IE Insp Rept 50-320/78-01 on 780105-06.No Noncompliance Noted.Major Areas Inspected:Scope & Findings of NRC Fire Prevention Survey Team
ML19220B132
Person / Time
Site: Crane Constellation icon.png
Issue date: 01/23/1978
From: Ebneter S, Paolino R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML19220B130 List:
References
50-320-78-01, 50-320-78-1, NUDOCS 7904250470
Download: ML19220B132 (4)


Text

.

.

U.S. NUCLEAR REGULATORY C0f' MISSION OFFICE OF It!SPECTION AND ENFORCEMENT Region I Report No.

50-320/78-01 Docket No.

50-320 License No.

CPPR-66 Priority

--

Category B

Licensee:

Metrocolitan Edison Comoany P. O. Box 542 Reading, Pennsylvania 19603 Facility Name:

Three Mile Island Nuclear Station - Unit 2 Inspection at:

Middletown, Pennsylvania Inspection conducted:

anuary 5-6, 1978 Inspectors:

/ 'J3' 7 V R. J. P lino, Reactor Inspector date signed Fire Prevention / Protection Survey Team:

T. M. Lee, NRC-DOR H. J. Virgillo, NRC-DOR H. Silver, NRC-LPM E. MacDcugall, BNL-NRC J. H. Riopelle, BNL-NRC J. Klevan, Roll-Jensen & Assoc., Inc.

App oved by

% E 3, / f 7 M S. D. Ebneter, Chief Engineering cate signed Support Section No. 2 Reactor Construction & Engineering Support Branch

__ _

Insoection Sumary:

Inscection on January 5-6, 1978 (Recort No. 50-320/78-01)

Areas Inspected:

Review and discussions with licensee representative of sccpe and findings of the'NRR fire prevention / protection survey team facility tour.

The discussions and review covered 13 inspector hours onsite by one NRC inspector.

Results: No items of noncompliance were identified.

'

'

790425047o i

73 2D

DETAILS _

l.

Persons Contacted General Public Utilities Corocration Mr. J. J. Bordan, Project Manager, TMI-2 Mr. R. C. Cutler, Project Engineer

-

Mr. W. H. Hirst, Director of Projects Mr. W. F. Itschner, Senior Mechanical Engineer Mr. J. h. Thorpe, Chairman, GORB Mr. R. L. Williams, Manager, Engineering Metropolitan Edison Comoany Ms. L. Fisher, Nuclear Engineer Mr. E. F. Gee, TMI-2 Safety Supervisor Mr. G. H. Grice, Supervisor, Safety Generation Mr. R. M. Klingaman, Manager, Generation Engineering Mr. C. Smyth, TMI-2 Lead Licensing Engineer Mr. R. K. Swavely, Assistant Safety Engineer

.

Burns & Roe Mr. J. Cady, Jr., Project Manager, TMI-2 Mr. R. Gaspercie, Engineer Mr. I. Rubin, Engineer EDS Nuclear Mr. R. Baschiere, Engineer Consultant Mr. W. J. Ritsch, Engineer Consultant (Manager)

Mr. G. Rahner, Engineer Consultant M & M Protection Consultants Mr. J. P. Oliver, Fire Protection All of the above personnel were present at the exit interview.

.

.

i

}

73-248

.

.

2.

Fire Prevention / Protection Procram Evaluation The Nuclear Regulatory Review (NRR) team examined the followina a.

areas:

Control Rooms

--

Cable Spreading Room

--

Computer Room

--

Battery Rooms

--

Diesei Generator Rooms

--

!

Switchgear Rocms

--

Safety-Related Pump Areas

--

Diesel Fuel / Auxiliary Boiler Fuel Storage Tanks

--

--

Auxiliary Boiler Area Fire Pump Areas

--

b.

The above areas were examined for (as applicable):

General Conditions, including noncongestion and accepta-

--

bility Separation between redundant trays and conduits.

--

Barrier and Fire Stops

--

Fire detection and suppression equipment

--

Ventilation systems and controls

--

Floor drains

--

Combustible equipment

--

Lighting

--

.

I 73-249

-

.

.

.

-

Combustible materials

--

--

Equipment protection from water damage Ability to contain fire or isolate from external fire

--

Means for containing oil spills

--

Means for detecting hydrogen accumulation or loss of

--

ventilation (battery rooms)

.

Fire training

--

3.

Exit Inter' view

.

The inspector and the NRR fire prevention / protection survey team met with the licensee representatives (denoted in Paragraph 1)

at the conclusion of the inspection on January 6, 1978. The NRR review team summarized the scope and findings of the inspection, followed by a discussion with the licensee of approximately 100 generic type questions and associated team positions pertaining to minimum modifications, additions, and/or changes necessary to upgrade the licensee's fire prevention / protection program.

The team positions and licensee commitments will be summarized in a report to be issued by the NRR fire prevention / protection survey team.

,

(

!73-250