Forwards Insp Repts 50-275/96-10 & 50-323/96-10 on 960415-25.No Violations Noted
ML16343A377
Person / Time
Site: Diablo Canyon  
Issue date: 05/17/1996
From: Gwynn T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Rueger G
PACIFIC GAS & ELECTRIC CO.
Shared Package
ML16342D296 List:
References
NUDOCS 9605210483
Download: ML16343A377 (10)


Text

~p,R REGS Wp.

+

~ ~i 0O o

~**<<~

UN IT E0 STATES NUCLEAR REGULATORY COMMISSION

REGION IV

611 RYAN PLAZA DRIVE, SUITE 400 ARLINGTON,TEXAS 76011 8064 VAV ~7 l996 Pacific Gas and Electric Company Nuclear Power Generation.

B14A ATTN:

Gregory M. Rueger.

Senior Vice President and General Manager Nuclear Power Generation Bus. Unit 77 Beale Streets Room '1451 P.O.

Box 770000 San Francisco.

California 94177 SUBJECT:

NRC INSPECTION REPORT 50-275/96-10:

50-323/96-10 This refers to the inspection conducted by Mr. Claude E. Johnson of this office on April 15-25.

1996. at the Diablo Canyon Nuclear Power Plant.

Units

and 2. facility.

The purpose of the inspection was to determine whether activities authorized by the license were conducted safely and in accordance with NRC requirements.

At the conclusion of the inspections the findings were discussed with those members of your staff identified in the enclosed report.

Areas examined during the inspection are identified in the report.

Within these areas.

the inspection consisted of selective examinations of procedures and representative records'nterviews with personnel.

and observation of activities in progress.

The results of this inspection are documented in the enclosed report.

In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice,"

a copy of this letter and its enclosures will be placed in the NRC Public Document Room.

Should you have any questions concerning this inspection.

we will be pleased to discuss them with you.

Sincerely

.

Dockets:

50-275 50-323 Licenses:

DPR-80 DPR'-82 Th as P.

Gwynn, Dir tor Division of Rea'o fet

'7605210483 960517 PDR ADOCK 05000275

PDR

A L'

Pacific Gas and Electric Company-2-Enclosure:

NRC Inspection Report 50-275/96-10:

50-323/96-10 w/attachments cc w/enclosure:

Sierra Club California ATTN:

Dr. Richard Ferguson Energy Chair 1100 11th Street.

Suit~ 311 Sacramento, California 95814 San Luis Obispo Mothers for Peace ATTN:

Hs.

Nancy Culver P.O.

Box 164 Pismo Beach. California 93448 Hs. Jacquelyn C. Wheeler P.O.

Box 164 Pismo Beach'alifornia 93448 The County Telegram Tribune ATTN:

Managing Editor 1321 Johnson Avenue P.O.

Box 112 San Luis Obispo, California 93406 San Luis Obispo County Board of Supervisors ATTN: -Chairman Room 370'ounty Government Center San Luis Obispo. California 93408 California Public Utilities Commission ATTN:

Mr. Truman BurnsNMr. Robert Kinosian 505 Van Ness, Rm.

4102 San Francisco, Cali fornia 94102 Diablo Canyon Independent Safety Committee Attn:

Robert R. Wellington.

Esq.

Legal Counsel 857 Cass Street.

Suite D

Monterey, California 93940

lf

V h

I

Pacific Gas and Electric Company-3-Radiologic Meal th Branch State Department of Health Services ATTN:

Mr. Steve Hsu P.O.

Box 942732 Sacramento.

California 94234 State of California ATTN:

Hr. Peter H. Kaufman Deputy Attorney General 110 West A Streets Suite 700 San Diego. California 92101 Pacific Gas and Electric Company ATTN:

Christopher J.

Warner.

Esq.

P.O.

Box 7442 San Francisco.

California 94120 Pacific Gas and'lectric Company Diablo Canyon Power Plant

'ATTN:

Warren H. Fujimoto. Vice President and Plant Hanager P.O.

Box 56 Avila Beach. California 93424 E

L1 I

/'

Pacific Gas and Electric Company-4-E-Hail report to D. Nelson (DJN)

E-Hail report to NRR Event Tracking System (IPAS)

E-Mail report to H. Davis (MJD1)

bcc to DMB (IE01)

bcc distrib.

by RIV:

L. J. Callan DRP Director Branch Chief (DRP/E, WCFO)

Senior Project Inspector (DRP/E, WCFO)

Branch Chief (DRP/TSS)

Leah Tremper (OC/LFDCB, HS:

TWFN 9E10)

Resident Inspector DRS-PSB HIS System RIV File H.

Hammond (PAO, WCFO)

DOCUMENT NAME:

R:K DCKDC610rp.cej To receive copy of document, Indicate in box: "C" = Copy without enctosures

"E" = Copy with enclosures "N" = No copy RIV:RI: MB CEJohnson 05/

/96 C:MB DAPower 05/c

/96 D:DRS TPGw n

05/ S/96 C:PBE HWon 05/l /9 D:DRS TPGw nn 05/

/96

<<0

~

~

I 4 "10<<EJV tf '.'Fk)1048'l.

'

Pacific Gas and Electric Company-4-E-Mail report to D. Nelson (DJN)

E-Mail report to NRR Event Tracking System ( IPAS)

E-Mail report to M. Davis (MJDl)

pe!Kfoa0f824E01') x '.y>~f bcc distrib.

by RIV:

L. J. Callan DRP Director Branch Chief (DRP/ED WCFO)

Senior Project Inspector (DRP/E, WCFO)

Branch Chief (DRP/TSS)

Leah Tremper (OC/LFDCB, MS:

TWFN 9E10)

Resident Inspector DRS-PSB MIS System RIV File M.

Hammond (PAO, WCFO)

DOCUMENT NAME:

R:~ DCNDC610rp.cej To receive copy of document, indicate in box: "C" = Copy without enclosures

"E" = Copy with enclosures "N" = No copy RIV:RI: MB CEJohnson 05/

/96 C:MB DAPower 05/c

/96 D:DRS TPGw n

05/ 4/96 C:PBE HWon 05/I /9 D:DRS TPGw nn 05/i /96 2l0013