Forwards Insp Repts 50-275/96-03 & 50-323/96-03 on 960226-0301 & 0408-12.No Violations Noted
ML16343A378
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 05/21/1996
From: Gwynn T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Rueger G
PACIFIC GAS & ELECTRIC CO.
Shared Package
ML16342D302 List:
References
NUDOCS 9605280116
Download: ML16343A378 (10)


Text

e f

~p,g REQg Wp

+

+1*t+

UNITED STATES NUCLEAR REGULATORY COMMISSION

REGION IV

611 RYAN PLAZA DRIVE, SUITE 400 ARLINGTON,TEXAS 76011 8064 MAY 2 l 896 Pacific Gas and Electric Company Nuclear Power Generation

~

B14A ATTN:

Gregory M. Rueger.

Senior Vice President and General Manager Nuclear Power Generation Bus. Unit 77 Beale Street.

Room 1451 P.O.

Box 770000 San Francisco, California 94177 SUBJECT:

NRC INSPECTION REPORT 50-275/96-03:

50-323/96-03 This refers to the inspection conducted by Messrs.

P.

Gage and W. McNeill of this office on February 26 through March 1.

and April 8-12, 1996. at the Diablo Canyon Nuclear Power Plant.

Units 1 and

~ facility.

The purpose of the inspection was to determine whether activities authorized by the license were conducted safely and in accordance with NRC requirements.

At the conclusion of the inspection.

the findings were discussed with you and those members of your staff identified in the enclosed report.

Areas examined during the inspection are identified in the report.

Within these areas.

the inspection consisted of selective examinations of procedures and representative records'nterviews with personnel, and observation of activities in progress.

The purpose of this inspection was to determine the effectiveness of your self assessment of the engineering and corrective action programs.

Your self assessment concluded that you had implemented effective engineering and corrective action programs.

Our independent inspection of your self-assessment process confirmed this conclusion.

We were particularly impressed by the self-critical findings of your team which shoi'.d contribute to improved engineering performance.

Therefore.

in accordance with NRC Inspection Procedure 40501.

"Licensee Self Assessments Related to Team Inspections'

" the NRC plans no further inspection effort at the Diablo Canyon Nuclear Power Plant for NRC Inspection Procedure 37550 during the current Systematic Assessment of Licensee Performance Cycle.

In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice,"

a copy of this letter and its enclosures will be placed in the NRC Public Document Room.

9605280116 960521 PDR ADOCK 05000275

PDR

Pacific Gas and Electric Company-2-Should you have any questions concerning this inspection.

we will be pleased to discuss them with you.

Dockets:

50-275 50-323 Licenses:

DPR-80 DPR-82 Enclosure:

NRC inspection Report 50-275/96-03:

50-323/96-03 w/attachment cc w/enclosure:

Sierra Club California ATTN:

Dr. Richard Ferguson Energy Chair 1100 11th Street.

Suite 311 Sacramento.

California 95814 San Luis Obispo Mothers for Peace ATTN:

Ms.

Nancy Culver P.O.

Box 164 Pismo Beach. California 93448 Ms. Jacquelyn C. Wheeler P.O.

Box 164 Pismo Beach'alifornia 93448 The County Telegram Tribune ATTN:

Managing Editor 1321 Johnson Avenue P.O.

Box 112 San Luis Obispo. California 93406 San Luis Obispo County Board of Supervisors ATTN:

Chairman Room 370 County Government Center San Luis Obispo. California 93408 Thomas P.

Gwynn D rect r Division of Rea r Saf

Pacific Gas and Electric Company-3-California Public Utilities Commission ATTN:

Mr. Truman BurnshMr. Robert Kinosian 505 Van Ness'm.

4102 San Francisco.

California 94102 Diablo Canyon Independent Safety Committee Attn:

Robert R. Wellington.

Esq.

Legal Counsel 857 Cass Street.

Suite D

Monterey. California 93940 Radiologic Health Branch State Department of Health Services ATTN:

Mr. Steve Hsu P.O.

Box 942732 Sacramento.

California 94234 State of California ATTN; Mr. Peter H.

Kaufman Deputy Attorney General 110 West A Streets Suite 700 San Diego. California 92101 Pacific Gas and Electric Company ATTN:

Christopher J.

Warner.

Esq.

P.O.

Box 7442 San Francisco, California 94120 Pacific Gas and Electric Company Diablo Canyon Power Plant ATTN:

Warren H. Fujimoto. Vice President and Plant Manager P.O.

Box 56 Avila Beach, California 93424

Pacific Gas and Electric Company-4 E-Hail report to D. Nelson (DJN)

E-Hail report to NRR Event Tracking System (IPAS)

bcc to DHB (IE01)

bcc distrib.

by RIV:

L. J. Callan DRP Director Branch Chief (DRP/E.

~.'"FO)

Senior Project Inspector (DRP/E, WCFO)

Branch Chief (DRP/TSS)

Leah Tremper (OC/LFDCB, HS:

TWFN 9E10)

Resident Inspector DRS-PSB HIS System RIV File H.

Hammond (PAO, WCFO)

DOCUHENT NAHE:

R:X DCXDC603RP.PCG To receive copy of document, indicate in box: "C" = Copy without enclosures

"E" = Copy with enctosures "N" = No copy RI: EB PCGa e

RI:EB WMHcNeill C:EB

<

D:DRS AVa 5 r h TPGw nn C:PBE:DRS HJWon 05/H/96 D:DRS TPGw nn

/96 05/~ /96 05/

/96 05/

05/

/96 AL 05/

/96 05/

/96 PY 05/ 0/96 05/

/96

Pacific Gas and Electric Company E-Mail report to D. Nelson (DJN)

E-Hail report to NRR Event Tracking System (IPAS)

bcc to DMB (IE01)

bcc distrib. by RIV:

L. J. Callan DRP Director Branch Chief (DRP/E, WCFO)

Senior Project Inspector (DRP/E, WCFO)

Branch Chief (DRP/TSS)

Leah Tremper (OC/LFDCB.

MS:

TWFN 9E10)

Resident Inspector DRS-PSB HIS System RIV File H.

Hammond (PAO, WCFO)

DOCUMENT NAME:

R:N DCNDC603RP.PCG To receive copy of document, Indicate in box: "C" = Copy without enclosures

"E" = Copy with enciosures "N" = No copy RI: EB PCGa e

05//'//96 D:DRS TPGw nn

/96 RI: EB WHMcNei 11 05/P /96 05/

/96 05/"

05/

/96 05/

/96 05/

/96 C:EB

<

D:DRS AVa r h TPGw nn C:PBE:DRS HJWon 05/90/96 05/

/96