ber 23, 2011

SUBJECT:

CRYSTAL RIVER NUCLEAR GENERATING PLANT, UNIT 3 - NRC SECURITY BASELINE INSPECTION REPORT 05000302/2011201

Dear Mr. Franke:

On November 3, 2011, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Crystal River Nuclear Generating Plant, Unit 3. The inspection covered one or more of the key attributes of the security cornerstone of the NRCs Reactor Oversight Process. The enclosed inspection report documents the inspection results which were discussed via telephone on November 10, 2011, with you, and other members of your staff.

The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license.

The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.

No findings were identified during this inspection.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC's

"Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

The material enclosed herewith contains Safeguards Information as defined by 10 CFR 73.21 and its disclosure to unauthorized individuals is prohibited by Section 147 of the Atomic Energy Act of 1954, as amended. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from NRCs document system (ADAMS), accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21.

Otherwise if Security-Related Information is necessary to provide an acceptable response, please mark your entire response Security-Related Information in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding under 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.960(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.

Should you have any questions concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

/RA D. Cardenas for/

Robert C. Johnson, Chief Security Performance Evaluation Branch Division of Security Operations Office of Nuclear Security and Incident Response Docket No.: 50-302 License No: DPR-72 Nonpublic Enclosure: Inspection Report 05000302 w/Attachment: Supplemental Information cc w/ encl: M. Widner, Crystal River Nuclear Generating Plant, Unit 3 cc w/o encl: