4
' p[E4 UNITED STATES
- ' "
-- [
k NUCLEAR REGULATORY COMMISSION
['
f.,
REGION 11 g
j 101 MARIETTA STREET,N.W.
- *
I ir ATLANTA, GEORGIA 30323
\\...../
Report Nos.:
50-321/85-27 and 50-366/85-27 Licensee: Georgia Power Company P. O. Box 4545 Atlanta, GA 30302 Docket Nos.:
50-321 and 50-366 License Nos.:
DPR-57 and NPF-5 Facility Name: Hatch 1 and 2 Inspection Dates: August 31 - October 11, 1985 Inspectors:
[ud// I
/#
P. Holimrs-May, deniopsTpffFt l'nspector Date Signed b8IAf
^
u G. N j fel t,
ent p ct4F Bite Signed Approvedby:k.N
/L a n ///m
/0/k N
,
VY 'W. Tancidfa', CEfef, Troject Section 2B
'Da'te Sfgned Division of Reactor Projects SUMMARY Scope:
This inspection involved 196 inspector-hours on site :n the areas of Technical Specification compliance, operator performance, overall ~ plant operations, quality assurance practices, station and corporate management practices, corrective and preventive maintenance activities, site security procedures,' radiation control activities, ' surveillance activities, and TMI Task action plan items.
Results: Of the areas inspected, no violations or deviations were identified.
8511040301 851028 PDR ADOCK 050
0
.
-
...
.
REPORT DETAILS
~1.
Persons Contacted Licensee Employees
- H. C. Nix, Site General Manager
- T. Greene, Deputy Site General Manager
- H. L. Sumner, Operations Manager
- T. Seitz, Maintenance Manager C. T. Jones, Engineering Manager
'R. W. Zavadoski, Health Physics and Chemistry Manager
- P. E. Fornel, Site ~QA Manager
- S. R. Tipps, Superintendent of Regulatory Compliance Other licensee employees contacted included technicians, operators, mechanics, security force members and office personnel.
- Attended exit interview 2.
Exit Interview The inspection scope and findings were summarized on September 27 and October 11, 1985, with those persons indicated in paragraph 1 above. During the reporting period frequent discussions were held with the General Manager and/or his assistants concerning inspection findings.
The licensee acknowledged the findings and took no exception.
The licensee did not identify as proprietary any of the material provided to or reviewed by the inspector during this inspection.
3.
Licensee Action on Previous Findings i
The following item has been reviewed by the inspectors and is considered resolved:
,
(Closed) Violation (321, 366/84-41-01):
Personnel errors on residual heat
,
removal service water (RHRSW) pumps, reactor water cleanup system flow transmitter, and jockey pump discharge valve lineup.
4.
Unresolved Items In report 366/84-41 an unresolved item was opened concerning improper bolting material installed in RHRSW pumps. This item was unresolved pending the completion and review of a licensee audit to determine if there had been a quality assurance program breakdown within Johnson Pump Company, Bechtel Power Corporation, and/or the Southern Company Services Hatch Support Group.
The inspector's review of the licensee's audit has been completed and it was determined that no programmatic breakdown of quality assurance occurred.
This item is closed (366/84-41-03).
~
~
--x
I
.,
.....
5.
Plant-Tours (Units 1 and 2)
,The inspectors conducted plant tours periodically during the inspection interval. to verify that monitoring equipment was recording as required, equipment was properly tagged, operations personnel were aware of plant conditions, and plant housekeeping efforts were adequate.
The inspectors also determined that appropriate radiation controls were properly estab-lished, critical clean areas were being controlled in accordance with procedures, excess equipment or material was stored properly and combustible material and debris were disposed ofE expeditiously.
During tours the insoectors looked for the existence of unusual. fluid leaks, piping vibra-tions, pipe hanger.and seismic restraint settings, various valve and breaker positions, equipment danger and caution tags, component positions, adequacy of fire fighting equipment, and instrument calibration dates.
Some tours were conducted on backshifts and weekends.
The inspectors routinely conduct partial walkdowns of emergency core cooling systems (ECCS).
Valve and breaker / switch lineups and equipment conditions
.are randomly verified both locally ar.d in the control room.
During the inspection period the inspectors conducted a complete walkdown in the accessible areas of the high pressure coolant injection (Unit 1) system to verify that the lineups were in accordance with licensee requirements for
-
operability and equipment material conditions were satisfactory.
Within the areas inspected, no violations or deviations were identified.
6.
Plant Operations Review (Units 1 and 2)
The inspectors periodically during the inspection interval reviewed shift logs and operations records, including data sheets, instrument traces, and records of equipment malfunctions. This review included control room logs, auxiliary logs, operating orders, standing orders, jumper logs, and equipment tagout records.
The inspectors routinely observed operator alertness and demeanor during plant tours.
During normal events, operator performance and response actions were observed and evaluated.
The inspec-tors conducted random off-hours inspections during the reporting irterval to assure that operations and security remained at acceptable levels. Shift'
turnovers were observed to verify that they were conducted in accordance with approved licensee procedures.
7.
Technical Specification Compliance (Units 1 and 2)
During this reporting interval, the inspectors verified compliance with selected limiting conditions for operations (LCOs) and results of selected surveillance tests. These verifications were accomplished by airect obser-vation of monitoring instrumentation, valve positions, switch positions, and
-
review of completed logs and records.
The. licen'see's compliance with selected LC0 action statements were reviewed on selected occurrences as they happened.
Within the areas inspected, no violations or deviations were identified.
i
=-
..
- -
- *
8.
Physical Protection (Units 1.and 2)
The inspectors verified by observation and interviews during the reporting interval that measures taken to assure the physical protection of the facility met current requirements.
Areas inspected included the organi-zation of the security force, the establishment and maintenance of gates, doors and isolation zones in proper condition, that access control and badging was proper, and procedures were followed.
Within the areas inspected, no violations or deviations were identified.
9.
Review of Nonroutine Events. Reported by the Licensee The following Licensee Event Reports (LERs) were reviewed for potential generic impact, to detect trends, and to determine whether corrective actions appea. red appropriate.
Events which were reported immediately were also reviewed as they occurred to determine that -Technical Specifications were being met and the public health and safety were of utmost considera-tion.
Unit 1:
85-21, 85-23, 85-24, and 85-28
'
Unit 2:
84-30 Rev. 2, 85-22, 85-28, 85-28 Rev 1, and 85-29 10.
TMI Action Plant Requirement Followup (Units 1 and 2)
II.K.3.22.B'(Closed) RCIC Automatic Suction Switchover Documentation of inspection of this item was included in IE Report Number 366/83-29.
The item remained open pending approval and issuance of Technical Specifications (TS) changes. The changes required to TS have been approved and issued.
This item is closed (Units 1 and 2).
II.K.3.28 (Closed) Verify Qualification of Accumulators on ADS Valves Documentation of inspection of this item was included in IE Report Number 366/83-29.
The item remained open pending TS changes and review of the plant emergency procedures. The TS changes were issued in Amendment 111 (Unit 1) and 50 (Unit 2).
The issuance of these TS changes completed required, action on this item. This item is closed (Units 1 and 2).
t
- .
-
7-
, - - ~ - - -
a
- - - --,
r w-,e