SUBJECT:

NORTH ANNA POWER STATION, UNITS 1 AND 2 - NRC INSPECTION REPORT 05000338/2025010 AND 05000339/2025010

Dear Eric Carr:

On August 12, 2025, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at North Anna Power Station, Units 1 and 2 and discussed the results of this inspection with Jim Jenkins and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Marcus A. Riley, Chief Engineering Branch 1 Division of Operating Reactor Safety Docket Nos. 05000338 and 05000339 License Nos. NPF-4 and NPF-7

Enclosure:

As stated

Inspection Report

Docket Numbers:

05000338 and 05000339

License Numbers:

NPF-4 and NPF-7

Report Numbers:

05000338/2025010 and 05000339/2025010

Enterprise Identifier:

I-2025-010-0033

Licensee:

Dominion Energy Corporation

Facility:

North Anna Power Station, Units 1 and 2

Location:

Mineral, VA

Inspection Dates:

July 14, 2025 to August 12, 2025

Inspectors:

J. Alamudun, Reactor Inspector

P. Braxton, Reactor Inspector

D. Burgess, Reactor Inspector

C. Franklin, Reactor Inspector

L. Jones, Senior Reactor Inspector

J. Lizardi-Barreto, Reactor Inspector

Approved By:

Marcus A. Riley, Chief

Engineering Branch 1

Division of Operating Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a NRC inspection at North Anna Power Station, Units 1 and 2, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY

===71111.21M - Comprehensive Engineering Team Inspection The inspectors evaluated the following components and listed applicable attributes, permanent modifications, and operating experience:

Structures, Systems, and Components (SSCs) (IP section 03.01)===

For each component sample, the inspectors reviewed the licensing and design bases including:

(1) the Updated Final Safety Analysis Report (UFSAR);
(2) the Technical Specifications (TS); and
(3) the Technical Requirements Manual (TRM). The inspectors reviewed a sample of operating procedures (including normal, abnormal, and emergency procedures) and overall system/component health (including condition reports and operability evaluations, if any). The inspectors performed visual inspections of the accessible components to identify potential hazards and/or signs of degradation. Additional component specific design attributes reviewed by the inspectors are listed below.
(1) Service Water Pump House Ventilation & Damper
  • Environmental Qualification
  • Design calculations and considerations:

o Design system flowrates o

Pumphouse ventilation heat loads o

Fan motor minimum voltage o

Fan motor cable ampacity o

Control logic o

Control circuit voltage o

Heat transfer capacity

  • Test/inspection procedures, acceptance criteria, and recent results:

o Fan motor inspection and replacement o

Damper inspection and replacement

(2) U2 Battery Chargers
  • Calculations verifying system design requirements
  • Design Basis documents/Design requirements
  • Conformance with manufacturer instruction for installation, maintenance, and operation
(3) U1 1B Station Service Transformer
  • Reviewed system design documents for design prosperity
  • Conformance with manufacturer
  • Reviewed system condition reports
(4) Station Blackout Diesel (Alternate AC Diesel Generator)

1. Design Calculations and considerations:

a.

SBO Room heat load calculations b.

Battery system design c.

Fuel oil day tank flowrate d.

Pipe support qualification

2. Test/inspection procedures, acceptance criteria, and recent results:

a.

TRM Surveillances

3. Condition reports

(5) U1 1-AC-6 Switchgear Air Handling Unit
  • Design Basis documents/ Design requirements
  • Design calculations and considerations o

Heat load calculations for chiller performance testing o

Cooling coils for air handling units

  • Test/inspection procedures, acceptance criteria, and recent results o

Inspection and replacement of fan motor and sheaves o

Inspection of motor bearing, coil and damper filter

Modifications (IP section 03.02) (4 Samples)

(1) NA-23-00038-U2 SST 2-EP-SST-1B 4160V Power Cable Replacement
(2) NA-25-00015 - U2 Charging Pump Suction MOV (2-CHMOV-2270B) Control Circuits Modification
(3) NA-22-00016 - U2 Low Head Safety Injection Pump Motor (2-SI-P-1A-MOTOR)

