IR 05000348/1978023

From kanterella
Jump to navigation Jump to search
Forwards IE Inspec Rept 50-348/78-23 on 780918-20 & Notice of Violation
ML20197C029
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 10/26/1978
From: Kenna W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Barton A
ALABAMA POWER CO.
Shared Package
ML20197C034 List:
References
NUDOCS 7811140257
Download: ML20197C029 (2)


Text

._ _ _ - _ _ _ _ _ _ __

M Mco . - - . UMTED STATES ' *

g / '

.

, jf log NUCLEAR REGULATORY COMMISSION gj M

,

&

.y )x

.-

.c g

. E nEGloN n 101 M ARIETTA STH E ET, c#

, y/d py .# ATLANTA, GEORGI A 30303 g..v ,/ ...

In Reply Refer To:

RII:JMF OC~T 2 61978 50-348/78-23 ,hg

/

Alabama Power Company ATTN: Mr. A. R. Barton Executive Vice President Post Office Box 2641 Birmingham, Alabama 35291 Gentlemen:

This refers to the inspection conducted by J. M. Fuchko of this of fice on September 18-20, 1978, of activities authorized by NRC Operating License No. NPF-2 at Farley and to the discussion of our findings held with W. G. Hairston at the conctiJsion of the inspectio The area examined during this inspection was your program for safe-guarding special nuclear material under the applicable provisions of Title 10, Code of Federal Regulations, Part 73, " Physical Protection i

'

of Plants and Materials." Within this area, t he inspection consisted of selective exaiinations cf procedures and representative records, interviews with personnel, and observations by t he inspector During the inspection, it was found that certain activities under your license appear to be in noncompliance with NRC requirement These items and references to pertinent requirements are listed in the Notice of Violation enclosed herewith as Appendix A. This notice is sent to you pursuant to the provisions of Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations. Section 2.201 requires you to submit to this office, within 20 days of your receipt of this notice, a written statement or explanation in reply including:

(1) corrective steps which have been taken by you and the results achieved; (2) corrective steps which will be taken to avoid further noncompliance; and (3) the date when full comptiance will be achieve If Appendix A contains any information that you (or your contractc,r)

believe to be proprietary, it is necessary that you make a written application within 20 days to this office to withhold such information fron public disclosur Any such application must include a full statement of the reasons on the basis of which it is claimed that the information is proprietary, and should be prepared so that proprietary information identified in the application is contained in a separate part of the documen If we do not hear from you in this regard within the specified period, Appendix A will be placed in the Public Document Roo 'A$7 .-

1 -L,

.

. 4 1. ,

.

'

. . s .. ' ' . s ! ,i t. L , . . . ,  :...

j , e . _ _ _ _ _ _ _ _ _ _ _ _ _

. .

, ,--- - ~ fm :i gg; L, .12 ~ 3 ' ," ', '.17:0ll

.

.

Alabama Power Company -2-DCT 2 61978 In accordance with Sec+ ion 2.790(d) of the NRC's " Rules of Practice,"

Part 2, Title 10, code of Federal Regulations, details of activities involving safeguards and security measures are exempt from public disclosure; therefore, the Inspection Report enclosed with this letter with the exception of the report cover page, which is an inspection summary, will NOT be placed in the Public Docurnent Roo Should you have any questions concerning this letter, we will be glad to discuss them with yc Sinc .rel.",

  • '

a

{I%'/

\

%.AA W. B. Ke na, Chief Safeguar s Braneh Enclosures:

Apoerdix A, Notice of Violation C'!at Exempt)

Inspection Report No. 50-348/78-23 (Exempt From Disclosure)

Inspection Summary (Not Exempt)

cc: Mr. W. G. llairston Plant Manager Drawer 470 Ashford, Atacama 36312

.

S

'.m, .a '*M f , ',' N " l l t .,

' , , , . h ., . . - I

.

_ _ _ _ _ _ _ _ - _ _ -