U. S. NUCLEAR REGULATORY COMMISSION Region I Report No. 50-334/82-20 Docket No. 50-334 License No. DPR-66 Safeguards Group-IV Licensee:
Duquesne Light Company 435 Sixth Avenue Pittsburgh, Pennsylvania Facility Name:
B_eaver Valley Power Station, Unit 1 Inspection At:
Shippingport, Pennsylvania
Inspection Conducted:
July 28, 29, 1982 Date of Last Material Control and Accounting Inspection: August 28, 1979 Type of Inspection:
Ungnounced Material Control and Accounting Inspectors:
9-13-% K
. C'ohen, Chemi st date signed date signed Approved By:
h k88 AM Gody, Ctrief Sa Gards Section d' ate ' signed Inspection Summary:
Unannounced Inspection on July 28, 29, 1982 (Inspection Report No. 50-334/82-20)
Areas Inspected: Routine inspection of nuclear material control and i
accounting including:
Facility Organization and Operation; Shipping and Receiving; Storage and Internal Control; Physical Inventory; and Records and Reports. The inspection involved 16 inspector-hours onsite by a regional based NRC inspector.
Results: The licensee was found to be in compliance with NRC requirements within the areas examined.
8209300187 820914 PDRADOCK05000g G
..
-
.
- - -
-
.
_,
.-
- - _ - _ _ _ _ _ _
_ _ _ - _ _ _ _ ____
_ _ _ -.
,-
.
e DETAILS 1.
Key Persons Contacted
- F. Bissert, Mgr. Nuclear Support Services
- F. Lipchick, Senior Compliance Engineer
- J. V. McGee, Director, Budget, Planning and Scheduling
- B. Fenner, Data Coordinator
- W. Troskoski, NRC Resident Inspector The inspector also interviewed several other licensee personnel.
- denotes attendance at at the exit interview.
~
2.
30703 - Exit Interview The inspector met with the licensee representatives (denoted in paragraph 1) at the conclusion of the inspection on July 29, 1982 and summarized the scope and findings.
3.
92713 - Independent I..spection Effort No violations were identified.
The inspector toured the facility and determined that the licensee's possession and use of special nuclear material was in
accordance with NRC requirements.
4.
85102 - Material Control and Accounting a.
Facility Organization and Operation l
No violations were identified.
The inspection results were obtained through discussions with licensee personnel and review of procedures contained within the Nuclear Material Control Manual dated October 31, 1980.
The manual contained adequate procedures for special nuclear material (SNM) control and accounting which were implemented by the licensee.
b.
Shipping and Receiving No violations were identified The inspector determined tt licensee had established procedures to assure that M received or shipped was accurately accounted for.
,
.
.
..
_
-
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
-
/
.
.
c.
Storage and Internal Cc;1 trol No violations were identified.
The licensee established a system of storage and internal control of SNM which provided for current knowledge of the quantity and identify of all SNM within the facility.
.
d.
Physical Inventory No violations were identified.
The inspector reviewed supporting records that showed physical inventories were conducted'at least annually as required by 10 CFR 70.51(d). The inspector reviewed supporting records which reconciled with the quantity of SNM shown as of March 31, 1982.
e.
Records and Reports No violations were identified.
The inspection results were attained through an audit of all Material Status reports (Form NRC-742) submitted as required by 10 CFR 70.53, for the period April 1, 1979 through March 31, 1982. Material balances for the period reviewed are shown in attached Exhibit r
_
'
-
.,
EXHIBIT I Beaver Valley Power Station,. Unit 1
-
Docket No. 50-334-License No. DPR-66 Material Balance Period: April 1, 1979 - March 31, 1982 Reporting-Identification Symbol: XGD Reporting Unit: Grams Enriched Uranium Plutonium Element Isotope Element Isotope Beginning Inventory:
-95,441,788 1,830,427_
419,082'
338,428
@ 4/1/79 Receipts:
23,831,476 714,765
---0---
---0---
Production:
0----
0----
232,888 160,529 Material to Account For:
119,273,264 2,545,192 651,970 498,957 Removals:
Shipments:
916,392 28,408
---0---
---0---
Fission and Transmutation:
1,105,483 575,918
---0---
---0---
Decay:
0----
0----
1,827 1,827 Total Removals:
2,021,875 604,326 1,827 1,827 Physical Inventory 117,251,389 1,940,866 650,143 497,130 0 3/31/82:
Material
, Accounted For:
119,273,264 2,545,192 651,970 498,957