021998-07-0909 July 1998 Partially Deleted Insp Repts 50-272/98-202,50-311/98-202 & 50-354/98-202 on 980420-23.No Violations Noted.Major Areas Inspected:Conduct of Security & Safeguards Activities IR 05000354/19980801998-06-10010 June 1998 Insp Rept 50-354/98-80 on 980223-0319 & 0427-30.Violations Noted.Major Areas Inspected:Maint & Engineering IR 05000354/19980051998-06-0404 June 1998 Insp Rept 50-354/98-05 on 980405-0516.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000354/19980021998-04-23023 April 1998 Insp Rept 50-354/98-02 on 980222-0404.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint,Plant Support & Effectiveness of Fire Protection Program IR 05000354/19980011998-03-16016 March 1998 Insp Rept 50-354/98-01 on 980104-0221.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20199L5321998-02-0303 February 1998 Insp Rept 50-354/97-10 on 971116-980103.Violations Noted. Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support ML20197D2111997-12-10010 December 1997 Insp Rept 50-354/97-09 on 971005-1115.Apparent Violation Being Considered for Escalated Ea.Major Areas Inspected: Licensee Operations,Engineering,Maint,Plant Support & Site Security Programs ML20199D3431997-11-13013 November 1997 Insp Rept 50-354/97-07 on 970824-1004.Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support IR 05000354/19970051997-09-15015 September 1997 Insp Rept 50-354/97-05 on 970713-0823.Noncited Violations Identified.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000354/19970061997-09-0404 September 1997 Insp Rept 50-354/97-06 on 961112-970529.Violations Noted. Major Areas Inspected:Engineering ML20210N9131997-08-11011 August 1997 Insp Rept 50-354/97-04 on 970601-0712.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support ML20140J3871997-06-12012 June 1997 Insp Rept 50-354/97-03 on 970429-0531.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support ML20148D2301997-05-23023 May 1997 Insp Rept 50-354/97-02 on 970318-0428.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support.Routine Insp of Physical Protection & Security Program Also Conducted ML20137W7811997-04-14014 April 1997 Insp Rept 50-354/97-01 on 970202-0317.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint, & Plant Support ML20135A3901997-02-21021 February 1997 Insp Rept 50-354/96-11 on 961222-970201.Violation Noted. Major Areas Inspected:Operations,Engineering,Maint & Plant Support IR 05000354/19960101997-01-27027 January 1997 Insp Rept 50-354/96-10 on 961110-1221.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering,Plant Support & Security Program Plan IR 05000354/19960091996-12-0505 December 1996 Insp Rept 50-354/96-09 on 960922-1109.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support ML20129D0891996-10-18018 October 1996 Insp Rept 50-354/96-07 on 960804-0921.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000354/19950151996-02-14014 February 1996 Insp Rept 50-354/95-15 on 950905-1109.No Violations Noted. Major Areas inspected:safety-related Reactor Vessel Water Level Mod,Corrective Actons for Digital Feedwater Control Sys & RCIC Jockey Pump Corrective Action Process ML20084L7691995-05-30030 May 1995 Insp Rept 50-354/95-05 on 950406-21.No Violations Noted. Major Areas Inspected:Licensee Actions & Evaluations Associated W/Unplanned Release of Radioactive Matl from Hope Creek South Plant Vent That Occurred on 950405 IR 05000354/19930231993-12-15015 December 1993 Insp Rept 50-354/93-23 on 931004-1103.No Violations Noted. Major Areas Inspected:Review Licensee Corrective Actions of Previously Identified Edsfi Findings IR 05000354/19920191992-12-15015 December 1992 Insp Rept 50-354/92-19 on 921104-10.No Violations Noted. Major Areas Inspected:Licensees C/A for Mechanical Snubbers That Failed Functional Test & to Verify That Failed Snubbers Have Been Replaced or Restored to as-designed Condition IR 05000354/19910131991-06-21021 June 1991 Insp Rept 50-354/91-13 on 910520-24.No Violations Noted. Major Areas Inspected:Review of Several Open Items Remaining from Maint Team Insp 50-354/89-80 & Surveillance Test & Implementation IR 05000354/19900131990-07-26026 July 1990 Insp Rept 50-354/90-13 on 900618-22.No Violations Noted. Major Areas Inspected:Svc Water Intake Structure & Licensee Actions on Previous Insp Findings Re Svc Water Pipe Leak Examined IR 05000354/19900151990-07-19019 July 1990 Insp Rept 50-354/90-15 on 900625-29.No Violations Noted. Major Areas Inspected:Organization & Staffing,Training & Qualifications of Personnel,Procedures,Audits & Assessments, External & Internal Exposure Controls ML20246C4001989-08-15015 August 1989 Partially Deleted Insp Repts 50-272/89-19,50-311/89-17 & 50-354/89-15 on 890710-14 (Ref 10CFR73.21).Major Areas Inspected:Followup on Actions Taken in Response to Regulatory Effectiveness Review on 890410-14 IR 05000354/19890131989-07-20020 July 1989 Insp Rept 50-354/89-13 on 890626-30.No Violations Noted. Major Areas Inspected:Licensee Compliance to 10CFR50.62 ATWS Rule Pertaining to Alternate Rod Injection Sys IR 05000354/19890111989-07-10010 July 1989 Safety Insp Rept 50-354/89-11 on 890501-0619.No Violations Noted.Major Areas Inspected:Operations,Radiological Controls,Maint & Surveillance Testing,Emergency Preparedness,Security & LER & Open Item Followup IR 05000354/19890091989-05-10010 May 1989 Safety Insp Rept 50-354/89-09 on 890314-0430.No Violations Noted.Major Areas Inspected:Operations,Radiological Controls,Maint & Surveillance Testing,Emergency Preparedness,Security & LER Followup ML20247B6651989-05-0909 May 1989 Mgt Meeting Rept on 890307 & 0413.Major Areas Discussed: Status of Plant,Training & Safety Programs & Self Assessment Programs IR 05000354/19890021989-03-31031 March 1989 Safety Insp Rept 50-354/89-02 on 890124-0313.Violation Noted.Major Areas Inspected:Operations,Radiological Controls Maint & Surveillance Testing,Emergency Preparedness,Security & Engineering/Technical Support IR 05000354/19890061989-03-29029 March 1989 Insp Rept 50-354/89-06 on 890227-0303.No Violations Noted. Major Areas Inspected:Adequacy & Implementation of Licensees Fire Protection Program,Combustible Matl Control, Housekeeping Conditons & Fire Brigade Training IR 05000354/19890051989-03-23023 March 1989 Insp Rept 50-354/89-05 on 890227-0303.No Violations Noted. Major Areas Inspected:Adequacy,Implementation & Effectiveness of Radiological Controls Program During mid-cycle Outage,Organization,Training & Staffing IR 05000354/19890031989-02-28028 February 1989 Insp Rept 50-354/89-03 on 890206-10.No Violations Noted. Major Areas Inspected:Licensee Inservice Insp Activities to Ascertain That Inservice Insp Activities Conducted Per ASME Code & Regulatory Requirements IR 05000354/19880231988-11-0101 November 1988 Safety Insp Rept 50-354/88-23 on 880830-1011.Major Areas Inspected:Operations,Radiological Controls,Surveillance Testing,Maint,Emergency Preparedness,Security,Ler & Engineering/Technical Support IR 05000354/19880201988-10-24024 October 1988 IR 50-354/88-20 on 880906-16.No Violations Noted. Major Areas Inspected:Verification That Emergency Operating Procedures Technically Adequate IR 05000354/19880221988-09-15015 September 1988 Insp Rept 50-354/88-22 on 880712-0829.Violation Noted.Major Areas Inspected:Operations,Radiological Controls, Surveillance Testing,Maint,Emergency Preparedness,Security, Engineering/Technical Support & LER & Open Item Followup IR 05000298/19880191988-08-0303 August 1988 Insp Rept 50-298/88-19 on 880613-17.No Violations or Deviations Noted.Major Areas Inspected:Nonlicensed Staff Training,Qa Annual Review (Procurement,Receipt Insp & Audits) & Licensee Actions on Previous Concerns IR 05000354/19880181988-07-26026 July 1988 Insp Rept 50-354/88-18 on 880601-0711.No Violations Noted. Major Areas Inspected:Operational Safety Verification, Surveillance Testing,Maint Activities,Ler Followup & Assurance of Quality 1999-08-11
[Table view] Category:NRC-GENERATED
