Text
8 RECy
+
Cy 0O IVl (
o~
4p UNITED STATES NUCLEAR REGULATORY COMMISSION
REGION II
101 MARIETTASTREET, N.W.
ATLANTA,GEORGIA 30323 Report Nos'.:
50-335/85-33 and 50-389/85-33 Licensee:
Florida Power and Light Company 9250 West Flagler Street Miami, FL 33102 Docket Nos.:
50-335 and 50-389 Facility Name:
St. Lucie I and
Inspection Conducted.
e ember 16-20, 985 Inspect P.
M.
dden Approved by T.
E. Conlon, Section C ief Engineering Branch Division of Reactor Safety License Nos.:
DPR-67 and NPF-16 Dat Signed-rs
.6 Date Soigne
~
~
~
~
~
SUMMARY Scope:
This routine, unannounced inspection involved 36 inspector-hours on site in the areas of Fire Protection/prevention and followup on previously identified inspection items.
Results:
No violations or deviations were identified.
PDP ADOCK OSOoO3
.
. 8
~ ~
~ 1 N
~
REPORT DETAILS Persons Contacted Licensee Employees
- R. V. Crlenjak
- H. E. Bibb
- Attended exit interview
- K. N. Harris, Vice President
- D. A. Sager, Plant Manager
- J. H. Barrow, Operations Superintendent
- T. A. Dillard, Maintenance Superintendent
- R. 0. Parks, Backfit Manager
- R. Sipos, Services Manager
- J. Barrow, Site Fire Protection Supervisor
- R. McDaniel, Site Fire Protection Coordinator
- R. T. Behre, Site Fire Inspector
- L. W. Pearce, Plant Operations
- J. Scarola, Electrical Maintenance
- C. F. Leppla, Plant Instrumentation and Controls
- J. Krumins, Power Plant Engineering
- E. J. Wunderlich, Reactor Engineering
- N. Roos, Quality Control
- B. M. Parks, Quality Assurance
- C. A. Pell, Technical Staff
\\
Other licensee employees contacted included construction craftsmen, engineers, technicians, operators, mechanics, security force members",
and office personnel.
NRC Resident Inspectors Exit Interview
'r The inspection scope and findings were summarized on December 20, 1985, with those persons indicated in paragraph I above.
The inspector described the areas inspected and discussed in detail the inspection findings.
~
iNo dissenting comments were received from the licensee.
a.
Inspector Followup Item (335, 389/85-33-01),
Failure to provi'de sufficient guidance regarding the maximum quantities of combustible materials and flammable and combustible liquids allowed in safe shutdown related areas
- paragraph b.
Inspector Followup Item (335, 389/85-33-02),
The overall site fire protection implementation responsibilities and organization are not properly identified in AP 1800022 - paragraph 5.a.
c.
Inspector Followup Item (335, 389/85-33-03),
Eighteen Month fire pump surveillance not being conducted following the guidance of NFPA-20-paragraph 5.b.
The licensee did not identify as proprietary any of the materials provided to or reviewed by the inspectors during this inspection.
3.
Licensee, Action on Previous Enforcement Matters (Closed)
Unresolved Item (335/85-06-06),
Failure to provide fire proofing material to structural steel supporting protected conduits in unsprinkled plant area.
By letters L-85-71 and L-85-72, dated February 21, 1985, the licensee has requested an exemption on Unit 1 for Fire Areas A, B, and C
from Section III.G.2.a of Appendix R.
The licensee requested this exemption on the basis that fire proofing material was not going to be applied to the structural steel supporting those conduits which are required to be protected in order to achieve Appendix R compliance.
However, during the last Unit 1 outage the licensee applied fire proofing material to 'the structural steel supporting those conduits protected by three-hour, fire rated enclosures in fire areas A, B, and C.
Therefore, this item is closed.
4.
Unresolved Items Unresolved items were not identified during the inspection.
5.
Fire Protection Prevention Program a
~
Fire Prevention/Administrative Control Procedures The inspector reviewed the following Fire Prevention/Administrative Procedures:
Procedure No.
Title AP 0005729, Rev. 4, 5-31-84 NFPP, Rev. 2, 1-85 Fire Protection Training, gualification and Requalification Nuclear Fire Protection Program-St. Lucie Plant Unit No.
AP 0010434, Rev.
