IR 05000317/1981025
| ML20062K872 | |
| Person / Time | |
|---|---|
| Site: | Calvert Cliffs |
| Issue date: | 08/11/1982 |
| From: | Martin T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Lundvall A BALTIMORE GAS & ELECTRIC CO. |
| Shared Package | |
| ML20062K875 | List: |
| References | |
| NUDOCS 8208180043 | |
| Download: ML20062K872 (1) | |
Text
.
.
Docket Nos. 50-317 50-318 Baltimore Gas and Electric Company ATTN: Mr. A. E. Lundvall, Jr.
Vice President, Supply P. O. Box 1475 Baltimore, Maryland 21203 Gentlemen:
I Subject: Combined Inspection 50-317/81-25; 50-318/81-24
'
This refers to your letter dated July 15, 1982, in response to our letter dated June 15, 1982.
Thank you for informing us of the corrective and preventive actions documented in your letter. These actions will be examined during a future inspection of your licensed program.
Your cooperation with us is appreciated.
Sincerely, Original 51soed BTI L19Y & Y T omas T.] Martin, DirectorCL//DA ivision of Engineering and, Technical Programs cc:
R. H. Douglass, Manager, Quality Assurance L. B. Russell, Plant Superintendent
!
T. Sydnor, General Supervisor, Operations QA R. C. L. Olson, Principal Engineer J. A. Tiernan, Manager, Nuclear Power R. E. Denton, General Supervisor, Training and Technical Services Public Document Room (PDR)
Local Public Document Room (LPDR)
!
Nuclear Safety Information Center (NSIC)
State of Maryland (2)
NRC Resident Inspector l
bec:
l Region I Docket Room (with concurrences)
'
Chief, Operational Support Section Director, DPRP yl i
RI:DETP P
R DE
'
,
'
Kus e /ntm Jo ne l
8/ 'd gppg
?
h
)
0F I IAL RECORD COPY t
ff 'l 8208180043 820811 i
PDR ACOCK 05000317
!
O PDR
-
-
.
,
.
-
_
._
.
,
'
- *
.
.
..
BALTIMORE GAS AND ELECTRIC CHARLES CENTER.P. O. BOX 1475. BALTIMORE, MARYLAND 21203 An un c. Lunovatt, an.
July 15,1982 Vict PntscENT
$U PPLY U.S. Nuclear Regulatory Commission Docket Nos.
50-317 Region 1 50-318 631 Park Avenue License Nos.
DPR-53 King of Prussia, PA 19406 DPR-69
ATTENTION:
Thomas T. Martin, Director i
'
Division of Engineering and Technical Programs i
REFERENCES:
(a) Letter to Mr. A. E. Lundvall, Jr. from T. T. Martin, dated
June 15,1982; Combined In5pection 50-317/81-25; 50-318/81-24 l
(b) Letter to Mr. A. E. Lundvall, Jr. from T. T. Martin dated March 4,1982; Combined Inspection 50-317/81-25; 50-318/81-24 Gentlemen:
,
This letter is provided in response to reference (a). In order to achieve full compliance we are modifying our initial response to reference (b) by inserting "upon receipt" in place of "within 10 days." The modified response is Enclosure (1) to this letter.
~
Should you have further questions regarding this reply, we will be pleased to discuss them with you.
Very truly yours;'
/
-
//
. ~~d vat %
<
.
.
.
Vice President - Supply AEL/DWL/gla Enclosure cc:
3. A. Biddison, Esquire G. F. Trowbridge, Esquire D. H. Jaffe, NRC R. E. Architzel, NRC r
8208180051 820811
'
PDR ADOCK 05000317 G
....
-
.
-. _ - -
. - - - - _ _ _ _ _. _. _
--
'
.
.
Mr. T. T. Martin July 15,1982 Page 2 STATE OF MARYLAND
TO WIT:
CITY OF BALTIMORE
Arthur E. Lundvall, Jr., being duly sworn states that he is Vice President of the Baltimore Gas and Electric Company, a corporation of the State of Maryland; that he provides the foregoing response for the purposes therein set forth; that the statements made are true and correct to the best of his knowledge,information, an he was authorized to provide the response on behalf of sai jorporation.
/
WITNESS my Hand and Notarial Seal:
.L
~'
m Notary Public My Commission Expires:
. (
/, /[/,
j f
,
i
.
- _ -. _ _. - -., _. _ _ _. _ _,.
. _.....
.
.
.-
.
.
.
.
ENCLOSURE (1)
REPLY TO APPENDIX A OF NRC INSPECTION REPORT 50-317/81-25; 50-318/81-24 Due to the nature of the violation found during the NRC inspection, no corrective steps were required at the time of the violation. In order to avoid future violations, we will incorporate in plant procedures the requirement to move the non-fuel assembly Special Nuclear Material (SNM) inside the security fence upon receipt. When the non-fuel assembly SNM is inside the fence it will be controlled by the existing SNM procedures.
The procedure change will be made prior to the next receipt of non-fuel assembly SNM.
.
!
l
,
I
!
i i
,
--
--
- - - - - -
--