IR 05000313/1982016
| ML20054G675 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 06/11/1982 |
| From: | Seidle W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Cavanaugh W ARKANSAS POWER & LIGHT CO. |
| References | |
| NUDOCS 8206220189 | |
| Download: ML20054G675 (2) | |
Text
.
.
.
.
,
.
-
.
Juti 111982
Dockets: 50-313/82-16 50-368/82-13 Arkansas Power and Light Cogany ATTN: Mr. William Cavanaugh III
'
Senior Vice President Energy Supply Post Office Box 551 Little Rock, Arkansas 72203
Gentlemen:
This letter refers to the inspection conducted by Mr. R. A. Caldwell of this office during the period of April 26-27, 1982, of activities authorized by HRC Operating License DPR-51, and to the discussion of our findings with
.
you and other members of your staff at the conclusion of the inspection.
'
The inspection related to your program and activities designed to protect l
against industrial sabotage and to safeguard special nuclear material. The inspection was based on the applicable provisions of Title 10, Part 50 of
,
the Code of Federal Regulations entitled " Licensing and Utilization Facilities," within Part 73 entitled " Physical Protection of Plants and Materials," and the specific requirements of NRC License DPR-51. Areas examined during the inspection and our findings are documented in the enclosed inspection report. Within these areas the inspection consisted of selective examination of procedures and representative records, inter-views with personnel, and observations by the inspxtor.
.
Within the scope of this inspection, no violations or deviations were identified.
'
J The documentation of findings of your control and accounting procedures for safeguarding special nuclear materials and your facility's security proce-dures are exempt from disclosure. This exemption is covered within Title 10 r
l of the Code of Federal Regulations. Therefore the inspection report will not W ARNING j gog
'
UNAUTliORIZED DISCLOSURE IS PR0!ilBITED.
SECTION 147 ATOMIO ENERGY ACT 1954 AND 10 CTR 73.21. VICL ATIONS SUDJECT TO civil AND CRI:.tlHAL SANCil0NS.
8306220189 820611
-
PDR ADOCK 05000313 J.
(SI___
___
______G tC"M )
O PDR j;g 10 CFR 2.790 (d) INFORMATION
_ _ _ _. _ _ -
WE, A
,
IS CONTAINED IN THIS REPORT
~.~1 l CE9)
2 790(dA y
" * * >.PS.d j.PS.S. [
.RPS.- 4.
. R.P,8 2,,
.,
,.TPB.
D,RRP.&E.P
,RA-gy
""'I.RC.a.1,dge.,] i. P..QM.Ke].1.y.,
.RE.%..).
. W.CSeid).e....
.QDB.r.own.
.Q.EGa g1.1
..o..#T[.ol.). ins.,
d
' " > szz.us2..
. sM/.82...
.s.t.8g82 st.g.82..... Istq..tsa 4/..?./...... fth.ts2.....
,
! N" " "f 3't" ;" 'M"Erff', _ __O F FIC I A L R E C O R D_ CON _____ __ _ __ _ _
-
.
.
.
-
>
i
~
Arkansas Power and Light Company-2-JUN 111982 be placed in the Public Document Room and distribution will be limited. If you have any questions concerning this report, we will be pleased to discuss them with you.
Sincerely, W. C. Seidle, Chief Reactor Project Branch 2 Enclosure:
Appendix - NRC Inspection Reports 50-313/82-16 50-368/82-13 cc:
J. M. Levine, General Manager Arkansas Nuclear One Post Office Box 608 Russellville, Arkansas 72801 bcc: c/o DMB BC PM IE File IE/SB NMSS/SGPL NRR/DHFS NRR/DLB SSPB LPDR NRC PDR NSIC NTIS bcc:
RIV J. Gagliardo R. Caldwell J. Perry W. Johnson
,
,
c'ncc>
..
..
.
.
-
. eu a ~a- >
.
..
..
.
-
-
- "'>
......
.
.....
.........
.
.
.
..
-
-
l' unc rono 3i.,,0 0, sacu 02'
OFFICIAL RECORD COPY
_