16, 1-18-85 AP 1800022, Rev. 6, 4-11-84 Maintenance Department Safety
'uidelines Fire Protection Program
N, I'
I'
N'(
N
'I tl
~
N N
It N t
Based on this review, it appears that the above procedures, except for AP 0010434 and AP 1800022, meet the NRC guidelines of the document entitled
"Nuclear Plant Fire Protection Functional Responsibilities, Administrative Controls, and guality Assurance" dated June 1977 and the licensee's commitments in the letter to the NRC dated March 31, 1977 AP 0010434, Section 8.2, Control of Combustibles and Section 8.6, Handling of Combustible and Flammable Liquids, appear to adequately address the control of transient combustibles and the handling of combustible and flammable liquids in safe shutdown related ar eas, of the plant.
However, this procedure does not set limits with regards~to the maximum quantity of combustible materials which can be stored
~'~in a
plant area important to safe shutdown.
In addition, this procedure does not establish the maximum quantity of flammable or combustible liquids allowed in those plant areas which contain safe shutdown systems during the various modes of power operations.
This i'is identified as Inspector Followup Item (335, 389/85-33-01),
Failure to provide sufficient guidance regarding the maximum quantities
) of combustible materials and flammable and combustible liquids allowed in safe shutdown related plant areas.
Procedure AP 1800022 presently does not address the current s,ite management organization or the responsibilities of the site Vice President, Services Manager, Fire Protection Coordinator and the Fire Protection Inspector with regard to the implementation of the site fire protection program.
This is identified as Inspector Followup iItem (335, 389/85-33-02),
The overall site fire protection program implementation responsibilities and organization are not properly identified in AP 1800022.
Fire Protection Surveillance Procedures The inspector reviewed the following Fire Protection System Surveil-lance Procedures:
Procedure No.
Titie OP 1800050, Rev.
OP 1800053, Rev.
MP 1-1800056, Rev.
MP 1-M-0018, Rev.
Monthly - Fire Valves and Fire Pump Surveillance Annual, 18 Month, and Three Year Test - Fire Protection System Six-Month Surveillance of Diesel Generator Fire Protection System Mechanical Maintenance Safety Related Preventive Maintenance Program
1I I
II II
MP 1-N-0018 -PM-258 Fire Hose House Surveillance - Monthly i
MP 1-N-0018 -PN-260 MP 1-M-0018 -PM-261 MP 1-M-0018 -PN-262 MP 1-N-0018 -PM-276 General Plant Hose Stations Surveillance - Monthly Fire Hose Stations Turbine Building and Reactor Auxiliary Building Surveillance - Monthly Fire Hose Stations Turbine Building and, Reactor Auxiliary Building Surveillance - 18 Months The above surveillance procedures were reviewed to determine if the various test outlines and inspection instructions adequately implement the surveillance requirements of the plant's Fire Protection Technical Specifications.
In addition, these procedures were reviewed
', to determine if the inspection and test instructions followed General Industry Fire Protection Practices, NRC Fire Protection Program Guidelines and the Guidelines of the National Fire Protection Association (NFPA) Fire Codes.
Based on this review, it appear's that the above procedures are satisfactory except for Section 8.3 of Procedure OP 1800053.
Section 8.3 of OP 1800053 specifies the requirements of the 18 month fire protection system functional fire pump test; however, this test does not follow the testing guidance provided in NFPA Standard-20, Installation of Centrifugal Fire Pumps.
The present acceptance criteria only records the 1005 flow rate capacity of the pump and the discharge pressure and does not denote the motor performance characteristics.
In addition, the 18 month fire pump test does not test peak load (1504 capacity)
conditions.
Therefore, the test procedure does not utilize the NFPA pump test data (discharge fl'ow and pressure, motor speed, etc.) for comparison to the established
'pump acceptance curve.
Thus, the true performance of the pump is,not specifically determined by the subject test procedure.
The licensee recognizes the inspector's concerns and committed to revise the procedure appropriately.
This is identified as Inspector Followup Item (335, 389/85-33-03),
Eighteen Nonth fire pump surveillance not being conducted following the guidance of NFPA-20, and wil,l be reviewed during a subsequent NRC inspection.
In addition, the inspector reviewed the following proposed fire protection surveillance procedures:
NP 1-M-0018 -PM-218 Fire Damper Surveillance - 18 Months MP 1-M-0018 -PM-271 Fire Door Surveillance - Semi-Annual Cable Spreading Room Halon System Monthly Surveillance MP 1-M-0018 -PN-277 Cable Spreading Room Halon System Semi-Annual Surveillance
S t
I t,
1
~
(
The above procedures outline the surveillance test requirements associated with Unit 1 Appendix R fire protection modifications.
The surveillance requirements associated with these procedures will be fully implemented on Unit 1 upon completion of the current outage and startup of the unit.
Based on a limited review, these procedures appear to 4e satisfactory with regard to meeting the licensee's proposed fire protection Technical Specification changes and NRC fire protection guidelines except for PM-277.
