IR 0500302-12-501, on 12/31/2012, Crystal River, Unit 3, Nuclear Generating Plant - U.S. Nuclear Regulatory Commission Emergency Preparedness Annual Inspection
ML13016A168
Person / Time
Site: Crystal River 
Issue date: 01/16/2013
From: Brian Bonser
NRC/RGN-II/DRS/PSB1
To: Franke J
Florida Power & Light Co
Linda K. Gruhler 404-997-4633
References
IR-12-501
Download: ML13016A168 (5)


Text

January 16, 2013

SUBJECT:

CRYSTAL RIVER UNIT 3 NUCLEAR GENERATING PLANT - U.S. NUCLEAR REGULATORY COMMISSION EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT NO 05000302/2012501

Dear Mr. Franke:

On December 31, 2012, the U.S. Nuclear Regulatory Commission (NRC) staff completed its annual inspection of the Emergency Preparedness Program at the Crystal River Nuclear Plant.

This inspection began on January 1, 2012. Issuance of this letter closes Inspection Report Number 2012501. Inspection activities charged to this report includes conducting midcycle/end of cycle assessment activities, responding to technical questions from resident inspectors or licensee personnel, NRC headquarters review of emergency action level and emergency plan changes, and in some cases, performing traditional enforcement activities. Any observations and findings in these areas were provided to you via separate correspondence.

In accordance with 10 CFR 2.390 of the NRC Rules of Practice, a copy of this letter, and your response, if any, will be available electronically for public inspection in the NRC Public Document Room, or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Brian Bonser, Chief Plant Support Branch 1 Division of Reactor Safety

Docket No. 50-302 License No. DPR-72

cc: (See page 2 and 3)

2 cc:

Lara S. Nichols Deputy General Counsel Duke Energy Corporation Electronic Mail Distribution

M. Christopher Nolan Director - Regulatory Affairs General Office Duke Energy Corporation Electronic Mail Distribution

Regis T. Repko Senior Vice President Duke Energy Corporation Electronic Mail Distribution

Richard A. Wiemann Superintendent, Nuclear Oversight Crystal River Nuclear Plant Electronic Mail Distribution

Brian C. McCabe Manager, Nuclear Oversight Shearon Harris Nuclear Power Plant Progress Energy Electronic Mail Distribution

Terry Hobbs Plant General Manager Crystal River Nuclear Plant (NA2C)

Electronic Mail Distribution

Blair P. Wunderly Director - Engineering Nuclear Crystal River Nuclear Plant (NA2C)

Electronic Mail Distribution

R. Alexander Glenn General Counsel Progress Energy Electronic Mail Distribution

Donna B. Alexander Manager, Nuclear Regulatory Affairs (interim)

Progress Energy Electronic Mail Distribution

Cynthia Becker (Acting) Chief Florida Bureau of Radiation Control Department of Health Electronic Mail Distribution

Daniel R. Westcott Supervisor Licensing & Regulatory Programs Crystal River Nuclear Plant (NA1B)

Electronic Mail Distribution

Joseph W. Donahue Vice President Nuclear Oversight Progress Energy Electronic Mail Distribution

David T. Conley Senior Counsel Legal Department Progress Energy Electronic Mail Distribution

Mark Rigsby Manager, Support Services - Nuclear Crystal River Nuclear Plant (NA2C)

Electronic Mail Distribution

Senior Resident Inspector U.S. Nuclear Regulatory Commission Crystal River Nuclear Generating Plant U.S. NRC 6745 N Tallahassee Rd Crystal River, FL 34428

Attorney General Department of Legal Affairs The Capitol PL-01 Tallahassee, FL 32399-1050

cc: (continued on see page 3)

3 cc: (continued from page 2)

Bryan Koon Director Florida Division of Emergency Management

Electronic Mail Distribution

Chairman Board of County Commissioners Citrus County 110 N. Apopka Avenue Inverness, FL 36250

ML13016A168

X SUNSI REVIEW COMPLETE X FORM 665 ATTACHED

OFFICE RII:DRS RII:DRP RII:DRS

SIGNATURE

  • DJB4 for MES4
  • DWR1 BRB1

NAME M. Speck D. Rich B. Bonser

DATE 12/ 20 /2012 1/ 2 /2013 1/ 15 /2013

E-MAIL COPY YES NO YES NO YES NO

Letter to Jon from Brian R. Bonser dated January 16, 2013.

SUBJECT: CRYSTAL RIVER UNIT 3 NUCLEAR GENERATING PLANT - U.S. NUCLEAR REGULATORY COMMISSION EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT NO. 05000302/2012501

DISTRIBUTION:

D. Rich, RII, DRP S. Sandal, RII, SR, PE M. Riches, RII, PE P. Carman, RII, RIDP T. Morrissey, RII, SRI N. Childs, RII, RI C. Evans, RII EICS L. Douglas, RII EICS RIDSNRRDIRS PUBLIC RidsNrrPMCrystal River Resource