February 26, 1997

SUBJECT:

NRC INSPECTION REPORT 50-275/96024; 50-323/96024 AND NOTICE OF VIOLATION

Dear Mr. Rueger:

On December 22, 1996, through February 1, 1997, the NRC completed an inspection at your Diablo Canyon Nuclear Power Plant, Units 1 and 2 reactor facilities. The enclosed report presents the scope and results of that inspection.

During the inspection period your conduct of activities at the Diablo Canyon Facility was generally characterized by safety-conscious operations and good maintenance and engineering practices; however, two violations were identified.

The first involves the failure to perform a written safety evaluation prior to changing reactor protection trip setpoints.

Although a formal review was performed, all of the specific attributes required by 10 CFR 50.59 were not considered.

'The second violation involves the failure to follow the process established by procedure for. the revision of design criteria memoranda.

The violations are cited in the enclosed Notice of Violation (Notice) and the circumstances surrounding these violations are described in detail in the enclosed report.

Please note that you are required to respond to this letter and should follow the instructions specified in the enclosed Notice when preparing your response.

The NRC will use your response, in part, to determine whether further enforcement action is necessary to 'ensure compliance with regulatory requirements.

In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice,"

a copy of this, letter, its enclosures, and your response will be placed in the NRC Public Document Room (PDR).

To the extent possible, your response should not include any personal privacy, proprietary, or safeguards information so that it can be placed in the PDR without redaction.

97031.a0007 970aae PDR ADQCK 05000275

PDR IHltltlHlllltt8llHlllllHIlll!llHEllllllll

Oi

Pacific Gas and Electric Comiiany-2-Should you have any questions concerning this inspection, we will be pleased to discuss them with you.

Sincerely, Arthur T. Howell III, Acting Director Division of Reactor Projects Dockets:

50-275 50-323 Licenses:

DPR-80 DPR-82 Enclosures:

1.

Notice of Violation 2.

NRC Inspection Report 50-275/96024; 50-323/96024 cc w/enclosures:

Dr. Richard Ferguson-Eriergy Chair Sierra Club California 1100 lith Street, Suite 311 Sacramento, California 95814 Ms. Nancy Culver San Luis Obispo Mothers for Peace'.O.

Box 164 Pismo Beach, California 93448 Chairman San Luis Obispo County Board of Supervisors Room 370 County Government Center San Luis Obispo, California 93408 Mr. Truman Burns>Mr. Robert Kinosian California Public Utilities Commission 505 Van Ness, Rm. 4102 San Francisco, California 94102

Pacific Gas and Electric Company-3-Robert R. Wellington, Esq.

Legal Counsel Diablo Canyon Independent Safety Committee 857 Cass Street, Suite D Monterey, California 93940 Mr. Steve Hsu Radiologic Health Branch State Department of Health Services P.O. Box 942732, Sacramento, California 94234 Christopher J. Warner, Esq.

Pacific Gas and Electric Company P.O. Box 7442 San Francisco, California 94120 Robert P. Powers, Vice President and Plant Manager Diablo Canyon Power Plant P.O. Box 56 Avila Beach, California 93424 Managing Editor Telegram-Tribune 1321 Johnson Avenue P.O. Box 112 San Luis Obispo, California 93406

Pacific Gas and Electric Company-4-E-Mail report to T. Boyce (THB)

E-Mail report to NRR Event Tracking System (IPAS)

E-Mail report to Document Control Desk (DOCDESK)

bcc to DCD (IE01)

bcc distrib. by RIV:

Regional Administrator.

DRP Director Branch Chief (DRP/E, WCFO)

Senior Project Inspector (DRP/E, WCFO)

Branch Chief (DRP/TSS)

Leah Tremper (OC/LFDCB, MS: TWFN 9E10)

Resident Inspector DRS-PSB MIS System RIV File IVI. Hammond (PAO, WCFO)

'CFO File DOCUMENT NAME: R:i DcttDC624RP.MDT To receive copy of document, indicate ln box: "C" = Copy without enclosures

"E" = Copy with enclosures "N" = No copy RIV:RI:DRP/E C:DRP/E D:WCFO 02+$ 97 02~7 MDTschiltz / y~

HJWong KEPerkins gP 02~97 OFFICIAL RECORD COPY

0,

r Pacific Gas and Electric Company-4-E-Mail report to T. Boyce (THB)

E-Mail report to NRR Event Tracking System (IPAS)

E-Mail report to Document Control Desk (DOCDESK)

bcc to DCD (IE01)

bcc distrib. by RIV:,

Regional Administrator DRP Director Branch Chief (DRP/E, WCFO)

Senior Project Inspector (DRP/E, WCFO)

Branch Chief (DRP/TSS)

Leah Tremper (OC/LFDCB, MS: TWFN 9E10)

Resident Inspector DRS-PSB MIS System

'IVFile M. Hammond (PAO, WCFO)

WCFO File DOCUMENT NAME: R;i DciDC624RP.MDT To receive copy of document, Indicate in box: "C" = Copy without enclosures

"E" = Copy with enclosures "N" = No copy RIV:RI: DR P/E C:DRP/E D:WCFO MDTschiltz / y~

02~7 HJWong ~

02+$ 97 KEPerkins gP 02+97 OFFICIAL RECORD COPY