The inspector identified that additional guidance is needed with regard to voltage testing of the circuits associated with the fire damper electro-thermal-links.'he licensee indicated that they would incorporate the inspector's concern into the surveillance procedure.
Fire Protection System Surveillance Inspections and Tests The inspector reviewed the following Unit 1 surveillance inspection and test records for the dates indicated:
Surveillance Ins ections OP 1800050, Fire Valves and Fire Pump Test (Monthly)
January 2,
1985 through December 4,
1985 MP 1-M-0018, Mechanical Maintenance Safety Related Preventative Naintenance Program-PN-258 Fire Hose House Surveillance (Monthly)
July 4, 1985 through December 16, 1985-PM-260 General Plant Fire Hose Stations (Monthly)
July 4, 1985 through December 4,
1985-PM-261 Tec.
Spec.
Fire Hose Stations (Monthly)
August 5, 1985 through December 4,
1985-PN-262 Tech.
Spec.
Fire Hose Stations (18 Months)
December 19, 1981, June 3, 1983 and December 7, 1984 OP 1800053, Fire Protection System Fire Pump Test (18 Months)
March 15, 1982, August 8, 1982, March 9, 1984, June 6,, 1984 and December 12, 1985 OP 1800053, Fire Protection system Flush (Annual)
February 9, 1983, February 24, 1984 and March 6, 1985
r
t W
IU
The surveillance test record data and testing frequency associated with the above fire protection system surveillance tests/inspections were found to be satisfactory with regard to meeting the requirementsl of the plant's Fire Protection Technical Specifications.
',1 d.
Fire Protection Audit The most recent audit reports of the St. Lucie Fire Protection Program were reviewed.
These audits were:
QA0-84-301, Fire Protection and Loss Prevention Audit, January 16, 1984 through March 19, 1984 QA0-85-38, QA Dept. Audit of Fire Protection and Loss Prevention,'arch 21, 1985 JIOKOF5.CY, Factory Mutual Fire Protection Tri-Annual Audit, June 1984 These audits identified several fire protection program discrepancies and unresolved items, and recommended several program improvements.
The licensee has either implemented the corrective actions associated with these audit findings or a scheduled date for completion of the corrective actions had been established.
The licensee appears
~to be taking the appropriate correction actions on these audit findings.
e.
Fire Brigade (1)
Organization The fire brigade is composed of approximately 55 personnel',! from the Operations staff.
The brigade leader is normally the Watch Engineer and the remaining fire brigade is composed of Operators.
The inspector reviewed the
"On Shift Duty Roster" for the follow-ing dates and verified that sufficient qualified fire brigade personnel were on duty to meet the provisions of Technical Specification 6.2.2:
December 9,
1985 December 10, 1985 December 11, 1985 In addition, the inspector verified that sufficient personnel were assigned to each shift to meet the minimum operating and fire brigade staff requirements of the Technical Specifications.
Therefore it appears, based on the review of the duty rosters associated with the above dates, that there was sufficie'nt manpower on duty to meet both the operational and the fire brigade requirements of the plant's Technical Specification C A
g, g
P P
Training The inspector reviewed the training and drill records for'two brigade leaders and four brigade members for 1985.
The records reviewed indicated that each of these leaders and members~
had received an annual medical review, attended the required tr'aining and participated in the required number of drills.
The inspector also verified that a fire brigade drill had been conducted each quarter of 1985 for each shift.
The fire br~igade training records which were inspected were found satisfactory.
Fire Brigade Equipment The inspector performed an inspection of the Fire Brigade Equip-ment, consisting of fire hose, nozzles, tools, and miscellaneous equipment which is stored at the fire brigade equipment response locations located in the yard fire house and the turbine building on 19.5 elevation.
A total of 14 sets of turnout gear (coats, boots, helmets, ~etc.)
re stored and seven sets of self-contained breathing apparatus a
at the above fire brigade equipment response locations.
t, t
Based on this inspection, the designated fire brigade equipment stored at the fire brigade equipment response locations appeared to be properly maintained and stored in a ready condition.
Fire Brigade Drill During this inspection, the inspector witnessed an unannounced fire brigade drill.
The drill fire scenario was a fire in the intake cooling water pump house.
The drill fire condition was caused by a
pump motor lube oil leak.
Seven fire brigade members responded to the pending fire emergency.
The brigade assembled outside the intake structure in full protective fire fighting turnout clothing and self contained breathing apparatus.
An initial size-up of the fire condition was made by the fire brigade leader and one lk inch fire attack hose line with foam capabilities was advanced into the pump room and two additional lk inch fire hose lines were positioned by th'e fire brigade to protect exposed equipment.
The fire attack hose'ine was placed in service on the fire and the fire was placed under control by the fire brigade in 17 minutes.
