IR 05000302/2011402

From kanterella
Jump to navigation Jump to search
IR 05000302-11-402, October 3, 2011 - October 6, 2011, Crystal River, Security Inspection Report (Cover Letter)
ML120050554
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 01/04/2012
From: Binoy Desai
NRC/RGN-II/DRS/PSB2
To: Franke J
Progress Energy Florida
References
IR-11-402
Download: ML120050554 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION ary 4, 2012

SUBJECT:

CRYSTAL RIVER NUCLEAR PLANT- NRC SECURITY INSPECTION REPORT 05000302/2011402

Dear Mr. Franke:

On December 8, 2011, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Crystal River Nuclear Plant. Portions of the inspection associated with the Protective Strategy were completed during the on-site Force on Force preparatory inspection that was conducted October 3, 2011, through October 6, 2011. The inspection covered one or more of the key attributes of the security cornerstone of the NRCs Reactor Oversight Process. The enclosed Inspection Report documents the inspection results, which were discussed on December 8, 2011, with Mr. T. Hobbs and other members of your staff.

The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations, and with the conditions of your license. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.

This report documents one NRC identified finding of very low security significance (i.e., Green as determined by the Physical Protection Significance Determination Process). The deficiencies were corrected or compensated for, and the plant was in compliance with applicable physical protection and security requirements within the scope of this inspection before the inspectors left the site. The inspector determined that since this finding is not reflective of current plant performance, no aspect in the cross cutting areas was identified.

Additionally, one licensee-identified violation which was determined to be of very low safety significance is listed in this report. However, because of the very low safety significance and because these issues are entered into your corrective action program, the NRC is treating these violations as non-cited violations consistent with Section 2.3.2 of the NRC Enforcement Policy in accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system, ADAMS. ADAMS is PROGRESS ENERGY 2 accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

If you contest these non-cited violations, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, D.C. 20555-0001; with copies to the Regional Administrator Region II; the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, D.C. 20555-0001; and the NRC Resident Inspector at Crystal River Nuclear Plant.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system, ADAMS.

ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection.

In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRCs document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response Security-Related Information-Withhold Under 10 CFR 2.390 and follow the instructions for withholding in 10 CFR 2.390(b)(1).

Sincerely,

/RA/

Binoy B. Desai, Chief Plant Support Branch 2 Division of Reactor Safety Docket No.: 50-302 License No.: DPR-72 Enclosure:

Inspection Report 05000302/2011402 w/Att.: Supplemental Information (OUO)

cc w/encl.: (See page 3) ML120050554 X SUNSI REVIEW COMPLETE X FORM 665 ATTACHED OFFICE RII:DRS/PSB2 RII:DRS/PSB2 RII: DRS/PSB2 RII: DRS/PSB2 RII: DRP/BR3 SIGNATURE RA/ICH RA/BBD ForJCS3 RA/AXT9 RA/BBD RA/DWR1 NAME I. Hall J. Shehee A. True B. Desai D. Rich DATE 01/03/2012 01/04/2012 01/03/2012 01/04/2012 01/03/2012 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO PROGRESS ENERGY 3 cc w/Encl:

cc w/Inspection Summary:

Jon Vice President Edward T. O'Neil Crystal River Nuclear Plant (NA2C) Director Nuclear Protective Serv and 15760 West Power Line Street Emergency Preparedness Crystal River, FL 34428-6708 Progress Energy TPP-15 Jeffrey R. Swartz 100 East Davie Street Director Site Operations Raleigh, NC 27601 Crystal River Nuclear Plant 15760 West Power Line Street Matthew Widener Crystal River, FL 34428-6708 Manager Nuclear Security Crystal River Nuclear Plant (Acting) Plant General Manager 15760 West Power Line Street Crystal River Nuclear Plant (NA2C) Crystal River, FL 34428-6708 15760 W. Power Line Street Crystal River, FL 34428-6708 Mark Rigsby Manager, Support Services - Nuclear Crystal River Nuclear Plant (NA2C)

15760 W. Power Line Street Crystal River, FL 34428-6708 Daniel R. Westcott Supervisor Licensing & Regulatory Programs Crystal River Nuclear Plant (NA1B)

15760 W. Power Line Street Crystal River, FL 34428-6708 Joseph W. Donahue Vice President Nuclear Oversight Progress Energy TPP-15 100 E. Davie Street Raleigh, NC 27601 Kelvin Henderson General Manager Nuclear Fleet Operations Progress Energy TPP-15 100 E. Davie Street Raleigh, NC 27601 PROGRESS ENERGY 4 Letter to Jon from B. Desai dated January 4, 2012.

SUBJECT: CRYSTAL RIVER NUCLEAR PLANT- NRC SECURITY INSPECTION REPORT 05000302/2011402 Distribution w/encl:

RidsNrrPMCrystal River Resource C. Evans, RII EICS (Part 72 Only)

L. Douglas, RII EICS (Linda Douglas)

B. Westreich, NSIR (hard copy w/ encl)

S. Coker, NSIR R. Albert, NSIR RIDSNRRDIRS OE Mail (email address if applicable)

PUBLIC (OUO REMOVED)