Forwards IE Insp Rept 50-320/78-01 on 780105-06.No Noncompliance Noted
ML19220B129
Person / Time
Site: Crane Constellation icon.png
Issue date: 01/25/1978
From: Robert Carlson
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Herbein J
METROPOLITAN EDISON CO.
Shared Package
ML19220B130 List:
References
NUDOCS 7904250468
Download: ML19220B129 (2)


See also: IR 05000320/1978001

Text

4

CE^l W L f ids

.

.

g" "'C %

UNITED STATES

,g

NUCLEAR REGULATORY COMMISSION

.

,

,

Q c( , 2

REGION I

,

-('-

d/

E

$31 P ARK AVENUE

"-

O

. ,d '

KING OF PRUSSI A. PENNSYL.V ANI A 19406

gv j'

...e

50-320[73

J M 2 5 373

Docket No.

Metropolitan Edison Company

ATTN: th . J. G. Herbein

Vice President

P. O. Box 542

Reading, Pennsylvania 19603

,

Gentlemen:

Subject: -Inspection 50-320/78-01

This refers to the inspection conducted by Mr. R. Paolino of this office

on January 5-6, 1978, at Three Mile Island Nuclear Station, Unit 2,

Middletown, Pennsylvania, of activities authorized by NRC License No.

CPPR-66, and to the discussions of our findings held by Mr. T. Lee of

NRR (Division of Operating Reactors) with members of your staff at the

conclusion of the inspecti.on.

This inspection was to provide the Fire Protection Program review team

from the Office of Nuclear Reactor Regulation with direct knowledge of

the arrangement of safety related equipment, fire hazards, fire protec-

tion equipment, and administrative controls.

Areas examined during this inspection are described in the Office of

Inspection and Enforcement Inspection Report which is enclosed with this

letter. d thin these areas, the inspection consisted of selective

examinations of procedures and representative records, interviews with

personnel, and cbservations by the inspector.

Within the scope of this inspection, no items of noncompliance were

observed.

In accordance wi N Section 2.790 of the NRC's " Rules of Practice," Part

2, Title 10, Code of Federal Regulations, a copy of this letter and the

enclosed inspectico report will be placed in the NRC's Public Document

Room.

If this re9ert contains any information that you (or your contractor)

believe to be prcprietary, it is necessary that you make a written

application within 20 days to this office to withhold such infonnation

from public disciosure. Any such application must be accompanied by an

affidavit executed by the owner of the information, which identifies the

document or part sought to be withheld, and which contains a statement

(

7 904 2 5 0 MF

Dw'N

g

'

'ja- 245

.

.

Metropolitan Edison Company

2

of reasons which addresses with specificity the items which will be

considered by the Commission as listed in :;ubparagraph (b) (4) of Section

2.790. The information sought to be withheld shall be incorporated as

far as possible into a separate part of the affidavit.

If we do not

hear from you in this regard within the specified period, the report

will be placed in the Public Document Room.

No reply to this letter is required; however, should you have any ques-

tions concerning this inspection, we will be pleased to discuss them

with you.

Sincerely,

k

~~

,

Robert T. Carlson, Chief

Reactor Construction and Engineering

Support Branch

Enclosure: Office of Inspection and Enforcement

-

Inspection Report Number 50-320/78-01

cc w/ encl:

R. L. Wayne, QA Manager, Design & Construction

T. Gary Broughton, Safety & Licensing Manager

G. P. Miller, Superintendent

R. W. Heward, Jr., Project Manager

R. C. Arnold, Vice President, Generation-

Gerald Charnoff, Esquire

Miss Mary V. Southard, Chairman Citizens for a Safe Environment

(Without Report)

I

i

73 246