IE Insp Repts 50-317/81-20 & 50-318/81-19 on 810928-1002.No Noncompliance Noted.Major Areas Inspected:Security Plan & Implementing Procedures,Security Organization & Security Audit Program.Details Withheld (Ref 10CFR73.21)
ML20041B102
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 02/04/1982
From: Devlin J, Ladun R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML20041B097 List:
References
50-317-81-20, 50-318-81-19, NUDOCS 8202230272
Download: ML20041B102 (1)


Text

.

.

.

.

.

.

'

.

U.S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT 50-317/81-20 Report Nos. 50-318/81-19 50-317 Docket Nos. 50-318 DPR-53 License Nos. DPR-69 Safeguards Group IV Category C

Licensee:

Baltimore Gas and Electric Company P.O. Box 1475

-

Baltimore, Maryland 21203 Facility Name:

Calvert Cliffs Nuclear Power Plant, Units 1 and 2 Inspection At:

Lusby, Maryland Date of Last Physical Protection Inspection:

April 13-16, 1981 Inspection Conducted:

September 28-October 2, 1981 Type of Inspection:

Unapnounced Physical Protection Inspectors:

(/

- t.L-Ew d

[k

~

Lid 0n, Physical Prctection Inspector ddte'figned n

date signed Approved By:

'u-N b bd46

'Gh M

s J ies W. DevlinT Chief,' Physical Protection ddte'41ghed

. ection Inspection Summan :

Unannounced, Routine Physical Protection Inspection on September 28-October 2,1981 Report Nos. 50-317/81-20 and 50-318/81-19)

treas Inspected: Security Plan and Implementing Procedures; Security Organization (Management); Security Organization (Personnel); Security Organization (Response);

Security Program Audit; Records and Reports; Testing and Maintenance; Locks, Keys, d

$ga$ and Combinations; Physical Barriers (Protected Area); Physical Barriers (Vital Areas); Security System Power Supply; Lighting; Assessment Aids; Access Control

.

$g (Personnel); Access Control Packages; Access Control (Vehicles); Detection tw Aids (Protected Areas); Detection Aids (Vital Areas); Alarm Stations; and O

Communications. The inspection involved 44 inspector hours onsite by one gx a

regional-based inspector. The inspection began during regular working hours

and 10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br /> were accomplished during offshift periods.

Results: The licensee was found to be in compliance with NRC requirements o

in all twenty areas inspected.-