MONTHYEARIR 05000354/19990051999-10-0101 October 1999 Insp Rept 50-354/99-05 on 990711-0829.Four Violations of NRC Requirements Occurred & Being Treated as Ncvs.Major Areas Inspected:Mitigating Sys,Barrier Integrity & Performance Indicator Verification IR 05000354/19990041999-08-11011 August 1999 Insp Rept 50-354/99-04 on 990530-0711.No Violations Noted. Major Areas inspected:cornerstone-mitigating Sys,Pi Verification IR 05000354/19990031999-06-21021 June 1999 Insp Rept 50-354/99-03 on 990419-0529.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000354/19990021999-05-14014 May 1999 Insp Rept 50-354/99-02 on 990308-0418.Non-cited Violation Identified.Major Areas Inspected:Operations,Maint & Plant Support IR 05000354/19990011999-04-19019 April 1999 Insp Rept 50-354/99-01 on 990124-0307.Violations Noted.Major Areas Inspected:Operations,Engineering,Maint & Plant Support IR 05000354/19980111998-12-22022 December 1998 Insp Rept 50-354/98-11 on 981101-1212.No Violations Noted. Major Areas Inspected:Aspects of Licensee Operations, Engineering,Maint & Plant Support IR 05000354/19980101998-11-23023 November 1998 Insp Rept 50-354/98-10 on 980920-1031.Violations Noted. Major Areas Inspected:Operations,Maint & Engineering IR 05000354/19980081998-10-0909 October 1998 Insp Rept 50-354/98-08 on 980809-1019.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000354/19980091998-10-0202 October 1998 Insp Rept 50-354/98-09 on 980817-26 & 0908.No Violations Noted.Major Areas Inspected:Maint & Engineering IR 05000354/19980071998-08-25025 August 1998 Insp Rept 50-354/98-07 on 980628-0808.Violation Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000354/19980061998-07-21021 July 1998 Insp Rept 50-354/98-06 on 980517-0627.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000272/19982021998-07-0909 July 1998 Partially Deleted Insp Repts 50-272/98-202,50-311/98-202 & 50-354/98-202 on 980420-23.No Violations Noted.Major Areas Inspected:Conduct of Security & Safeguards Activities IR 05000354/19980801998-06-10010 June 1998 Insp Rept 50-354/98-80 on 980223-0319 & 0427-30.Violations Noted.Major Areas Inspected:Maint & Engineering IR 05000354/19980051998-06-0404 June 1998 Insp Rept 50-354/98-05 on 980405-0516.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000354/19980021998-04-23023 April 1998 Insp Rept 50-354/98-02 on 980222-0404.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint,Plant Support & Effectiveness of Fire Protection Program IR 05000354/19980011998-03-16016 March 1998 Insp Rept 50-354/98-01 on 980104-0221.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20199L5321998-02-0303 February 1998 Insp Rept 50-354/97-10 on 971116-980103.Violations Noted. Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support ML20197D2111997-12-10010 December 1997 Insp Rept 50-354/97-09 on 971005-1115.Apparent Violation Being Considered for Escalated Ea.Major Areas Inspected: Licensee Operations,Engineering,Maint,Plant Support & Site Security Programs ML20199D3431997-11-13013 November 1997 Insp Rept 50-354/97-07 on 970824-1004.Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support IR 05000354/19970051997-09-15015 September 1997 Insp Rept 50-354/97-05 on 970713-0823.Noncited Violations Identified.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000354/19970061997-09-0404 September 1997 Insp Rept 50-354/97-06 on 961112-970529.Violations Noted. Major Areas Inspected:Engineering ML20210N9131997-08-11011 August 1997 Insp Rept 50-354/97-04 on 970601-0712.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support ML20140J3871997-06-12012 June 1997 Insp Rept 50-354/97-03 on 970429-0531.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support ML20148D2301997-05-23023 May 1997 Insp Rept 50-354/97-02 on 970318-0428.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support.Routine Insp of Physical Protection & Security Program Also Conducted ML20137W7811997-04-14014 April 1997 Insp Rept 50-354/97-01 on 970202-0317.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint, & Plant Support ML20135A3901997-02-21021 February 1997 Insp Rept 50-354/96-11 on 961222-970201.Violation Noted. Major Areas Inspected:Operations,Engineering,Maint & Plant Support IR 05000354/19960101997-01-27027 January 1997 Insp Rept 50-354/96-10 on 961110-1221.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering,Plant Support & Security Program Plan IR 05000354/19960091996-12-0505 December 1996 Insp Rept 50-354/96-09 on 960922-1109.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support ML20129D0891996-10-18018 October 1996 Insp Rept 50-354/96-07 on 960804-0921.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000354/19950151996-02-14014 February 1996 Insp Rept 50-354/95-15 on 950905-1109.No Violations Noted. Major Areas inspected:safety-related Reactor Vessel Water Level Mod,Corrective Actons for Digital Feedwater Control Sys & RCIC Jockey Pump Corrective Action Process ML20084L7691995-05-30030 May 1995 Insp Rept 50-354/95-05 on 950406-21.No Violations Noted. Major Areas Inspected:Licensee Actions & Evaluations Associated W/Unplanned Release of Radioactive Matl from Hope Creek South Plant Vent That Occurred on 950405 IR 05000354/19930231993-12-15015 December 1993 Insp Rept 50-354/93-23 on 931004-1103.No Violations Noted. Major Areas Inspected:Review Licensee Corrective Actions of Previously Identified Edsfi Findings IR 05000354/19920191992-12-15015 December 1992 Insp Rept 50-354/92-19 on 921104-10.No Violations Noted. Major Areas Inspected:Licensees C/A for Mechanical Snubbers That Failed Functional Test & to Verify That Failed Snubbers Have Been Replaced or Restored to as-designed Condition IR 05000354/19910131991-06-21021 June 1991 Insp Rept 50-354/91-13 on 910520-24.No Violations Noted. Major Areas Inspected:Review of Several Open Items Remaining from Maint Team Insp 50-354/89-80 & Surveillance Test & Implementation IR 05000354/19900131990-07-26026 July 1990 Insp Rept 50-354/90-13 on 900618-22.No Violations Noted. Major Areas Inspected:Svc Water Intake Structure & Licensee Actions on Previous Insp Findings Re Svc Water Pipe Leak Examined IR 05000354/19900151990-07-19019 July 1990 Insp Rept 50-354/90-15 on 900625-29.No Violations Noted. Major Areas Inspected:Organization & Staffing,Training & Qualifications of Personnel,Procedures,Audits & Assessments, External & Internal Exposure Controls ML20246C4001989-08-15015 August 1989 Partially Deleted Insp Repts 50-272/89-19,50-311/89-17 & 50-354/89-15 on 890710-14 (Ref 10CFR73.21).Major Areas Inspected:Followup on Actions Taken in Response to Regulatory Effectiveness Review on 890410-14 IR 05000354/19890131989-07-20020 July 1989 Insp Rept 50-354/89-13 on 890626-30.No Violations Noted. Major Areas Inspected:Licensee Compliance to 10CFR50.62 ATWS Rule Pertaining to Alternate Rod Injection Sys IR 05000354/19890111989-07-10010 July 1989 Safety Insp Rept 50-354/89-11 on 890501-0619.No Violations Noted.Major Areas Inspected:Operations,Radiological Controls,Maint & Surveillance Testing,Emergency Preparedness,Security & LER & Open Item Followup IR 05000354/19890091989-05-10010 May 1989 Safety Insp Rept 50-354/89-09 on 890314-0430.No Violations Noted.Major Areas Inspected:Operations,Radiological Controls,Maint & Surveillance Testing,Emergency Preparedness,Security & LER Followup ML20247B6651989-05-0909 May 1989 Mgt Meeting Rept on 890307 & 0413.Major Areas Discussed: Status of Plant,Training & Safety Programs & Self Assessment Programs IR 05000354/19890021989-03-31031 March 1989 Safety Insp Rept 50-354/89-02 on 890124-0313.Violation Noted.Major Areas Inspected:Operations,Radiological Controls Maint & Surveillance Testing,Emergency Preparedness,Security & Engineering/Technical Support IR 05000354/19890061989-03-29029 March 1989 Insp Rept 50-354/89-06 on 890227-0303.No Violations Noted. Major Areas Inspected:Adequacy & Implementation of Licensees Fire Protection Program,Combustible Matl Control, Housekeeping Conditons & Fire Brigade Training IR 05000354/19890051989-03-23023 March 1989 Insp Rept 50-354/89-05 on 890227-0303.No Violations Noted. Major Areas Inspected:Adequacy,Implementation & Effectiveness of Radiological Controls Program During mid-cycle Outage,Organization,Training & Staffing IR 05000354/19890031989-02-28028 February 1989 Insp Rept 50-354/89-03 on 890206-10.No Violations Noted. Major Areas Inspected:Licensee Inservice Insp Activities to Ascertain That Inservice Insp Activities Conducted Per ASME Code & Regulatory Requirements IR 05000354/19880231988-11-0101 November 1988 Safety Insp Rept 50-354/88-23 on 880830-1011.Major Areas Inspected:Operations,Radiological Controls,Surveillance Testing,Maint,Emergency Preparedness,Security,Ler & Engineering/Technical Support IR 05000354/19880201988-10-24024 October 1988 IR 50-354/88-20 on 880906-16.No Violations Noted. Major Areas Inspected:Verification That Emergency Operating Procedures Technically Adequate IR 05000354/19880221988-09-15015 September 1988 Insp Rept 50-354/88-22 on 880712-0829.Violation Noted.Major Areas Inspected:Operations,Radiological Controls, Surveillance Testing,Maint,Emergency Preparedness,Security, Engineering/Technical Support & LER & Open Item Followup IR 05000298/19880191988-08-0303 August 1988 Insp Rept 50-298/88-19 on 880613-17.No Violations or Deviations Noted.Major Areas Inspected:Nonlicensed Staff Training,Qa Annual Review (Procurement,Receipt Insp & Audits) & Licensee Actions on Previous Concerns IR 05000354/19880181988-07-26026 July 1988 Insp Rept 50-354/88-18 on 880601-0711.No Violations Noted. Major Areas Inspected:Operational Safety Verification, Surveillance Testing,Maint Activities,Ler Followup & Assurance of Quality 1999-08-11
