IR 05000280/1982030

From kanterella
Jump to navigation Jump to search
IE Safeguards Insp Repts 50-280/82-30 & 50-281/82-30 on 821102-05.No Noncompliance Noted.Major Areas Inspected: Records & Repts,Testing & Maint,Locks,Keys & Combinations. Details Withheld (Ref 10CFR73.21)
ML20028A998
Person / Time
Site: Surry  Dominion icon.png
Issue date: 11/23/1982
From: Mcguire D, Tillman A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20028A994 List:
References
50-280-82-30, 50-281-82-30, NUDOCS 8211290296
Download: ML20028A998 (1)


Text

g "'49 UNITED STATES

<

(

A NUCLEAR REGULATORY COMMISSION c

O, REGION 11

,

n

~

,

f E

toi wasTTA si N.W SUITE 3100

"e

'*

-

ATLANTA. osono A sosoa

,

'A....+/

NOV24 lod 2

'

-

,

, Report Nos. 50-280/82-30 and 50-281/82-30 Docket Nos. 50-280 and 50-281 License Nos. DPR-32 and DPR-37 Licensee: Virginia Electric and Power Company Richmond, VA 23262 Facility Name: Surry 1 and 2 Inspection at: Surry Site, near Surry, VA

.

Inspection conducted: November 2-5, 1982 Date of Last Physical Security Inspection Visit: August 16-20, 1982 Type of Inspectio - U nnounced Physical Security Inspector:

// h/

jfdj/h ll

$

S A. Ti'llmad, Physf}al' ShMrYty Inspector Da'te Signed Approved M

Il b

g/ U.YHcGu' ire, Chief, Physical Protection Section Dfte Signed Technical Inspection Branch Division of Engineering and Technical Programs Inspection Summary Areas Inspected:

Included review of Security Plan and Implementing Procedures; Security Organization-Management; Security Organization-Personnel; Security Organization-Response; Security Program Audit; Records and Reports; Testing and Maintenance, Locks, Keys, and Combinations; Physical Barriers-Protected Area; Physical Barrier-Vital Areas; Security System Power Supply; Lighting; Assessment Aids; Access Control-Personnel; Access Control-Packages; Access Control-Vehicles; Detection Aids-Protected Area; Detection Aids-Vital Areas; Alarm Stations; Communications; General Requirements for Personnel; Additional Requirements for Power Reactor and Fixed Site Personnel; and Safeguards Contingency Plan Implementation Review.

The inspection involved 31 inspector hours on site by one NRC inspector. Four inspection hours were accomplished during offshift periods.

Results:

The licensee was found to be in compliance with NRC requirements within the 23 areas examined during the inspection.

E nO5g coNTAINS '

SAFE.GU;UIDs INFO?XATION.

~

WOU SE ARATIONIH 8211290296 821124 PAGE IS DECONTE

-

PDR ADOCK 05000280 O

PDR

'.

..

..