In addition, the fire brigade initiated fire victim search and rescue, smoke control, and water control operations.
The fire brigade utilized proper manual fire fighting methods and reacted to the fire drill scenario in an effective and efficient manne, It I'
n t"
(
N
f.
Plant Tour A plant tour was made by the inspector.
During the plant tour the following Unit
safe shutdown related plant areas and their related fire protection features were inspected:
-0.50 ft. Elevation, Reactor Auxiliary Building 19.5 ft. Elevation, Reactor Auxiliary Building
- Cable Spreading Room
- Switchgear Room "A" Train
- Switchgear Room "B" Train
- Battery Room "A" Train
- Battery Room "B" Train Diesel Generator Building The inspector visually inspected the fire/smoke detection capabilities, the manual fire fighting equipment (i.e., portable extinguishers, hose stations, etc.)
and the fire barrier walls associated with the above plant areas.
In addition, the inspector visually inspected the Halon protection associated with cable spreading room and the sprinkler system in the diesel generator rooms.
Based on the visual inspection, it appears that the fire protection features associated with the above plant areas were properly maintained and fully functional except for fire doors RA 316, RA 318, and the rolling fire door between Trains "A" and "B" switchgear rooms.
The above fire doors were installed during the current outage and are required to comply with the technical requirements of Appendix R,Section III.G.
The inspector identified that,ithe rolling fire door on elevation 43.0 ft. separating Trains "A" and
"B" switchgear rooms was not properly installed.
An approximate lk inch open gap was present at the bottom of the door guide rail located on the south edge and 4 inch gap on the north edge door.
The licensee took prompt corrective action and extended the door guide rails to the floor.
The inspector also identified on elevation 14.5 ft. of the Reactor Auxiliary Building that Fire Door RA 316 was missing a hinge screw from the top hinge and the door frame was not properly sealed into the three-hour fire barrier wall separating Fire Area
"A" 'from Fire Area "C".
In addition, the inspector identified that'he door frame for Fire Door RA 318 on Reactor Auxiliary Building Elevation 14.5 ft. was not properly sealed into the three-hour fire barrier wall separating Fire Area "A" and Fire Area "C" and
I'
II b
l I'
k H
a I
ll <<
)
'4
the inactive door of this double door assembly was not provided with the proper bottom door latching mechanism.
The licensee promptly initiated corrective actions to seal the subject door frames into the fire barrier wall assemblies and comnitted to correcting the hardware deficiencies associated with Door RA-318.
The plant tour also verified the licensee's implementation of the fire prevention administrative procedures.
The control of combustibles and flammable materials, liquids and gases and the general housekeeping was found to be satisfactory in the areas inspected.
Within the areas inspected, no violations or deviations were identified.
7.
Inspector Followup Items a ~
(Closed)
Inspector Followup Item (335/85-06-01),
Completion of,'Fire Damper Installation In Unprotected HVAC Openings Located in Thermolag Fire Barriers:
The licensee provided three hour fire-rated dampers manufactured by Air Balance and all fire damper installations throughout Unit I utilize the fire damper sleeve and internal expansion assembly manufactured by Pullman Construction Industries.
This item is closed.
b.
C ~
d.
(Closed)
Inspector Followup Item (335, 389/85-06-04),
Inadequate Inspection and Surveillance Program for Conduits Protection To Meet Appendix R:
The licensee has issued construction quality control technique sheet 10.36 fire barrier inspection.
This procedure will be utilized to perform the surveillance requirements for all the Unit I and 2 fire barrier assemblies.
Therefore, this item is closed.
(Closed)
Inspector Followup Item (335/85-06-14),
Review of Appendix R
Cable Protection for Fire Pump Power Cable:
The fire pump cables have been rerouted.
The train "A" fire pump cables (10852A, B and C)
come out of manhole 154 and enter the train
"A" penetration room on elevation 19.5 ft. of the reactor auxiliary building.
Then these cables are routed through the train "A" cable loft up to the 43.0 ft.
elevation into the train "A" switchgear room.
The train "B" fire pump cables (10853A, B and C)
come out of manhole 157 and enter the -0.5 ft. elevation of the reactor auxiliary building.
Then these cables are routed up through elevation 14.5 ft., then into the train "B" switchgear room on elevation 43.0 ft.
The train
"A" and
"B" fire pump cables are routed through separate Unit I fire areas therefore, this item is closed.
(Closed)
Inspector Followup Item (335/85-06-15),
Inadequate Fire Detection Capability Provided In The Lower Level of The Component Cooling Water Pump House:
The licensee has installed two rate-compensated heat detectors in the lower level of the component cooling water pump house.
This item is close w V
+
v