e UNITED STATES.
NUCLEAR REGULATORY COMMISSION REGION 11 101 MARIETTA STREET, ATLANTA< GEORGIA 30323 ENCLOSURE 1 EXAMINATION REPORT - 50-280/92-302 Facility Licensee:
Virginia Electric and Power Company Facility Name:
Surry Nuclear Power Station Facility Docket No~.:. 50-280 and 50~281 An initial retake examination administered at Surry Nuclear Station near
_Surry~ V Ch_i ef Examiner:
Approved By: *
SCOPE:
1. Lawyer, Chief Licen~ing Section 1 of Reactor Safety SUMMARY An initial retake (simulator only) ~xaminat~on was administered on
~eptember 2i, 1992, for one individual who failed the Operations portion of the initial examination given. during the week of Marth 16, 1992. *
.
.
RESULTS:
The candidate passed the examination.
. 9211180249 921106 PDR*
ADOCK 05000280 V
REPORT DETAILS Persons Contacted
. Licensee EmpJ oyees
.*L. Baker, Senior Instructor, Nuclear
.*A. Brown, Supervisor Nuclear Training
- B. DeLamorton, Supervisor, Nuclear Training {Simulator).
- R. Dickey, Senior Instructor, Nuclear
- A. Friedman, Superintendent, Nuclear Training*
- L. Gardner, Lead Simulator Instructor
- L. Girvin, Vice President, Nuclear Services
- J. Grau, Senior Nuclear Instructor
- L. Huskey, Administr~tive Assistant
- W. Krehely, Seni.or Instructor, Nuclear
- H. Mccallum, Operations Coordinator, Training
- J. McCarthy, Superi~tendent, Operations
- D. Modlin, Shift Supervisor
- A. Price, Assistant Station Manager
,
- R: Sanders, Assista~t Vice President Nuclear Operations
- J. Spence, Senior Instructor*
- T. Williams, Manager Nucleaf Training
- Attended exit-Examiners
.
'
R. Aiello, NRC, Region II, Chief Examiner E. Lea, N~C, Region II W. Steinke,. INEL Other NRC P~rsonnel Attending Exit T. Liu,.RII*
M. Branch, Surry SRI * Exit Meeting:
At the conclusion of the site visit, the examiners met with representa-tives of the plant staff indicated in paragraph 1, to discoss-the results of the examinations and inspection findings. This. exit was conducted in conjunction with the requalification examination exit that was given during ~he week of October 5, 199 The examiners further
- . described the areas in~pected and discussed in deiail. the inspettion findings listed i~ r~port 50-280/92-30 *
The licensee did not identify any of the material provided to or reviewed by the examiners as proprietar i Facility Licensee:
Facility Docket Nos.:
ENCLOSURE 2 SIMULATOR FACILITY REPORT Surry Nuclear Station 50-280 and 50-281 Operating Test Administered During:
The Week of September 28, 1992 This form is used only to report observations. These observations do not constitute, in and_of themselves, audit or inspection findings and are not, without further verification and review, indicative of noncompliance with 10 CFR 55.45(b). These observations do not ~ffect NRC certification or approval of the simulation facility other than to provide information which may be used in future evaluation No licensee action is required solely in response to thes~ observation During the conduct of the simulator portto~ of the operating test, no simulator fidelity items were identified.