U. S. NUCLEAR REGULATORY COMMISS10N OFFICE OF INSPECTION AND EtlFORCEMENT
REGION I
50-317/81-10 Report Nc.
50-318/81-10 50-31/
DPR-53 Ca tegory C
Occket No.
50-318 License No.
DPR-69 Safeguards Group IV Licensee:
Baltimore Gas and Electric Company
"THIS DOCUMENT IS NOT TO BE REPRODUCED P.O. Box 1475 vnmm tT spFctFIC APPROVAL OF REGION "1" Baltimore, Maryland 21203 Facility Name:
Calvert Cliffs Nuclear Power Stations, Units 1 and 2 Inspection At:
Lusby, Maryland Inspection Conducted: April 13-16, 1981 December 7-11, 1980 Date of Last Physical Security Inspection:
TypeofInspeption: Unannounced Physical Protection Inspectors:
&N%L,fe h - J c> - 8 [
WiTliam Madden, Pnysical "rotection inspector date 1/b siff bl-Y/
Nancy pn, pysical Protection inspector date date Approved by:
% lY 7///fff J Es W. Devlin, Chief, Pnysical Protection Section
date Inspection Sulnmary:
Unannounced, Routine Physical Protection Inspection on April 13 16, 1981 (Report Nos. 50-317/81-10 and 50-318/81-10 Areas Inspected:
Included a review of the Security Plan; Security Program Audit; Security Organization; Physical Barriers (Protected Area); Physical Barriers (Vital Areas); Lighting; Access Control (Identification, Authorization, and Badging); Access Control (Search); Acces: Control (Escorting); Access Control (Vital Areas); Alarm Stations; Detection Aids; Assessment Aids; Communications; Testing and Maintenance; Compensatory Measures; Power Supply; Response; Locks, Keys and Combinations; and Records and Repcrts.
The inspection involved 70 inspector hours onsite by 2 Regional-based inspectors. The inspection began during regular workir,g hours and 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> were accomplished during offshift periods.
.Resul ts : The licensee was found to be in compliance with NRC requirements in all 20 functional areas inspected.