Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-341/97-05 Issued on 970619.Corrective Actions May Be Examined During Future Inspections
ML20211J847
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 10/02/1997
From: Grobe J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Gipson D
DETROIT EDISON CO.
References
50-341-97-05, 50-341-97-5, NUDOCS 9710080313
Download: ML20211J847 (2)


Text

.

, ,

Octoinr 2,1997 Mr. D. Senior Vice President Nuclear Generation Fermi 2 Nuclear Power Plant The Detroit Edison Company 6400 North Dixie Highway Newport, Mi 48166 SUBJECT: NOTICE OF VIOLATION (NRC INSPECTION REPORT 50 341/97005(DRS)

Dear Mr. Gipson:

This will acknowledge receipt of your supplemental letter dated September 3,1997, in response to our letter dated June 19,1997, transmitting a Notice of Violation associated with testing of the diesel driven fire pump, maintenance of fuse disconnect switches, and an engineering evaluation to determine the suitability of a turbo charger blower cover gasket for the emergency diesel generator. We have reviewed your corrective actions and have no further

,

questions at this time. These corrective actions may be examined during future inspections.