IR 05000335/1981024
| ML20031E892 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie |
| Issue date: | 10/07/1981 |
| From: | Mcguire D, Tobin W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | |
| Shared Package | |
| ML19260J125 | List: |
| References | |
| 50-335-81-24, NUDOCS 8110160523 | |
| Download: ML20031E892 (1) | |
Text
-
-
..-
._
,
.
.
O
'
f3TERML TRMiSMmfD HEREVllili CONTAINS 2.790;d) SAFEGuscS INf0RIMJ10N OCT 7 1981 Report No. 50-335/81-24 Docket No. 50-335 License No. DPR-67 Licensee:
Florida Power and Light Company
'
9250 West Flagler Street Miami, FL Facility Name:
St. Lucie Nuclear Plant Inspection at:
St. Lucie site near Ft. Pierce, Florida Inspection Conducted:
September 22-24, 1981 Date of Last Physical Security Inspection Visit: May 11-14, 1981 Type of Inspection:
Unannounced Physical Security Inspector:
(
Iq g f/.
W. J. Tobin, Phfqicar Security Inspector catelSigned Approved b N
fM 10 l 7 l8 i D. R. McGu1re, Chic-7, Physical Security Section Date Signed Technical Inspection Branch Division of Engineering and Technical Inspection Inspection Summary Areas Inspected:
Included review of Unresolved Items, vital area barriers and access controls, detection aids, assessment aids, compensatory measures, and independent in>pection effort.
The inspection involved 24 inspector hours on site by one NRC inspector. The inspection was begur during a regular period.
Results: The licensee was found to be in compliance with NRC requirements within the five areas examined. Unresolved Item 80-04-06 was closed.
.
tl 10$
s-n Copy d-O
$
_Pages EDocrcent is not to be
'
... reproduced without specific
,
approval of IE:Il -
8110160523 811 '
DNT
gDRADOCK05
_J