IR 05000320/1974004
| ML19206B066 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 07/16/1974 |
| From: | Folsom S, Heishman R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | |
| Shared Package | |
| ML19206B052 | List: |
| References | |
| 50-320-74-04, 50-320-74-4, NUDOCS 7904210755 | |
| Download: ML19206B066 (5) | |
Text
-
'
e I
,
,/
-
-
..
.
.
,
.
.
U. S. ATOMIC ENERGY CO}D1ISSION I
J DIRECTORATE OF REGULATORY OPERATIONS
REGION I
50-320/74-04 Docket No.: 50-320 RO Inspection Report No.:
CPPR-66 ensee Mett p lit n Edison Cenpany License No.:
P.O. Box 542 Priority:
Reading, Pennsylvania 19603
-
Qtegory _ h Middletown, Dauphin County, Pennsylvania (Three Mile Island 2)
PWP.,871 MWe (B&W)
Type of Licensee:
.
" ""'
"*" ""
Type of Inspection:
"
Dates of Inspection:
-
Dates of Previous Inspect nn:
[2 ]h W%),
Reporting Inspector:
s Seth A. Folsom
/
Dape
,
i
"
Accompanying Inspectors:
Date
.
ef '
'
Date
.
l None
!
Other Acconpanying Personnel:
Date
,
_
7//S[7k j
Reviewed By:
JCL
R F. Heishman, Senior Reactor Inspector
!
G4-1S9 s
-
-
7904210755
_
.
.
.
.
SU10!ARY OF FINDI?:CS
'
Enforcement Action A.
Contrary to Crite.1,on III. Appendix B, 10 CFR 50:
Portions of the temporary polar crane support towers were permanently embedded into the containment structure concrete without required documentation.
(Details, Paragraph 2)
B.
Contrary to Criterion VI. Appendix B, 10 CFR 50:
Drawings on stick files in the field were found to be superseded.
(Details, Paragraph 3)
Licensee Action on Previously Identified Enforcement Matters The licensee had assembled all required documentation on the liner plate
-
This item is resolved.
(Details, Paragraph 6)
None Unusual Occurrences None Other Significant Findings A.
Current Findings Electrical cable tray installation was reported to be 35 complete,
_
and cable pulling is scheduled to start September 1974.
B.
Status of Previously Reported Unresolved Items 1.
The following items were resolved during the inspection:
a.
Polar crane girder vents.
(Details, Paragraph 4)
b.
Documentation of weld filler electrode used on major cocponents.
(Details, Paragraph 5)
_
2.
The following ite=s remain unresolved:
{
Flexible membrenes on liquid storage tanks.
a.
b.
Under-voltage trip assemblies on CRD's.
E4-1SO
-
_
W
.
.
.
.
-2-
-
Dynamic stress calculations on cain steam and pressurizer c.
relief valves.
d.
Vacuum break on fuel pool fill line.
e.
Condensate storage tank pu=p suction line screen.
f.
W-2 switch codification.
g.
Building spray pu=p motor modification.
h.
Valve dimensional documentation.
i.
Station battery recharging.
j. Limitorque switch replace =ent.
,
$jmt5 Manage =ent Interview f
-
The canagement interview was held at the site on June 28, 1974.
Personnel Attending General Public Utilities Service Co=cany Mr. W. T. Gunn, Project Site Manager Mr. M. J. Stromberg, Site Quality Assurance Auditor Mr. W. T. Sturgeon, Quality Assurance Auditor Mr. J. E. Wright, Quality Assurance Manager l
Mr. J. H. Wright, Civil Resident Engineer i
'
United Engineers & Constructors
_
Mr. V. E. Cichocki, QA/QC Coordinating Superintendent Mr. R. L. Hawkins, Construction Coordinator Mr. D. C. La=bert, Field Supervisor, Quality Control Mr. F. F. Long, Quality Control Englueet Mr. R. H. Hbson, Jr., Jab Engineer Burns & Roe
'
Mr. T. Block, Lead Site Quality Assurance Engineer Mr. W. R. Cobean, Jr., Site Proj ect Manager
_
Mr. M. Giannini, Civil / Structure Liaison Engineer i
G4-1S1
-
E
-
'
j
,
.
.
-3-
-
.
!
The following items were discussed:
A.
The inspector stated that he had found that portions of the temporary polar crane support towers had been permanently e= bedded in the contain-ment structure concrete.
The lack of documentation for this change appeared to violate Criterion III, Appendix B, 10 CFR 50.
The licensee acknowledged this informatien.
This item is unresolved.
(Details, Paragraph 2)
B.
The inspector stated that he had found that 21% of the drawings on field stick files had been superseded.
This was in violation of Criterion VI, Appendix B, 10 CFR 50.
The licensee acknowledged this infor:ation. This item is unresolved.
(Details, Paragraph 3)
C.
The inspector stated that the following items had been resolved:
.
1.
Polar crane girder vents.
(Details, Paragraph 4)
_
2.
Documentation of weld filler electrode used or. major components.
,
(Details, Paragraph 5)
The licensee acknowledged this infor=ation.
!
D.
The licensee stated that the installation of cable trays was reported to be 35% complete, with cable pulling scheduled to start Septe=ber, 1974. The procedures for cable installation and quality control were expected to be complete by August 1974 and the licensee agreed to notify the inspector when these were available for his examination.
_
.
.
.
.
_
,
.
G4~1S2
-
_
.
j/
<
.
I
!
DETAILS 1.
Persens Contacted General Public Utilities Service Cocoany Mr. W. T. Gunn, Project Site Manager Mr. R. W. Heward, Jr. Project Manager Mr. G. L. Kopp, Quality Assurance Engineer, Electrical Mr. P. Levine, Quality Assurance Specialist HW. G. L. Roshy, Auditor Mr. M. J. Stromberg, Site Quality Assurance Auditor Mr. W. T. Sturgeon, Quality Assurance Auditor Hr. J. E. Wright, Quality Assurance Manager Mr. J. H. Wright, Civil Resident Engineer United Engineers & Constructors
-
Mr. V.
E.' Cichocki, QA/QC Coordinating Superintendent Mr. R. L. Hawkins, Construction Coordinator Mt. D. C. La=bert, Field Supervisor, Quality-Control Mr. F. F. Long, Quality Control Engineer Mr. R. H. Mason, Jr., Job Engineer Burns & Roe i
Mr. T. Block, Lead Site Quality Assurance Engineer Mr. R. J. Dobbs, Project Manager (Paramus Office)
-
Mr. W. R. Cobean, Jr.. Site Project Manager
Hr. M. Giannini, Civil / Structural Liaison Engineer Mr. P. Nardone, Vice President Project Operations (Gradell Office)
l 2.
Embedment of Temporary Tower Supports
_
The licensee changed the sequence of operations in the construction of
-
the containment building.
This resulted in the placement of the fuel
!
pool vall.corerete without removing the temporary polar crane supports, I
two of which were found embedded to a height of 65 ft. in the permanent fuel peel concrete. This embedment included the 6-ft. square columns,
'
together with steel braces and steel plates 6 ft x 4-1/2 ft x l-1/2 in.
thickness.
At the time of the inspection a program of removing protruding steel and refinishing the concrete was in progress.
The work of c= bedding the temporary polar crane supports had been perforced -
without documented evidence of detailed drawings, calculatior.s or procedures.
Undocumented codifications, including rebar cutting, were also made on adjacent columns to accom=odate braces and cables.
This item is unre-solved.
G4-1S3
-
M
.
.
.-;
.
~5-
a 3.
Drawing Control The insoector selected at random a total of 48 drz. wings frem several Included were structural, piping and electrical fie'd stick files.
driy.;L.,in a-M tion to piping isometrics.
- ds x3
-~
-
.?
>s-d. K "T ~j were fcund to be outdated, (21*D, br. sed upon exa=ina-
.
s c.. _. _.-
t;;* \\ the ti 8Mg control records in the field engineering office.
i.2t :.35.32)erseded drawings were found in the 48 selected drawings,
~'
~
Tw bu_ inese t.ure not counted as deficient inasmuch as they had been received by the field engineering office less than a week previously.
An analysis of the drawing dates indicated that cost of the delay in drawing distribution occurred in the architect-engineer's home office.
This item is untasolved.
4.
Polar Crane Box Girder Vents
-
.
The inspector exa=ined Whiting Corp. Drawing No. LL61835, Revision 6,
'
January 11, 1972 which showed 27-in. dia=eter vent holes in the box i
girders, in addition to 18 in. x 36 in. openings in each partition l
stiffener. A field examination of the box girders showed conformance to the drawings. This item is resolved.
5.
Weld Filler Electrodes - Major Components The inspector examined the documentation concerning the weld filler The electrodes used on the reactor vessel and the steam generators.
documentation included Babcock & Wilecx Topical Report No. 1402 and a June 7, 1973 Babcock & Wilcox letter to the licensee referencing
"Three Mile Island 2 resolution of Weld Filler Material, B&W, NSS-6."
This iten is resolved.
_
6.
Containment Liner Plate Penetration Docu=entation The documentation of the containment liner plate penetration was partially resolved at the previous inspection (Inspection Report No.
50-320/'4-03). At this inspection the inspector examined the licensee's audit of the penetration documentation, GPUSC Audit No. 74-38, June 5, 1974, which included a statement that the deficiency had been cleared.
This item is resolved.
_
G4-1S4
-