IR 05000321/1985020

From kanterella
Jump to navigation Jump to search
Insp Repts 50-321/85-20 & 50-366/85-20 on 850617-19.No Noncompliance Noted.Major Areas Inspected:Changes to Physical Security Plan & Implementing Procedures & Security Organization.Details Withheld (Ref 10CFR2.790 & 73.21)
ML20129J162
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 07/15/1985
From: Mcguire D, Tillman A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20129J156 List:
References
50-321-85-20, 50-366-85-20, NUDOCS 8507220330
Download: ML20129J162 (1)


Text

'-

.

pa Krog UNITED STATES

/

'o NUCLEAR REGULATORY COMMISSION

~

,8 -

REGloN 11 n

g j

101 MARIETTA STREET,N W.

't ATLANTA. GEORGI A 30323 -

%...../

jyt,17 $85 Report Nos. 50-321/85-20 and 50-366/85-20 Licensee: Georgia Power Company P. O. Box 4545 Atlanta, Georgia 30302 Docket Nos.

50-321 and 50-366 License Nos.

DPR-57 and NPF-5 Facility Name: Hatch Unit 1 and 2 Inspection Da June 17-19, 1985

-

%

'7// ffW Inspect er

--

9. Tillm Physical Security Inspector Date Signed A'

Approved by:

7//s!/[

D. R. McGuire, Chief, Physical Security Section D&te ' Signed Nuclear Materials Safety and Safeguards Branch Division of Radiation Safety and Safeguards SUMMARY Scope:

This routine, unannounced inspection entailed 14 inspector-hours on site (one hour on backshift) inspecting:

changes to the Physical Security Plan and Implementing Procedures; Manageme.

Effectiveness - Security Program; Security Organization; Physical Barriers - ;.otected Area; Physical Barriers'-

Vital Areas; Compensatory Measures; Access Control - Personnel; Access Control Packages; Access Control-Vehicles; and Communications.

Results:

The licensee was found to be in compliance with regulatory requirements and physical security plan commitments within the 10 areas inspected.

8507220330 850717ADOCK 05000321 PDR PDR G

SAFEGUARDS INFORMATIO SArsociaDSinom u0, UPON SEPARATION THIS PAGE IS DECONTROLLED.

_ _,__ __