[Table view] Category:INSPECTION REPORT
MONTHYEARIR 05000354/19990051999-10-0101 October 1999 Insp Rept 50-354/99-05 on 990711-0829.Four Violations of NRC Requirements Occurred & Being Treated as Ncvs.Major Areas Inspected:Mitigating Sys,Barrier Integrity & Performance Indicator Verification IR 05000354/19990041999-08-11011 August 1999 Insp Rept 50-354/99-04 on 990530-0711.No Violations Noted. Major Areas inspected:cornerstone-mitigating Sys,Pi Verification IR 05000354/19990031999-06-21021 June 1999 Insp Rept 50-354/99-03 on 990419-0529.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000354/19990021999-05-14014 May 1999 Insp Rept 50-354/99-02 on 990308-0418.Non-cited Violation Identified.Major Areas Inspected:Operations,Maint & Plant Support IR 05000354/19990011999-04-19019 April 1999 Insp Rept 50-354/99-01 on 990124-0307.Violations Noted.Major Areas Inspected:Operations,Engineering,Maint & Plant Support IR 05000354/19980111998-12-22022 December 1998 Insp Rept 50-354/98-11 on 981101-1212.No Violations Noted. Major Areas Inspected:Aspects of Licensee Operations, Engineering,Maint & Plant Support IR 05000354/19980101998-11-23023 November 1998 Insp Rept 50-354/98-10 on 980920-1031.Violations Noted. Major Areas Inspected:Operations,Maint & Engineering IR 05000354/19980081998-10-0909 October 1998 Insp Rept 50-354/98-08 on 980809-1019.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000354/19980091998-10-0202 October 1998 Insp Rept 50-354/98-09 on 980817-26 & 0908.No Violations Noted.Major Areas Inspected:Maint & Engineering IR 05000354/19980071998-08-25025 August 1998 Insp Rept 50-354/98-07 on 980628-0808.Violation Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000354/19980061998-07-21021 July 1998 Insp Rept 50-354/98-06 on 980517-0627.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000272/19982021998-07-0909 July 1998 Partially Deleted Insp Repts 50-272/98-202,50-311/98-202 & 50-354/98-202 on 980420-23.No Violations Noted.Major Areas Inspected:Conduct of Security & Safeguards Activities IR 05000354/19980801998-06-10010 June 1998 Insp Rept 50-354/98-80 on 980223-0319 & 0427-30.Violations Noted.Major Areas Inspected:Maint & Engineering IR 05000354/19980051998-06-0404 June 1998 Insp Rept 50-354/98-05 on 980405-0516.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000354/19980021998-04-23023 April 1998 Insp Rept 50-354/98-02 on 980222-0404.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint,Plant Support & Effectiveness of Fire Protection Program IR 05000354/19980011998-03-16016 March 1998 Insp Rept 50-354/98-01 on 980104-0221.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20199L5321998-02-0303 February 1998 Insp Rept 50-354/97-10 on 971116-980103.Violations Noted. Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support ML20197D2111997-12-10010 December 1997 Insp Rept 50-354/97-09 on 971005-1115.Apparent Violation Being Considered for Escalated Ea.Major Areas Inspected: Licensee Operations,Engineering,Maint,Plant Support & Site Security Programs ML20199D3431997-11-13013 November 1997 Insp Rept 50-354/97-07 on 970824-1004.Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support IR 05000354/19970051997-09-15015 September 1997 Insp Rept 50-354/97-05 on 970713-0823.Noncited Violations Identified.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000354/19970061997-09-0404 September 1997 Insp Rept 50-354/97-06 on 961112-970529.Violations Noted. Major Areas Inspected:Engineering ML20210N9131997-08-11011 August 1997 Insp Rept 50-354/97-04 on 970601-0712.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support ML20140J3871997-06-12012 June 1997 Insp Rept 50-354/97-03 on 970429-0531.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support ML20148D2301997-05-23023 May 1997 Insp Rept 50-354/97-02 on 970318-0428.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support.Routine Insp of Physical Protection & Security Program Also Conducted ML20137W7811997-04-14014 April 1997 Insp Rept 50-354/97-01 on 970202-0317.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint, & Plant Support ML20135A3901997-02-21021 February 1997 Insp Rept 50-354/96-11 on 961222-970201.Violation Noted. Major Areas Inspected:Operations,Engineering,Maint & Plant Support IR 05000354/19960101997-01-27027 January 1997 Insp Rept 50-354/96-10 on 961110-1221.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering,Plant Support & Security Program Plan IR 05000354/19960091996-12-0505 December 1996 Insp Rept 50-354/96-09 on 960922-1109.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support ML20129D0891996-10-18018 October 1996 Insp Rept 50-354/96-07 on 960804-0921.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000354/19950151996-02-14014 February 1996 Insp Rept 50-354/95-15 on 950905-1109.No Violations Noted. Major Areas inspected:safety-related Reactor Vessel Water Level Mod,Corrective Actons for Digital Feedwater Control Sys & RCIC Jockey Pump Corrective Action Process ML20084L7691995-05-30030 May 1995 Insp Rept 50-354/95-05 on 950406-21.No Violations Noted. Major Areas Inspected:Licensee Actions & Evaluations Associated W/Unplanned Release of Radioactive Matl from Hope Creek South Plant Vent That Occurred on 950405 IR 05000354/19930231993-12-15015 December 1993 Insp Rept 50-354/93-23 on 931004-1103.No Violations Noted. Major Areas Inspected:Review Licensee Corrective Actions of Previously Identified Edsfi Findings IR 05000354/19920191992-12-15015 December 1992 Insp Rept 50-354/92-19 on 921104-10.No Violations Noted. Major Areas Inspected:Licensees C/A for Mechanical Snubbers That Failed Functional Test & to Verify That Failed Snubbers Have Been Replaced or Restored to as-designed Condition IR 05000354/19910131991-06-21021 June 1991 Insp Rept 50-354/91-13 on 910520-24.No Violations Noted. Major Areas Inspected:Review of Several Open Items Remaining from Maint Team Insp 50-354/89-80 & Surveillance Test & Implementation IR 05000354/19900131990-07-26026 July 1990 Insp Rept 50-354/90-13 on 900618-22.No Violations Noted. Major Areas Inspected:Svc Water Intake Structure & Licensee Actions on Previous Insp Findings Re Svc Water Pipe Leak Examined IR 05000354/19900151990-07-19019 July 1990 Insp Rept 50-354/90-15 on 900625-29.No Violations Noted. Major Areas Inspected:Organization & Staffing,Training & Qualifications of Personnel,Procedures,Audits & Assessments, External & Internal Exposure Controls ML20246C4001989-08-15015 August 1989 Partially Deleted Insp Repts 50-272/89-19,50-311/89-17 & 50-354/89-15 on 890710-14 (Ref 10CFR73.21).Major Areas Inspected:Followup on Actions Taken in Response to Regulatory Effectiveness Review on 890410-14 IR 05000354/19890131989-07-20020 July 1989 Insp Rept 50-354/89-13 on 890626-30.No Violations Noted. Major Areas Inspected:Licensee Compliance to 10CFR50.62 ATWS Rule Pertaining to Alternate Rod Injection Sys IR 05000354/19890111989-07-10010 July 1989 Safety Insp Rept 50-354/89-11 on 890501-0619.No Violations Noted.Major Areas Inspected:Operations,Radiological Controls,Maint & Surveillance Testing,Emergency Preparedness,Security & LER & Open Item Followup IR 05000354/19890091989-05-10010 May 1989 Safety Insp Rept 50-354/89-09 on 890314-0430.No Violations Noted.Major Areas Inspected:Operations,Radiological Controls,Maint & Surveillance Testing,Emergency Preparedness,Security & LER Followup ML20247B6651989-05-0909 May 1989 Mgt Meeting Rept on 890307 & 0413.Major Areas Discussed: Status of Plant,Training & Safety Programs & Self Assessment Programs IR 05000354/19890021989-03-31031 March 1989 Safety Insp Rept 50-354/89-02 on 890124-0313.Violation Noted.Major Areas Inspected:Operations,Radiological Controls Maint & Surveillance Testing,Emergency Preparedness,Security & Engineering/Technical Support IR 05000354/19890061989-03-29029 March 1989 Insp Rept 50-354/89-06 on 890227-0303.No Violations Noted. Major Areas Inspected:Adequacy & Implementation of Licensees Fire Protection Program,Combustible Matl Control, Housekeeping Conditons & Fire Brigade Training IR 05000354/19890051989-03-23023 March 1989 Insp Rept 50-354/89-05 on 890227-0303.No Violations Noted. Major Areas Inspected:Adequacy,Implementation & Effectiveness of Radiological Controls Program During mid-cycle Outage,Organization,Training & Staffing IR 05000354/19890031989-02-28028 February 1989 Insp Rept 50-354/89-03 on 890206-10.No Violations Noted. Major Areas Inspected:Licensee Inservice Insp Activities to Ascertain That Inservice Insp Activities Conducted Per ASME Code & Regulatory Requirements IR 05000354/19880231988-11-0101 November 1988 Safety Insp Rept 50-354/88-23 on 880830-1011.Major Areas Inspected:Operations,Radiological Controls,Surveillance Testing,Maint,Emergency Preparedness,Security,Ler & Engineering/Technical Support IR 05000354/19880201988-10-24024 October 1988 IR 50-354/88-20 on 880906-16.No Violations Noted. Major Areas Inspected:Verification That Emergency Operating Procedures Technically Adequate IR 05000354/19880221988-09-15015 September 1988 Insp Rept 50-354/88-22 on 880712-0829.Violation Noted.Major Areas Inspected:Operations,Radiological Controls, Surveillance Testing,Maint,Emergency Preparedness,Security, Engineering/Technical Support & LER & Open Item Followup IR 05000298/19880191988-08-0303 August 1988 Insp Rept 50-298/88-19 on 880613-17.No Violations or Deviations Noted.Major Areas Inspected:Nonlicensed Staff Training,Qa Annual Review (Procurement,Receipt Insp & Audits) & Licensee Actions on Previous Concerns IR 05000354/19880181988-07-26026 July 1988 Insp Rept 50-354/88-18 on 880601-0711.No Violations Noted. Major Areas Inspected:Operational Safety Verification, Surveillance Testing,Maint Activities,Ler Followup & Assurance of Quality 1999-08-11
[Table view] Category:UTILITY
MONTHYEARIR 05000354/19900131990-07-26026 July 1990 Insp Rept 50-354/90-13 on 900618-22.No Violations Noted. Major Areas Inspected:Svc Water Intake Structure & Licensee Actions on Previous Insp Findings Re Svc Water Pipe Leak Examined IR 05000354/19900151990-07-19019 July 1990 Insp Rept 50-354/90-15 on 900625-29.No Violations Noted. Major Areas Inspected:Organization & Staffing,Training & Qualifications of Personnel,Procedures,Audits & Assessments, External & Internal Exposure Controls ML20246C4001989-08-15015 August 1989 Partially Deleted Insp Repts 50-272/89-19,50-311/89-17 & 50-354/89-15 on 890710-14 (Ref 10CFR73.21).Major Areas Inspected:Followup on Actions Taken in Response to Regulatory Effectiveness Review on 890410-14 IR 05000354/19890131989-07-20020 July 1989 Insp Rept 50-354/89-13 on 890626-30.No Violations Noted. Major Areas Inspected:Licensee Compliance to 10CFR50.62 ATWS Rule Pertaining to Alternate Rod Injection Sys IR 05000354/19890111989-07-10010 July 1989 Safety Insp Rept 50-354/89-11 on 890501-0619.No Violations Noted.Major Areas Inspected:Operations,Radiological Controls,Maint & Surveillance Testing,Emergency Preparedness,Security & LER & Open Item Followup IR 05000354/19890091989-05-10010 May 1989 Safety Insp Rept 50-354/89-09 on 890314-0430.No Violations Noted.Major Areas Inspected:Operations,Radiological Controls,Maint & Surveillance Testing,Emergency Preparedness,Security & LER Followup ML20247B6651989-05-0909 May 1989 Mgt Meeting Rept on 890307 & 0413.Major Areas Discussed: Status of Plant,Training & Safety Programs & Self Assessment Programs IR 05000354/19890021989-03-31031 March 1989 Safety Insp Rept 50-354/89-02 on 890124-0313.Violation Noted.Major Areas Inspected:Operations,Radiological Controls Maint & Surveillance Testing,Emergency Preparedness,Security & Engineering/Technical Support IR 05000354/19890061989-03-29029 March 1989 Insp Rept 50-354/89-06 on 890227-0303.No Violations Noted. Major Areas Inspected:Adequacy & Implementation of Licensees Fire Protection Program,Combustible Matl Control, Housekeeping Conditons & Fire Brigade Training IR 05000354/19890051989-03-23023 March 1989 Insp Rept 50-354/89-05 on 890227-0303.No Violations Noted. Major Areas Inspected:Adequacy,Implementation & Effectiveness of Radiological Controls Program During mid-cycle Outage,Organization,Training & Staffing IR 05000354/19890031989-02-28028 February 1989 Insp Rept 50-354/89-03 on 890206-10.No Violations Noted. Major Areas Inspected:Licensee Inservice Insp Activities to Ascertain That Inservice Insp Activities Conducted Per ASME Code & Regulatory Requirements IR 05000354/19880231988-11-0101 November 1988 Safety Insp Rept 50-354/88-23 on 880830-1011.Major Areas Inspected:Operations,Radiological Controls,Surveillance Testing,Maint,Emergency Preparedness,Security,Ler & Engineering/Technical Support IR 05000354/19880221988-09-15015 September 1988 Insp Rept 50-354/88-22 on 880712-0829.Violation Noted.Major Areas Inspected:Operations,Radiological Controls, Surveillance Testing,Maint,Emergency Preparedness,Security, Engineering/Technical Support & LER & Open Item Followup IR 05000298/19880191988-08-0303 August 1988 Insp Rept 50-298/88-19 on 880613-17.No Violations or Deviations Noted.Major Areas Inspected:Nonlicensed Staff Training,Qa Annual Review (Procurement,Receipt Insp & Audits) & Licensee Actions on Previous Concerns IR 05000354/19880181988-07-26026 July 1988 Insp Rept 50-354/88-18 on 880601-0711.No Violations Noted. Major Areas Inspected:Operational Safety Verification, Surveillance Testing,Maint Activities,Ler Followup & Assurance of Quality IR 05000354/19880161988-07-0606 July 1988 Insp Rept 50-354/88-16 on 880426-0531.No Violations Noted. Major Areas Inspected:Operational Safety Verification, Surveillance Testing,Maint Activities,Esf Sys Walkdown,Ler Followup,Emergency Preparedness & Assurance of Quality IR 05000354/19880101988-06-21021 June 1988 Insp Rept 50-354/88-10 on 880404-08.No Violations Noted. Major Areas Inspected:Review of Previously Identified Unresolved Items & Maint Outage Mgt That Encompassed Observations of Limitorque Valve Operator Insp IR 05000354/19880141988-06-20020 June 1988 Insp Rept 50-354/88-14 on 880418-22.No Violations or Deviations Noted.Major Areas Inspected:Solid Radwaste Processing,Preparation,Packaging & Shipping Program, Including Previously Identified Items ML20196J0671988-06-17017 June 1988 Enforcement Conference Rept 50-354/88-20 on 880609.Major Areas Inspected:Dept of Labor Determination That Contractor Bogan Discriminated Against Employee for Raising Safety Concerns.Agenda & Supporting Info Encl IR 05000354/19880171988-06-0202 June 1988 Insp Rept 50-354/88-17 on 880509-13.No Violations Noted. Major Areas Inspected:Licensee Effluent Controls,Liquid Effluent,Gaseous Effluent,Effluent Monitor Calibr, Ventilation Sys & Offsite Dose Calculation Manual IR 05000354/19880151988-06-0202 June 1988 Insp Rept 50-354/88-15 on 880418-22.No Violations or Deviations Noted.Major Areas Inspected:Startup Test Program Following First Refueling,Including Review of Startup Test Procedures & Test Results Evaluation IR 05000354/19880091988-05-24024 May 1988 Insp Rept 50-354/88-09 on 880322-0425.No Violations Noted. Major Areas Inspected:Operational Safety Verification, Surveillance Testing,Maint Activities,Review of Maint Program,Esf Sys Walkdown & Assurance of Quality ML20197E2951988-05-19019 May 1988 Insp Rept 50-354/88-11 on 880321-25.No Violations or Deviations Noted.Major Areas Inspected:Review of Licensee Action in Response to Mark I Containment Mod Requirements of NUREG-0661 IR 05000354/19880081988-04-20020 April 1988 Insp Rept 50-354/88-08 on 880314-18.No Violations or Deviations Noted.Major Areas Inspected:Local Leak Rate Testing of Containment Isolation Boundaries & Implementation of Inservice Test Program for Pumps & Valves IR 05000354/19880061988-04-20020 April 1988 Insp Rept 50-354/88-06 on 880229-0303.No Violations Noted. Major Areas Inspected:Licensee Actions on Previous Findings, Organization & Staffing,Communications,Audits,Alara & High Radiation Area Access Control IR 05000354/19880131988-04-14014 April 1988 Insp Rept 50-354/88-13 on 880328-29.No Violations Noted. Major Areas Inspected:Inservice Insp Activities to Ascertain Whether Licensee Activities Conducted in Compliance W/ Applicable ASME Code & Regulatory Requirements ML20151W1711988-04-0909 April 1988 Insp Rept 50-354/88-03 on 880126-29.Violation Noted.Major Areas Inspected:Licensee Environ Qualification Program & Licensee Response & Resolutions to Equipment Concerns Identified in SER IR 05000354/19880051988-04-0404 April 1988 Onsite Resident Insp Rept 50-354/88-05 on 880209-0321. Violation Noted.Major Areas Inspected:Operational Safety Verification,Surveillance Testing,Maint Activities,Reactor Coolant Spill in Torus Basement & Assurance of Quality IR 05000272/19880061988-03-18018 March 1988 Partially Withheld Physical Security Insp Repts 50-272/88-06,50-311/88-06 & 50-354/88-04 on 880201-05 