Replacement

(4) NA-23-0007-01 & NA-23-00008-02 - Unit 1 and 2 Reactor Head Seismic Restraint Clevis Pin Replacement 10 CFR 50.59 Evaluations/Screening (IP section 03.03) (6 Samples)
(1) NA-22-00075 - Safety Injection Gate Valve MOV Motor Replacements (1-SI-MOV-1869A/B & 2-SI-MOV-2869B)
(2) NA-21-00074 - Upgrade of Service Water Temperature Indicator Controllers 1-SW-TIC-102A,B,C
(3) NA-21-00066-02 - 1st Point Feedwater Heaters Level Controls Digital Upgrade-SLR
(4) NA-18-00092 - 1H Emergency Diesel Generator Exhaust Gasket and Bolting Modifications
(5) NA-23-00007 - Unit 1 Reactor Head Seismic Restraint Clevis Pin Replacement (6)02-SW-MEJ-23F-PIPE - Replace A Spray MEJ (Mechanical Expansion Joint) (ETE-NA-2021-0033 and WOs 59103104100 & 59203301006)

Operating Experience Samples (IP section 03.04) (2 Samples)

(1) Information Notice 2019-01: Inadequate Evaluation of Temporary Alterations
(2) Information Notice 2009-10: Transformer Failures-Recent Operating Experience

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On August 12, 2025, the inspectors presented the NRC inspection results to Jim Jenkins and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

11715-7.1-V-6

Evaluation of the SWPH Ventilation System with Additional

Heat Loads

CE-1064

Pipe Support Qualification - SBO Diesel

CORRES-CEM-

SEISMIC-148

Seismic Response Spectra for the Reactor Head Seismic

Restraint Clevis Pin Replacement North Anna Units 1 & 2

EE-0008

North Anna Voltage Profiles

EE-0511

Station Blackout 125VDC Battery System Design

EE-0687

NAPS ETAP Impedance Diagram

ME-0275

Heat Load Calculation for Chiller Performance Testing

ME-0323

SBO Diesel Generator Room Heat Load Calculation

ME-0410

SBO Diesel Day Tank Level Vs. Useable Fuel

ME-0529

SBO Diesel Fuel Oil Day Tank Flowrate Calculation

ME-0899

Loss of Forced Ventilation in the EDG Rooms and SBO

Building

ME-12139

Compensatory Measures Required for Loss of Service

Water Pump House Ventilation

ME-12207

Weak Link Analysis for the Charging Pump Suction MOVs at

North Anna Power Station

ME-3006

JOG Calculations of Required Thrust Settings and Margin

for the Charging Pump Suction MOVs

NA-CALC-PRO-

11715-7-V-22

Cooling Coils for Air Handling Units

NA-CALC-ZZZ-

CE-0195

Pipe Stress Analysis for Service Water Piping of the Valve

House

Calculations

NA-CALC-ZZZ-

CE-0196

Pipe Stress Analysis for Service Water Piping of the Valve

House

266021,

2800741,

2980257,

Corrective Action

Documents

OD CA 11207533

(CR 1202700)

