ML20054G793
| ML20054G793 | |
| Person / Time | |
|---|---|
| Site: | Pilgrim |
| Issue date: | 06/04/1982 |
| From: | Martin T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Harrington W BOSTON EDISON CO. |
| Shared Package | |
| ML20054G794 | List: |
| References | |
| NUDOCS 8206220306 | |
| Download: ML20054G793 (3) | |
See also: IR 05000293/1982015
Text
C V- t </ - f.,L
ENCLOSURES TRANSMITTED HETIMIM
-
.
CONTAIN 10 CFR 2.790 INFORMATION
.
.
.
4 JUN
Docket No. 50-293
Boston Edison Company M/C Nuclear
ATTN: Mr. William D. Harrington
Senior Vice President, Nuclear
25 Braintree Hill Office Park
Braintree, MA 02184
Gentlemen:
Subject:
Inspection No. 50-293/82-15
This refers to the routine safeguards inspection conducted by Mr. I. Cohen of
this office on May 11-12, 1982 at Pilgrim Nuclear Power Station, Plymouth,
Massachusetts of activities authorized by NRC License No. DPR-35 and to the
discussions of our findings held by Mr. Cohen with Mr. R. D. Machon of your
staff at the conclusion of the inspection.
Areas examined during this inspection are described in the NRC Region I Inspection
Report which is enclosed with this letter. Within these areas, the inspection
consisted of selective examinations of procedures and representative records,
interviews with personnel, and observations by the inspector.
Within the scope of this inspection, no violations were observed.
In accordance with Section 2.790(d) of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, documentation of findings of your control
and accounting procedures for safeguarding special nuclear materials is deemed
to be commercial or financial information within the meaning of 10 CFR 9.5(a)(4)
and shall be subject to disclosure only in accordance with the provisions of 10 CFR 9.12; therefore, except for the report cover sheet, the enclosed inspection
report will not be placed in the Public Document Room and will receive limited
distribution.
No reply to this letter is required.
Your cooperation with us in this matter is
appreciated.
Sincerely,
1--
=a
Thomas T. Martin, Director
Division of Engineering and Technical
Programs
Enclosure: NRC Region I Inspection Report Number 50-293/82-15 (Contains
2.790 Information)
0FFICIAL RECORD COPY
l
8206220306 820604
PDR ADOCK 05000293
0
rc ~
- wNWITTED HERERTH
>
-" ATICM
ccQ
-
CC w,
,) e
-
l
ENCLOSURES TRANSMITTED HERa'/ITH
-
-
CONTAIN 10 CFR 2.790 INFORh'.ATICM
.
,
Boston Edison Company
2
-
cc:
A. V. Morisi, Manager, Nuclear Operations Support (w/ copy of report cover
sheet only)
R. D. Machon, Nuclear Operations Manager - Pilgrim Station (w/ copy of cover
sheet only)
Public Document Room (PDR) (w/ copy of report cover sheet only)
local Public Document Room (LPDR) (w/ copy of cover sheet only)
Nuclear Safety Information Center (NSIC) (w/ copy of cover sheet only)
NRC Resident Inspector (w/ copy of enclosure)
Commonwealth of Massachusetts (2) (w/ copy of report cover sheet only)
bec w/ encl:
Region I Docket Room (with concurrences)
Chief, Operational Support Section (w/o encis)
Director, DPRP (w/ copy of report cover sheet only)
[
WhgA
g
RI:DETP
RI:DiT / /
.nc-
Cohen /pja
Joyner
M t
6/01/82
[
OFFICIAL RECORD COPY
ENCLOSURES TRANSMITTED MEPC'llTH
CONTAIN 10 CFR 2.790 INFORMATION