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected: Procedures,Security Organization & Mgt Effectiveness IR 05000354/19880011988-03-0404 March 1988 Insp Rept 50-354/88-01 on 880105-0208.Violation Noted.Major Areas Inspected:Followup of Outstanding Insp Items, Operational Safety Verification,Surveillance Testing,Maint Activities,Esf Sys Walkdown,Lers & Design Change Packages IR 05000354/19870271987-12-31031 December 1987 Radiological Controls Insp Rept 50-354/87-27 on 871116-18 & 20.No Violations Noted.Major Areas Inspected:Process & Area Radiation Monitor Surveillance Testing,Sealed Sources, Radiological Controls for New Fuel Receipt & Insp & ALARA IR 05000354/19870281987-12-21021 December 1987 Insp Rept 50-354/87-28 on 871116-20.No Violation Noted.Major Areas Inspected:Radiochemical Measurements Program, Confirmatory Measurements,Audits & Boron Analysis IR 05000354/19870251987-11-25025 November 1987 Insp Rept 50-354/87-25 on 870921-25.No Violations Noted. Major Areas Inspected:Organization & Staffing,Mgt Oversight, Training & Qualification,External Exposure Controls,Alara, Internal Exposure Controls & High Radiation Area Controls IR 05000354/19870201987-11-0303 November 1987 Emergency Preparedness Insp Rept 50-354/87-20 on 870908-10. No Violations Noted.Major Areas Inspected:Observation of Licensee Full Participation,Emergency Exercise Conducted on 870909 & Insp of Training Records ML20235T8501987-10-0101 October 1987 Insp Rept 50-354/87-17 on 870714-0817.Violation Noted.Major Areas Inspected:Followup on Outstanding Insp Items,Maint Activities,Operational Safety Verification,Surveillance Testing,Esf Sys Walkdown & Instrument Calibr Data Cards IR 05000354/19870191987-10-0101 October 1987 Insp Rept 50-354/87-19 on 870727-30.No Violations Noted. Major Areas Inspected:Licensee Action on Previous NRC Findings,Organization & Staffing,Audits & External Exposure Control IR 05000354/19870211987-09-0404 September 1987 Insp Rept 50-354/87-21 on 870817-21.No Violations or Deviations Noted.Major Areas Inspected:Licensee Program for Resolving QA Action Requests IR 05000354/19870161987-07-20020 July 1987 Insp Rept 50-354/87-16 on 870609-0713.Violations Noted. Major Areas Inspected:Followup on Outstanding Insp Items, Operational Safety Verification,Surveillance Testing,Maint Activities,Esf Sys Walkdown & LER Followup IR 05000354/19870141987-07-0606 July 1987 Insp Rept 50-354/87-14 on 870512-0608.Deviation Noted.Major Areas Inspected:Outstanding Insp Items,Operational Safety Verification,Surveillance Testing,Maint Activities,Esf Sys Walkdown & LER Followup IR 05000354/19870131987-06-0101 June 1987 Insp Rept 50-354/87-13 on 870504-06 & 12.No Violations Noted.Major Areas Inspected:Licensee Activities in Areas of Surveillance Testing,Procedures & Records IR 05000354/19870111987-05-28028 May 1987 Insp Rept 50-354/87-11 on 870414-0511.Major Areas Inspected: Followup on Outstanding Insp Items,Operational Safety Verification & Security Insp.Addl Mgt Attention Needed in Housekeeping Area to Ensure Cleanliness Stds Maintained IR 05000354/19870101987-04-0707 April 1987 Insp Rept 50-354/87-10 on 870316-20.No Violations Noted. Major Areas inspected:post-accident Monitoring Sys Conformance W/Rev 2 to Reg Guide 1.97.Open Item Identified Re Identification of Category 2 Equipment IR 05000354/19870071987-04-0303 April 1987 Insp Rept 50-354/87-07 on 870309-13.Unresolved Items Re Evaluation of Offgas Delay Time & Determination of Dose & Dose Commitments & Continuing Problems W/Licensee Process & Effluent Monitors Noted IR 05000354/19870061987-03-23023 March 1987 Insp Rept 50-354/87-06 on 870224-26.No Violations Noted. Major Areas Inspected:Power Ascension Test Program,Plateau Review,Test Results Evaluation,Outstanding Results Deficiencies,Qa Interface & Independent Measurements IR 05000354/19870031987-03-23023 March 1987 Insp Rept 50-354/87-03 on 870209-13.No Violations,Deviations or Unresolved Items Noted.Major Areas Inspected:Emergency Preparedness Program IR 05000354/19870051987-03-20020 March 1987 Insp Rept 50-354/87-05 on 870210-0309.Violation Noted: Failure to Obtain & Analyze Grab Samples of Cooling Tower Blowdown Line.Unresolved Item Noted Re Environ Qualification of MSIV Terminal Boxes IR 05000354/19870011987-03-0404 March 1987 Insp Rept 50-354/87-01 on 870101-0209.Violation Noted: Failure to Obtain & Analyze Grab Samples Per Drywell Leak Detection Action Statement IR 05000354/19870041987-03-0404 March 1987 Insp Rept 50-354/87-04 on 870127-30.No Violations Noted. Major Areas Inspected:Nonradiological Chemistry Program, Including Measurement Control & Analytical Procedure Evaluations IR 05000354/19870021987-02-0606 February 1987 Safety Insp Rept 50-354/87-02 on 870112-16.Violations Noted: Failure to Properly Identify & Quantify Fe-59 & Zr-95 in Shipment 86-04,Details 6.1 & 6.4 & Incorrect Certification for Shipment 86-04,Detail 6.1 IR 05000354/19860601987-02-0505 February 1987 Physical Security Insp Rept 50-354/86-60 on 861230.No Violation Noted.Major Areas Inspected:Review of Licensee Program for Conducting Contingency Drills to Evaluate Effectiveness & Impact of Drills During Security Activities 1990-07-26
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000354/19983021999-10-13013 October 1999 Suppl NRC Operator Licensing Exam Rept 50-354/98-302 on 991025-29 (NRC Onsite Review),Mgt Meeting on 990322, in-office Reviews on 990429-30 & 0617-18 & Telephone Call on Appeal Results on 990720 IR 05000354/19990051999-10-0101 October 1999 Insp Rept 50-354/99-05 on 990711-0829.Four Violations of NRC Requirements Occurred & Being Treated as Ncvs.Major Areas Inspected:Mitigating Sys,Barrier Integrity & Performance Indicator Verification PNO-I-99-043, on 990916,Hurricane Floyd Was Approaching Ccnpp,Sgs,Hcgs & Ocnpp.Hurricane Was Centered at Latitude 36.0 North & Longitude 76.6 West & Moving north-northeast at Approx 25 Mph.Plants Remain at Power1999-09-16016 September 1999 PNO-I-99-043:on 990916,Hurricane Floyd Was Approaching Ccnpp,Sgs,Hcgs & Ocnpp.Hurricane Was Centered at Latitude 36.0 North & Longitude 76.6 West & Moving north-northeast at Approx 25 Mph.Plants Remain at Power IR 05000354/19990041999-08-11011 August 1999 Insp Rept 50-354/99-04 on 990530-0711.No Violations Noted. Major Areas inspected:cornerstone-mitigating Sys,Pi Verification IR 05000354/19990031999-06-21021 June 1999 Insp Rept 50-354/99-03 on 990419-0529.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000354/19990021999-05-14014 May 1999 Insp Rept 50-354/99-02 on 990308-0418.Non-cited Violation Identified.Major Areas Inspected:Operations,Maint & Plant Support IR 05000354/19990011999-04-19019 April 1999 Insp Rept 50-354/99-01 on 990124-0307.Violations Noted.Major Areas Inspected:Operations,Engineering,Maint & Plant Support IR 05000354/19980111998-12-22022 December 1998 Insp Rept 50-354/98-11 on 981101-1212.No Violations Noted. Major Areas Inspected:Aspects of Licensee Operations, Engineering,Maint & Plant Support ML20196D0911998-11-23023 November 1998 Notice of Violation from Insp on 980920-1031.Violation Noted:On 981001,electricians Placed Single Degraded Cell Associated with Operable 1E Battery Bank on Single Cell Charge IR 05000354/19980101998-11-23023 November 1998 Insp Rept 50-354/98-10 on 980920-1031.Violations Noted. Major Areas Inspected:Operations,Maint & Engineering PNO-I-98-053, on 981115,plant Experienced Turbine Trip While Operating at 95% Power Due to High Level Condition on One of Two Moisture Separators.Reactor Automatically Shut Down.Util Evaluating Incorrect Sys Drawing.States of Nj & DE Notifie1998-11-16016 November 1998 PNO-I-98-053:on 981115,plant Experienced Turbine Trip While Operating at 95% Power Due to High Level Condition on One of Two Moisture Separators.Reactor Automatically Shut Down.Util Evaluating Incorrect Sys Drawing.States of Nj & DE Notifie ML20154Q7381998-10-16016 October 1998 Second Suppl to NRC Exam Rept 50-354/98-03OL for Tests Administered on 980304-12,0519-21,22-28 & 0629.Five of Five Reactor Operator Applicants & Four of Five Senior Reactor Applicants Passed Exams ML20154J8611998-10-0909 October 1998 Notice of Violation from Insp on 980809-0919.Violation Noted:On 980831,licensee Did Not Promptly Correct Condition Adverse to Quality in That 'C' Residual Heat Removal Pump Rendered Inoperable IR 05000354/19980081998-10-0909 October 1998 Insp Rept 50-354/98-08 on 980809-1019.