Prompt Operability Determination

71111.21M

Corrective Action

CR 1297334

TRM 3.7.7 Bases Not Updated to Indicate Annual Surveys

7/30/2025

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Documents

Resulting from

Inspection

11715-ESK-6LE

Elementary Diagram 480V Circuits Heating and Ventilating

11715-FB-24D

Ventilation & Air Conditioning Service Building SH-4 North

Anna Power Station - Unit 1

11715-FB-44E

Flow Diagram Ventilation System

11715-FE-1A

Main One Line Diagram North Anna Power Station - Unite 1

& 2

11715-FE-21B

A.C. Elementary Diagram Station Service Transformer North

Anna Power Station - Unit 1

11715/12050-

5.14-20B

North Anna 1 & 2 Virginia Electric Power Co - CRDM

Seismic Support Tie Rod Assembly

2050-ESK-6EB

Elementary diagram 480V Circuits Motor Operated Valves

Sheet 50

Drawings

2050ESK-6EB-

Elementary diagram 480V Circuits Motor Operated Valves

Sheet 50-1

DC NA-18-00092

1H - Emergency Diesel Generator Exhaust Gasket and

Bolting Modifications

DC NA-21-00066

1st and 2nd Point Feedwater Heaters Level Controls Digital

Upgrade

DC NA-22-00016

2-SI-P-1A LHSI Pump Motor Replacement

DC NA-23-00007

Unit 1 Reactor Head Seismic Restraint Clevis Pin

Replacement

DC NA-23-00007

Unit 1 Reactor Head Seismic Restraint Clevis Pin

Replacement

DC NA-23-00008

Unit 2 Reactor Head Seismic Restraint Clevis Pin

Replacement

DC NA-25-00015

U2 Charging Pump Suction MOV (2-CH-MOV-2270B)

Control Circuit Modification

Engineering

Changes

NA-21-00074

Upgrade of Service Water Temperature Indicator Controllers

1-SW-TIC-102A,B,C

Engineering

Evaluations

50.59 Evaluation

for NA-21-00066

50.59 Evaluation for 1st and 2nd Point Feedwater Heaters

Level Controls Digital Upgrade

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

NA-22-00075

Safety Injection Gate Valve MOV Motor Replacements (1-

SI-MOV-1869A/B & 2-SI-MOV-2869B)

NA-23-00038

U2 Station Service Transformer B 4160V Power Cable

Replacement

NA-ETE-000-

ETE-NA-2020-

0015

Reduction in Site Settlement Survey Frequency

NA-ETE-000-

ETE-NA-2021-

0033

Response to Service Water Valve House Monument

Settlement Survey Issues

NA-REQUEST-

000-LBDCR-

TRCR-198

License Basis Document Change Request

WNA-QR-00107-

VRA

Dominion North Anna Unit 1 & 2 Feedwater Heater Level

Control EMC Compliance Evaluation Report

04-624 (DNV-LC

LC036678)

Summary of Dam Safety Inspection for the Service Water

Reservoir Dam at the North Anna Power Station

09/08/2004

ALAB-578

Decision ALAB-578 Advising that Settlement of SVC Water

Pumphouse Does Not Pose Threat to Health & Safety

2/11/1980

CT-SPEC-000-

676258

Motor Operated Valves Specification

DNES-AA-MOV-

1001

Motor-Operated Valve Diagnostic Test Preparation and

Evaluation

NAS-0264

Specification for Ventilation and Air Conditioning Systems

05/31/1979

Miscellaneous

NAS-307

Specification for Propeller Fans

06/22/1977

1-PT-110

Service Water Reservoir Spray Piping Settlement Monitoring

01/25/1978

NDE Reports

NA-PROC59-000-

0-PT-115

Survey of Settlement Monitoring Points

0-PT-82.12

Quarterly Test of 0-AAC-DC-OM

0-WP-M-SW001

SW Reservoir Spray Array Piping and Mechanical

Expansion Joint Replacement

1-MOP-21.39

Service Water Pump House Exhaust Fan 1-HV-F-49A/B

Procedures

CM-AA-400

CFR 50.59 and 10 CFR 72.48 - Changes, Tests, and

Experiments

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

ER-AA-NDE-VT-

603

VT-# Visual Examination Procedure

59102266150,

203454236,

203305312

59103104100

"B" SW Header MEJ Inspections

09/22/2021

203301006

Inspect, repair, or replace "A" SW spray MEJ

07/25/2025

203307959

Replace Fan and Motor Sheaves

203402997

Seismic Restraint Clevis Pin Replacement DC NA-23-00007

07/02/2024

203405412

Grease Motor Bearings

203454829

Control Room Filter/Damper Inspection

203454829

Work Orders

WO 203424348

2-FW-E-1A FEEDWATER HEATER INSTRUMENT

CALIBRATION

4/1/2025