ML20054G793

From kanterella
Jump to navigation Jump to search
Forwards IE Safeguards Insp Rept 50-293/82-15 on 820511-12. No Noncompliance Noted
ML20054G793
Person / Time
Site: Pilgrim
Issue date: 06/04/1982
From: Martin T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Harrington W
BOSTON EDISON CO.
Shared Package
ML20054G794 List:
References
NUDOCS 8206220306
Download: ML20054G793 (3)


See also: IR 05000293/1982015

Text

C V- t </ - f.,L

- . ENCLOSURES TRANSMITTED HETIMIM

.

. CONTAIN 10 CFR 2.790 INFORMATION

.

4 JUN

Docket No. 50-293

Boston Edison Company M/C Nuclear

ATTN: Mr. William D. Harrington

Senior Vice President, Nuclear

25 Braintree Hill Office Park

Braintree, MA 02184

Gentlemen:

Subject: Inspection No. 50-293/82-15

This refers to the routine safeguards inspection conducted by Mr. I. Cohen of

this office on May 11-12, 1982 at Pilgrim Nuclear Power Station, Plymouth,

Massachusetts of activities authorized by NRC License No. DPR-35 and to the

discussions of our findings held by Mr. Cohen with Mr. R. D. Machon of your

staff at the conclusion of the inspection.

Areas examined during this inspection are described in the NRC Region I Inspection

Report which is enclosed with this letter. Within these areas, the inspection

consisted of selective examinations of procedures and representative records,

interviews with personnel, and observations by the inspector.

Within the scope of this inspection, no violations were observed.

In accordance with Section 2.790(d) of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, documentation of findings of your control

and accounting procedures for safeguarding special nuclear materials is deemed

to be commercial or financial information within the meaning of 10 CFR 9.5(a)(4)

and shall be subject to disclosure only in accordance with the provisions of 10

CFR 9.12; therefore, except for the report cover sheet, the enclosed inspection

report will not be placed in the Public Document Room and will receive limited

distribution.

No reply to this letter is required. Your cooperation with us in this matter is

appreciated.

Sincerely,

1-- =a

Thomas T. Martin, Director

Division of Engineering and Technical

Programs

Enclosure: NRC Region I Inspection Report Number 50-293/82-15 (Contains

2.790 Information)

0FFICIAL RECORD COPY

l

8206220306 820604

PDR ADOCK 05000293

0

>

PDR rc ~

-

- wNWITTED HERERTH

-" ATICM

CC w, - ,) eccQ

l

- -

ENCLOSURES TRANSMITTED HERa'/ITH

,

.

CONTAIN 10 CFR 2.790 INFORh'.ATICM

Boston Edison Company 2 -

cc:

A. V. Morisi, Manager, Nuclear Operations Support (w/ copy of report cover

sheet only)

R. D. Machon, Nuclear Operations Manager - Pilgrim Station (w/ copy of cover

sheet only)

Public Document Room (PDR) (w/ copy of report cover sheet only)

local Public Document Room (LPDR) (w/ copy of cover sheet only)

Nuclear Safety Information Center (NSIC) (w/ copy of cover sheet only)

NRC Resident Inspector (w/ copy of enclosure)

Commonwealth of Massachusetts (2) (w/ copy of report cover sheet only)

bec w/ encl:

Region I Docket Room (with concurrences)

Chief, Operational Support Section (w/o encis)

Director, DPRP (w/ copy of report cover sheet only)

[ WhgA

RI:DETP RI:DiT / / .nc- g

Cohen /pja Joyner M t

6/01/82

[ OFFICIAL RECORD COPY

ENCLOSURES TRANSMITTED MEPC'llTH

CONTAIN 10 CFR 2.790 INFORMATION