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000354/19980091998-10-0202 October 1998 Insp Rept 50-354/98-09 on 980817-26 & 0908.No Violations Noted.Major Areas Inspected:Maint & Engineering IR 05000354/19983011998-09-0404 September 1998 Exam Rept 50-354/98-301OL Conducted on 980810-12.Exam Results:Four SRO Candidates Performed Well on Both Written & Operating Portions of Exam.All Four Were Issued Licenses ML20237E4981998-08-25025 August 1998 Notice of Violation from Insp on 980628-0808.Violation Noted:As of 980810,util Had Not Corrected Known Deficiency in Verifying MSIV Full Closed During Springs Only Full Stroke Closing Tests IR 05000354/19980071998-08-25025 August 1998 Insp Rept 50-354/98-07 on 980628-0808.Violation Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000354/19980061998-07-21021 July 1998 Insp Rept 50-354/98-06 on 980517-0627.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20236T1601998-07-21021 July 1998 Notice of Violation from Insp on 980517-0627.Violation Noted:As of Oct 1997,chemistry Technicians Did Not Sample & Analyze Diesel Fuel Oil Deliveries for Particulates & Did Not Report Results by Written Notification within 14 Days IR 05000272/19982021998-07-0909 July 1998 Partially Deleted Insp Repts 50-272/98-202,50-311/98-202 & 50-354/98-202 on 980420-23.No Violations Noted.Major Areas Inspected:Conduct of Security & Safeguards Activities IR 05000354/19980031998-06-16016 June 1998 Suppl to NRC Licensing Exam Rept 50-354/98-03OL (Including Completed & Graded Tests) for Tests Administered on 980223- 0304 IR 05000354/19980801998-06-10010 June 1998 Insp Rept 50-354/98-80 on 980223-0319 & 0427-30.Violations Noted.Major Areas Inspected:Maint & Engineering ML20249A2031998-06-10010 June 1998 Notice of Violation from Insp on 980223-0319 & 0427-30. Violation Noted:Conditions Adverse to Quality Were Not Promptly Identified & Corrected IR 05000354/19980991998-06-0808 June 1998 SALP Rept 50-354/98-99 for Period of 961110-980516 ML20249A1071998-06-0404 June 1998 Notice of Violation from Insp on 980405-0516.Violation Noted:During Refueling Outage RF03 in Dec 1990 Licensee Did Not Maintain RHR Sys in Operation IR 05000354/19980051998-06-0404 June 1998 Insp Rept 50-354/98-05 on 980405-0516.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20217M0491998-04-28028 April 1998 NRC Operator Licensing Exam Rept 50-354/98-03OL,(including Completed & Graded Tests) for Tests Administered on 980223-0304 ML20217N6221998-04-24024 April 1998 Notice of Violation from Investigation Conducted by Oi. Violation Noted:Safeguard Event Log,Required to Be Maintained by Licensee,Was Not Complete & Accurate in All Matl Aspects IR 05000354/19980021998-04-23023 April 1998 Insp Rept 50-354/98-02 on 980222-0404.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint,Plant Support & Effectiveness of Fire Protection Program ML20217H8051998-04-23023 April 1998 Notice of Violation from Insp on 980222-0404.Violation Noted:Three Examples of Inadequate Accomplishment of Procedure Control Associated W/Temporary Equipment Installed in Plant Svc Water Intake Structure ML20217C6711998-03-20020 March 1998 Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $55,000.Violation Noted:On 971112,while Reactor Was in Cold Shutdown W/Rv Head Removed,Operators Did Not Verify That CR Position Did Not Change During Withdrawal ML20217D8291998-03-17017 March 1998 EN-98-013:informs That NOV & Proposed Imposition of Civil Penalty in Amount of $55,000 Will Be Issued on or About 980330 to Pse&G.Civil Penalty Based on Violation Involving Failure by Operating Crew to Follow Procedures IR 05000354/19980011998-03-16016 March 1998 Insp Rept 50-354/98-01 on 980104-0221.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20199L4791998-02-0303 February 1998 Notice of Violation from Insp on 971126-980103.Violation Noted:On 971124,maint Technicians Failed to Follow HC.IC-DC.ZZ-0140(Q),Rev 3, Device/Equipment Calibration Masonleilan Pressure & Temperature Controllers ML20199L5321998-02-0303 February 1998 Insp Rept 50-354/97-10 on 971116-980103.Violations Noted. Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support ML20197D2111997-12-10010 December 1997 Insp Rept 50-354/97-09 on 971005-1115.Apparent Violation Being Considered for Escalated Ea.Major Areas Inspected: Licensee Operations,Engineering,Maint,Plant Support & Site Security Programs ML20199D3431997-11-13013 November 1997 Insp Rept 50-354/97-07 on 970824-1004.Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support ML20199D3171997-11-12012 November 1997 Notice of Violation from Insp on 970824-1004.Violation Noted:On 970914,electric motor-driven Fire Pump Supply Breaker Opened During Electrical Bus Swap Which Rendered Pump Inoperable ML20196J6531997-10-20020 October 1997 Notice of Violation from Insp on 970202 & 0317.Violation Noted:In Apr 1994,licensee Made Changes to Facility That Involved USQ Without Prior Commission Approval ML20198L9531997-10-15015 October 1997 NRC Operator Licensing Exam Rept 50-354/97-08OL for Tests Administered on 970929-1002.Exam Results:Four Candidates Passed All Portions of License Exam.One Candidate Failed Written Exam IR 05000354/19970051997-09-15015 September 1997 Insp Rept 50-354/97-05 on 970713-0823.Noncited Violations Identified.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000354/19970061997-09-0404 September 1997 Insp Rept 50-354/97-06 on 961112-970529.Violations Noted. Major Areas Inspected:Engineering ML20210N9061997-08-11011 August 1997 Notice of Violation from Insp on 970601-0712.Violation Noted:Inoperable HPCI Sys Injection Valve Was Not Promptly Identified ML20210N9131997-08-11011 August 1997 Insp Rept 50-354/97-04 on 970601-0712.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support ML20217E7851997-07-25025 July 1997 Investigation Rept 1-96-024 on 970725.No Noncompliance Noted.Major Areas Investigated:Allegations Re Failure to Make 10CFR73.71 Notification by Station Security Dept ML20140J3811997-06-12012 June 1997 Notice of Violation from Insp on 970429-0531.Violation Noted:Failing to Adhere to Established Procedural Guidance for safety-related Activities Were Identified,Significant Condition Adverse to Quality ML20140J3871997-06-12012 June 1997 Insp Rept 50-354/97-03 on 970429-0531.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support ML20148D2301997-05-23023 May 1997 Insp Rept 50-354/97-02 on 970318-0428.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support.Routine Insp of Physical Protection & Security Program Also Conducted ML20148D2011997-05-23023 May 1997 Notice of Violation from Insp on 970318-0428.Violation Noted:On 970423,operators Failed to Shut Six of Twelve Cylinder Indicator Test Cocks Following Completion of C Emergency Diesel Generator pre-start Checks 1999-09-16
[Table view] |
Text
I
.
.
U.S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND EllFORCEMENT .
.
Region I Report No. 50-35U32-06__
.
Docket No. 50-354 License No. CPPR-120 Priority --
_
Category A Licensee: Publjc_ Service Electric and Gas Company 80 Park Plaza - 17C Newark, New Jersey 07101 Facility Name: H_ ope Creek Generating Station,_U}it f 1 f nspection at: Hancocks Bridge, New Jersey f nspection conducted: May 3 - 31, 1982 Inspectors: _ ._ Q
~ ~ dat2 signed
, Ba man, n'or Resident Inspector i t f
bdate signed A. A. Varela, Reactor Inspector date signed Approved by: /.[. Chief, Projects section 2A h 72-da'te signed
. E. Tri Inspection Summary:
Unit 1 Inspection of May 3-31, 1982 (Report No. 50-354/82-06):
Areas Inspected: Routine unannounced safety inspection by the resident inspector (87 hours0.00101 days <br />0.0242 hours <br />1.438492e-4 weeks <br />3.31035e-5 months <br />)
and one regional based specialist inspector (38 hours4.398148e-4 days <br />0.0106 hours <br />6.283069e-5 weeks <br />1.4459e-5 months <br />) of work in progress including
,
l reactor pressure vessel internals installation, service water intake structure (SWIS)
foundation construction, structural steel erection, pipe and hanger installation, maintenance and storage of equipment and materials in and adjacent to the power block, cable tray support installation, HVAC ductwork and support installation, handling and rigging of diesel generator, electrical penetration installation, and concrete pre-
placement activities. The inspectors also made tours of the site, reviewed licensee
'
action on construction deficiency reports, inspected the welder qualification program, evaluated qualification records of a sampling of site QC personnel, and reviewed QC records of heave / settlement monitoring, bioshield high density concrete placement, and and SWIS tremie placement and corin Results: No items of noncompliance were identifie Region 1 Form 12 (Rev April 77) 8206240213 820610 PDR ADOCK 05000354 0 PDR I
.
...
.
_
, . . .
.
