ML19206B055
| ML19206B055 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 07/16/1974 |
| From: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | |
| Shared Package | |
| ML19206B052 | List: |
| References | |
| 50-320-74-04, 50-320-74-4, NUDOCS 7904210745 | |
| Download: ML19206B055 (2) | |
Text
)h'i s
~
.-[
~
s
~$
i
%./.
l ENCLOSIC2 DESCRIPTION OF VIOLATIONS Metropolitan Edison Cc=pany Docket No. 50-320 License No. C?PR-66 Certain activitics under your licence appear to be in violation of AEC These apparent violations are considered to be of Category requirements.
II severity:
Criterion III, Design Contrei, Appendix B, 10 CFR 50, states in part,
" Measures shall also be establiched for the selection and revicu for 1.
suitnbility of applications of =sterials, parts, equip =ent and process that are essential to the safety-related functions of the structures, systcas and conponcuts."
Contrary to the above, certain portions of the tc=porary polar crane support towers were per:nnently c= bedded into the containment structure concrete without required docu=entation.
Criterion VI, Docunent Control, Appendix B, 10 CFR 50, states in part, 2.
"Heasures shall be established to control drawings, including changes These thereto, which prescribe all activities affecting quslity.
measures chall cesure that docu=cnts are--used at the location where the prc cribed activity is perforned."
Contrary to the above, a randc:2 selection by our inspector of drawings on several stick files in the field shoucd that 21*. of the drauings had been cupcrseded. A similar condition was reported to you in our letter of August 29, 1972.
/
I C4-*S7 e
79042107 Sg
s F.etropolitan Edisen Conpany.
bec:
(w/encis)
RO Q11ef, FSLEB RO:UQ (5)
DL (4 v/encls plus 9 cpys of report only)
DR Central Files RS (3)
PDR Local PDR EO Files TSIC DTIE Stnte of Pennsylvania F2 Reading Rocn liisa. !!ary V. Southard, Chaire.an Citiscus for a Safe Environnent P. O. Box 405 Earrisburg, Pennsylvania 17108 e
au e
0 1
.s
_