IR 05000317/1981010

From kanterella
Jump to navigation Jump to search
IE Insp Repts 50-317/81-10 & 50-318/81-10 on 810413-16.No Noncompliance Noted.Major Areas Inspected:Security Plan, Security Program Audit & Physical Barriers.Details Withheld (Ref 10CFR2.790)
ML20009H562
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 07/01/1981
From: Cogan N, Dexlin J, Madden W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML20009H557 List:
References
50-317-81-10, 50-318-81-10, NUDOCS 8108100245
Download: ML20009H562 (1)


Text

,

-

'

'

U. S. NUCLEAR REGULATORY COMMISS10N OFFICE OF INSPECTION AND EtlFORCEMENT

REGION I

50-317/81-10 Report Nc.

50-318/81-10 50-31/

DPR-53 Ca tegory C

Occket No.

50-318 License No.

DPR-69 Safeguards Group IV Licensee:

Baltimore Gas and Electric Company

"THIS DOCUMENT IS NOT TO BE REPRODUCED P.O. Box 1475 vnmm tT spFctFIC APPROVAL OF REGION "1" Baltimore, Maryland 21203 Facility Name:

Calvert Cliffs Nuclear Power Stations, Units 1 and 2 Inspection At:

Lusby, Maryland Inspection Conducted: April 13-16, 1981 December 7-11, 1980 Date of Last Physical Security Inspection:

TypeofInspeption: Unannounced Physical Protection Inspectors:

&N%L,fe h - J c> - 8 [

WiTliam Madden, Pnysical "rotection inspector date 1/b siff bl-Y/

Nancy pn, pysical Protection inspector date date Approved by:

% lY 7///fff J Es W. Devlin, Chief, Pnysical Protection Section

date Inspection Sulnmary:

Unannounced, Routine Physical Protection Inspection on April 13 16, 1981 (Report Nos. 50-317/81-10 and 50-318/81-10 Areas Inspected:

Included a review of the Security Plan; Security Program Audit; Security Organization; Physical Barriers (Protected Area); Physical Barriers (Vital Areas); Lighting; Access Control (Identification, Authorization, and Badging); Access Control (Search); Acces: Control (Escorting); Access Control (Vital Areas); Alarm Stations; Detection Aids; Assessment Aids; Communications; Testing and Maintenance; Compensatory Measures; Power Supply; Response; Locks, Keys and Combinations; and Records and Repcrts.

The inspection involved 70 inspector hours onsite by 2 Regional-based inspectors. The inspection began during regular workir,g hours and 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> were accomplished during offshift periods.

.Resul ts : The licensee was found to be in compliance with NRC requirements in all 20 functional areas inspected.

THE INFORMATION ON THIS PAGE IS DEEMED TO BE APPROPRIATE S-F1 -81 -74 FOR PUBLIC DISCLOSURE PURSUANT TO 10 CFR 2.790 Copy 7 of1 Copies

10 CFR 2.790 INF01U4ATION Region I Form 167 THE REPORT DETAILS CONTAIN 8108100245 810723 PDR ADOCK 05000317 l

G PDR

,