DETAILS 1. Persons Contacted Public Service Electric and Gas Company (PSE&G)
A. Barnabei, Site QA Engineer R. Bravo, Principal Construction Engineer G. Dalton, Senior Construction Engineer A. E. Giardino, Project QA Engineer P. Kudless, Project Construction Manager G. Owen, Principal Construction Engineer j,
Bechtel Power Corporation (Bechtel)
B. Bain, Lead Welding Engineer J. Benner, Contract Administration A. J. Bryan, Assistant Project QC Engineer C. Colletto, Assistant Lead QCE - Civil W. Dorman, Assistant Project Field Engineer M. Drucker, Lead Site QA Engineer R. Hanks, Project QC Engineer M. Henry, Project Field Engineer D. Long, Project Superintendent R. Mackey, Resident Project Engineer J. R. McCoy, Lead Contracts QC Engineer K. Mills, Lead QCE Mechanical G. Moulton, Project QA Engineer D. Sakers, Assistant Project QC Engineer J. Serafin, Assistant Project Field Engineer D. Stover, Project Superintendent, Contract Administration S. Vezendy, Lead Welding QC Engineer General Electric Installation and Services Engineering (GEI&SE)
R. Burke, Site-Project Manager M. Hart, Site QC-Supervisor General Electric Nuclear Energy Business Operations (GENEB0)
J. Cockrof t, Site Engineer C. Brinson, Site QA Engineer J. Rich Steers (JRS)
J. Gagliano, Field Engineer T. Hughes, Site Project Superintendent M. Russell, Site QC Supervisor J. Saums, Sponser Engineer
.
.
W-H Constructors (W-H)
R. Garvey, Site Project Manager S. Herschman, Corporate QA Manager M. Wita, Site QC Manager Site Tour Routine inspections were made to observe the status of work and construction activities in progress. The inspector noted the presence of and interviewed QC and construction personnel. Inspection personnel were observed performing required inspections and those interviewed were knowledgeable in their work activities. Work items were examined for obvious defects or noncompliance with regulatory requirements or license conditions. Areas inspected included structural steel erection, maintenance and storage of equipment and materials in and adjacent to the power block, cable tray and support installation, HVAC ductwork and support installation, housekeeping and fire protection, and con-crete preplacement preparation No items of noncompliance were identifie . Review of Nonroutine Events Reported by the Licensee On April 7,1982, the licensee reported a potential significant con-struction deficiency in accordance with the requirements of 10 CFR 50.55(e) involving deflected main steam line bellows assemblies. These bellows form the containment pressure boundary where the steam lines pass out of containment. On May 6, 1982, the licensee notified the NRC that their evaluation of the deflection of the bellows indicated that the problem was not reportable and withdrew the ite The deflection of three bellows resulted from deflection of the process pipes to which one end of each bellows was attached. The deflection of I two process pipes was caused by improper installation of pipe support steel. The deflection of a third bellows resulted from moving the pro-cess pipe while the bellows was independently supported. The problem was identified by comparison of survey readings taken at different times
to ensure the correct location of the process pipes. The bellows, de-
'
signed and manufactured by Zallea Brothers, Inc., were limited in the amount of deflection they could withstand without jeopardizing their integrity, i
, -
--.
. .
Because the limit on the amount of bellows deflection was not known with any certainty at the time the problem was identified, the licensee reported it as a potential construction deficiency. Subsequent evalua-tion of the bellows deflection limit was performed by Zallea Brothers, Bechtel, and the licensee and the results indicated that the Hope Creek bellows were not deflected beyond design limits and that the problem, had it gone undetected would not have jeopardized the safe operation of the plant. As a result the licensee withdrew the potentially reportable ite The inspector observed the deflected bellows and portions of the activities to restore them to the correct configuration and reviewed the correspon-dence addressing this problem. The inspector concurs with the licensee's withdrawa (354/82-00-01) On July 17, 1981, the licensee reported a significant construction defi-ciency in accordance with the requirements of 10 CFR 50.55(e) involving Varglass tie wrap slippage and unraveling that could result in hindering safety related relay operation in GE supplied motor control centers. In a licensee letter dated 8/17/81, it was stated that a silicone sealer would be applied at the tie wrap knot and also between the knot and the cable to prevent unraveling and slippag The inspector's efforts to close out this item disclosed that a fix different from that described in the licensee's letter was in proces The new fix involved replacing the Varglass tie wraps with Tefzel tie wraps. The inspector requested the licensee send a letter to the NRC
--
noting the change in solution of the tie wrap problem. By letter dated _
5/21/82, the licensee informed the NRC of their revised plan This item remains open pending qualification of the Tefzel tie wrap and replacement of the Varglass tie wraps with Tefzel tie wrap . Reactor Vessel Internals - Observation of Work Activities and Review of Procedures During this inspection report period the shroud to shroud support weld was nearly completed. The post weld as-built condition of the shroud was satisfactory to GENE 80. Welding of the incore instrument housings to their stub tubes commenced. The weld processes used to accomplish this weld included initial root passes by GTAW and balance of passes by SMAW. Filler metal used was inconel. The inspector witnessed welding and inspection activities of the incore housing welding. Locating, bolting, and torquing of the core support plate also commenced during this report perio _ _ _ - _ _ _ _ - .
.
h
1 The inspector reviewed the following documents relative to welding of the incore instrument housings:
-- ASME Section IX, 1974 Edition through Winter of 1974 Addenda
-- GEI&SE WPS HC40090, Rev. 1
-- GEI&SE PQR ISE-PQ-401, Rev. 1
-- GEI&SE Mockup Procedure 15 MU-1, Rev. 3, Incore to Vessel Mockup Requirements
-- gel &SE SDDR #43
-- GENEB0 FDDR #KT1-114, Rev. O
,
i
'
-- GEI&SE Traveler HCI-14-T, Installation of the Incore Housings
-- GEI&SE JPCS's HCI-14-J-XXYY (XXYY corresponds to incore housing i position - there are 55 housings)
-- GEI&SE WPS HC5001W, Rev. 5
-- gel &SE PQR ISE-PQ-504
--
GEI&SE PQR ISE-PQ-418 f --
GENEB0 Dwg. 197R628, Rev. 12
-- GENEB0 Welding Specification 22A4202
.
' '
The work and inspection status of each of the 55 incore housings is coor-i dinated through a single traveler and 55 associated Joint Process Control l Sheets (JPCS's). The inspector noted that this system was being effectively implemented to maintain a current inspection status of all the incore housing welds. Review of the balance of the documentation disclosed the following two problems:
- _ - . _ . . . - -.. -- .. - - - - . .-- .-
(1) WPS HC40090, Rev. I was the weld procedure specification (WPS)
for the incore housing welds. This WPS referenced procedure qualification record (PQR) ISE-PQ-401. Review of this PQR in-dicated that it was not sufficient to qualify the WPS. The dis-crepancy involved GTAW maximum thickness qualified. The WPS stated the GTAW process could be used to deposit up to k" of weld metal but the PQR only qualified the WPS up to 1/8" based on ASME IX rule When the inspector pointed this discrepancy out to GEI&SE, they identified PQR ISE-PQ-418 which qualified the GTAW process to beyond 2" thickness. The inspector stated that this PQR should be referenced on the WPS to qualify the WPS. The appropriate revision was made to WPS HC4009D prior to the end of this report period. The inspector had no further questions on this issu (2) GENEB0 Weld Specification 22A4202 required a mockup weld for the incore housings. This requirement was specified to be a site mockup not a welder qualification mockup. However, in GEI&SE procedure 15MU-1, Rev. 3, Incore to Vessel Mockup Requirements, paragraph 4.6 required each welder to complete one incore housing weld joint and the weld to pass liquid penetrant testing at three different stages of weld completion. The inspector reviewed the qualification records for each welder who had welded on the incore housings and detennined that one of the three welders was not qualified in accordance with paragraph 4.6 of 15MU-1. In particular the liquid penetrant testing had not been performed on his incore housing mockup wel The inspector pointed this discrepancy out to GEI&SE and the li-censee. In ensuing discussions, it was agreed that the need for individual welder qualification for these welds was not required by 22A4202 nor was it dictated by conditions of limited accessibilit Consequently,15MU-1 was revised to delete the requirement for in-dividual welder qualification. The inspector had no further questions on this issue.
No items of noncompliance were identifie . . . _ . - . - - . - _ - . _- - - _ . - .
.
I
I Safety Related Components - Observation of Work and Work Activities During this inspection report period the first diesel generator (DG) arrived by barge. The unit was transported to the diesel generator building entrance and rigged from there into its cell on the 102' elevation. The inspector witnessed the various handling and rigging methods used to move the DG into its permanent plant location. The inspector also questioned involved crafts and supervision as to their knowledge of rigging techniques used. Additionally, the inspector inspected the DG for evidence of shipping or rigging damage and identified none. The rigging operation was accomplished in a professional manner with no major problem No items of noncompliance were identifie . Reactor Coolant Pressure Boundary Piping - Observation of Work and Work Activities
- The inspector observed welding activities associated with the field connection of recirculation loop B piping to the reactor pressure vessel (RPV) safe-end
, nozzle. This was the second piping connection welded to the RPV. The pipe material was stainless steel, therefore, a purge was require Purge dam material was installed in two locations to form the purge boundarie In particular the inspector witnessed portions of the following activities:
-- Fitup and tack of spool to recirc pipe,
-- Installation of alignment blocks to prevent distortion of the weld groove due to shrinkage,
-- Establishment of purge,
! -- Weldout of root by TIG proces Weldout of joint by SMAW process,
-- QC inspection of welding activities,
-- Control of weld shrinkage at joint between one end of the spool I
to recirc piping to effect fitup of other end of spool to RPV safe-end, and
-- Weldout of joint between spool and safe-end.
l l
l l
!
__
_ __ , _ _
_ _ , . _ _ _ _ _ _ - _ _ - . . _ _ - - - _ _ _ .
_ _ _ .-
.
.
The inspector also reviewed the QCIR's for each joint and the filler metal issue slip No items of noncompliance were identifie . Safety Related Piping and Supports - Observation of Work and Work Activities The inspector observed work in progress and completed work of safety related pipe welds. The particular attributes checked were proper fitup, use of qualified welders for tacking and welding, any obvious weld defects such as undercut, overgrind, excessive reinforcement, and arc strikes; existence of an approved QCIR adjacent to the joint being welded; sequential signoff of QCIR as work completed; and presence of QC personnel in the work area It was also verified that the requirements stated on the QCIR's such as type of filler material, weld procedure, and NDE were being adhered t The inspector also observed work in progress and completed work on safety related pipe supports. The particular attributes inspected included weld quality, attachment point to safety related steel or concrete structure, blocks installed in spring hangers, correct size of threaded rod, support spacing, completeness of hanger assembly including full thread engagement of nuts and use of proper nut locking arrangements, application of ASME III Subsection NF Code stamp, shear lugs present where required, interference problems, and location of hanger clamps.on pipe to ensure field and shop'
welds not obstructe No items of noncompliance were identifie . Qualification of Inspection Personnel NRC inspection reports 80-20, 81-02, and 81-09 discussed qualification of QC personnel. These reports expressed concern for the potential of diluting the overall capability of the QC department that could result from stretching the related experience requirements when hiring new QC personnel.. Since
- NRC Inspection Report 81-09 the Bechtel QC department has increased in size by approximately 25% and has experienced personnel turnover. Additionally, JRS and W-H started safety related activities that required quality control inspection. Based on augmentation and turnover in site QC personnel, the inspector performed a review of QC personnel qualification records for '
Bechtel and JRS QC inspector .
_
_
.
Prior to commencement of the QC personnel qualification review, the in-spector compared the requirements for QC personnel qualification contained in the Bechtel Construction Quality Control Manual, Rev. 2 with those im-posed by NRC Generic Letter 81-01. Generic Letter'81-01 imposed Revision 1 to USNRC Regulatory Guide 1.58 which endorsed, with some qualifiers, the 1978 revision to ANSI Standard N45.2.6, Qualification of Inspection, Ex-cmination, and Testing Personnel for Construction., This comparison in-dicated that the written Bechtel program was consistent with the latest NRC requirements. The inspector proceeded to review the training /qualifi-
, cation records for thirteen Bechtel QC personnel whose records had not previously
'
been reviewed by NRC inspectors. Individuals were selected at random from each of the major QC technical disciplines. -This review indicated that Bechtel is continuing its efforts to hire and train experienced personne The combination of a substantial amount of previously related experience and intensive onsite training in both jobsite practices and technical disci-plines, demonstrates that the Bechtel QC qualification program meets regula-tory requirement A similar review of JRS was conducted. It was evident from this review that JRS QC personnel were also qualified in accordance with regulatory require-ment No items of noncompliance were identifie . Service Water Intake Structure (SWIS) - Observation of Work and Work Activities and Review of Quality Records The inspector performed the .following activities during an inspection of JRS in process and completed construction work:
(1) Observation of Basemat Preparation The inspector observed these activities within the dewatered cofferdam and evaluated against criteria established in the PSAR, engineering specifications, applicable drawings, and. industry codes and standards:
-- control of water leakage between sheet piling
-- high pressure water-jet removal of laitence at top surface of tremie concrete .
-- concrete chipping of tremie mounds
-- level course concrete application
-- ,
. , < .
\.s .
-- reinforcing steel i'nstallation rr.:
-- fonnwork installation _
- s
-- quality controlfinspection and documentation of above y ,.
-- subcontract surveillance by Bechtel of above (2) Quality Control Record, Review of Tremie Ccncrete' and Preparations
'
-
for Basemat g The inspector reviewed ,JRS's QC, records pertaining to prepara-tions, placement and post-placen,ent activities of the tremie concrete / cofferdam sea) and the, foundation shear key incorporated in the tremie. .The follcWing QC records were reviewed and evalu-ated for conformance to rejuirements contained in JRS QA manual and QC inspection procedures:.
,
,%
- -- final soundings and approval of contour for shear key ,
S
-- concrete b'atch plant onaterials and mix qualificatien batching, m,ixing, delivery, testing and placing c
-- surveillance of subc3ntract batch plant operations t
-- documentation [ot/ coberete volume, placement method, and concrete testing (durfng five days of c'ontinuous s operation) 3
'
- J' 4 i
' . , ( '
'
--
J s post-placement core drilling through the tremie atfive locations preservation of cores ,,
.
x .
--
clean-upandhighspotremovaloftremietopsurface} (".
x ,.
'
-- surveys for heave / settlement' of SWIS foundation
.
,
-- documer.tationbyh.kS ofsand disposition ef NCR's by Bechtel *
on trcitie concretA I " t
- '*
--
!: , .e , ' + l[
batch plant records / truck tickets of concNete mix' ingredient weights from each of two plants jN ;
A ,.
- 4 h =
. l"*
-
i s9ll * ,
r i f
c
i
,
l'
~
!\_
f N
-
Ab v
%
{
_
. .
-- laboratory concrete inspection data sheets
-- tremie concrete test cylinder 28 day compression tests
-- Bechtel surveillance of JRS's implementation of in-spection program and JRS's monitoring of their sub-contractor's QA/QC programs The inspector observed above records to be legible, readily re-trievable, properly reviewed and approved. Where test equipment was used, the instrument number and calibration status was identified and the ASNT-TC-1A level of technician give (3) Reinforcing Steel for Basemat- Record Review The inspector observed in his review of QC records that three shipments of reinforcing steel from Bethlehem Steel received by JRS at the site were properly identified and accompanied by Bethlehem Steel's certified reports and confirmatory tests of conformance to requirements of ASTM A-615-75 However, Bechtel Specification C-200,Section II requires a Bechtel supplier quality representative (SQR) at the supplier plant to witness and verify shipments for release. Reinforcing steel received by JRS at site on April 27, 28 and May 20 were not accompanied by a release and Bechtel and JRS's QC documentation records.were lacking in evidence that mill test reports were reviewed by Bechtel's SQR prior to shipment to the jobsite. Upon questioning this apparent discrepancy, the NRC inspector was shown a waiver granted JRS by Bechtel dated April 15, which permitted shipping the above reinforcing steel without a signed release. However, this waiver was not translated into a formal reruirement to review the mill test reports at some other tim Prior to the end of this inspection report period, SDDR #23 was written to fonnally identify the waiver and to require onsite inspection of the mill test report The inspector had no further questions based on the following rationale:
-- Prior to JRS's purchase from Bethlehem Steel, Bechtel had a SQR at Steelton for their own purchases. A portion of his responsibility was to witness tests, verify mill test reports, and sign releases. Historically, there have been few problem _ _ _ _ _ _ . - - _ _ _ _ _ _ _ _ _ _ - _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
. .
-- JRS fullfilled the requirement of their approved QA Manual which pennitted the option of source surveillance at supplier or audit of supplier QA program. JRS performed the audit and approved Bethlehem Reinforcing Steel QA program on April 19, 198 No items of noncompliance were identifie . Upper Biological Shield High Density Concrete Grout Placement - Review of Records The NRC inspector perfonned a detailed review of quality documentation and evaluated QC records generated prior to, during, and after placement of 170 cubic yards of high density grout by pressure pumping into the upper biological shield (bioshield).
Because of the c itical aspects of this placement, in particular the im-portance of complete fill for radiation protection, FCR-C-6912 was generated to implement special requirements for placing, forming, finishing, curing, and testing the high density concrete. This review included interviews with QC inspectors, construction and project engineers and laboratory technician The following QC records were included in the inspectofs review and evaluation of conformance to industry codes and standards, engineering specifications /
drawings, and FCR-C-6912:
-- Qualification of grout ingredients, including mix proportions and laboratory tests on trial batches
-- Preplanning and preparation per Specific Work Plan / Procedure SWP/P #C-5959: drawing references, equipment / manpower, pumping scheme, controls, and data sheets establishing responsibilities
-- QC sign-off on prerequisites, in-process inspection activities, l
curing, final inspection activities and review of supplementary records on curing, batch plant / truck delivery tickets and test laboratory reports l
-- The NRC inspector verified the above supplementary records to con-
'
firm adequacy of QC sign-of No items of noncompliance were identified.
!
!
l
!
I l
l
!
. - . - _ - - ._ .. .
!
1 1 Heave / Settlement Monitoring Program - Power Block Buildings - Review of Annual Reports
.
The NRC inspector reviewed annual heave / settlement measurement reports.
"
(Previous NRC Inspection Reports discussing the monitoring program are 80-01 for 1978 and '79 and 80-13 for the period up to March 1980.)
Update plots of observed load / settlements for five power block basemats up to February 1982 were reviewed. Comparison plots for the differential settlement between adjacent power block basemats have been evaluated by Bechtel and found acceptable. A review of the plots by the NRC inspector confirmed Bechtel evaluation that settlements are leveling of Bechtel concludes present settlements are within the limits of desig The inspector had no further question . The inspectors met with licensee and contractor personnel during this inspection report period at which time they summarized the scope and
- findings of their inspection activities.
,
i l
i I
. - . .. - - - -
, . -- - . -,