Forwards Insp Repts 50-275/96-08 & 50-323/96-08 on 960603-07.No Violations Noted.Minor Concerns Identified in Areas of Radioactive Waste Container Storage QA Overview of Radioactive Matl Transportation
ML16343A406
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 07/10/1996
From: Gwynn T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Rueger G
PACIFIC GAS & ELECTRIC CO.
Shared Package
ML16342D364 List:
References
NUDOCS 9607160162
Download: ML16343A406 (10)


Text

go,R R<Cv(

j

)

0O

+**4+

UNITED STATES NUCLEAR REGULATORY COMMISSION

REGION IV

SUBJECT:

NRC INSPECTION REPORT 50-275/96-08; 50-323/96-08

Dear Mr. Rueger:

On June 3-7, 1996, the NRC completed two inspections at your Diablo Canyon Nuclear Power Plant, Units 1 and 2, reactor facilities.

One inspection focused on solid radioactive waste management and radioactive material/waste transportation activities.

The other inspection reviewed the water chemistry and radiochemistry programs.

The enclosed report presents the scope and results of those inspections.

In general.

our inspections found that all programs reviewed were properly implemented and satisfactorily performed.

Minor concerns were identified in the areas of radioactive waste container storage, quality assurance overview of radioactive material transportation activities, hazmat employee training, and chemistry control for source term reduction during Refueling Outage 1R7.

During the inspections, a concern was identified regarding the lack of a quality assurance, programmatic review of transportation activities during the most recent audit of solid radioactive waste management activities.

In your response to NRC Bulletin 79-19, dated December 6,

1979, you committed to the implementation of a management-controlled audit function of all transfer, packaging, and transport activities.

During the exit meeting conducted on June 7,

1996, Mr. Bill Crockett.

Nuclear Qual,ity Services Manager, committed that a programmatic review of transportation activities would be included in the 1996 quality. assurance audit of solid radioactive waste management activities.

Please confirm within 30 days of the date of this letter that our

=understanding of this commitment is correct.

In accordance with 10 CFR 2.790 of the,NRC's

"Rules of Practice,"

a copy of this letter and its enclosures will be placed in the NRC Public Document Room (PDR).

9607i60i62 960710 PDR ADOCK 05000275

PDR

Pacific Gas and Electric Company-2-Should you have any questions conc'erning this inspection, we will be pleased to discuss them with you.

Sincerely

.

Dockets:

50-275 50-323 Licenses:

DPR-80 DPR-82 Enclosure:

NRC Inspection Report 50-275/96-08; 50-323/96-08 cc w/enclosure:

Dr. Richard Ferguson Energy Chair Sierra Club California 1100 11th Street, Suite 311 Sacramento, Cali forni a 95814 Ms.

Nancy Culver San Luis Obispo Mothers for Peace P.O.

Box 164 Pismo Beach, California 93448 Ms. Jacquelyn C. Wheeler P.O.

Box 164 Pismo Beach, California 93448 Managing Editor The County Telegram Tribune 1321 Johnson Avenue P.O.

Box 112-San Luis Obispo. California 93406 Chairman San Luis Obispo County Board of Supervisors Room 370 County Government Center San Luis Obispo, California 93408

/

Thomas P.

Gwynn'i ect6r Division of Rea Sa

Pacific Gas and Electric Company-3-Mr. Truman BurnshMr. Robert Kinosian California Public Utilities Commission 505 Van Ness, Rm.

4102 San Francisco, California 94102 Robert R. Wellington.

Esq.

Legal Counsel Diablo Canyon Independent Safety Committee 857 Cass Street.

Suite D

Monterey, California 93940 Mr. Steve Hsu Radiologic Health Branch State Department of Health Services P.O.

Box 942732 Sacramento, California 94234 Peter H. Kaufman.

Deputy Attorney General State of California 110 West A Street, Suite 700.

San Diego. Cali fornia 92101 Christopher J.

Warner, Esq.

Pacific Gas and Electric Company P.O.

Box 7442 San Francisco, California 94120 Warren H. Fujimoto. Vice President and Plant Manager Pacific Gas and Electric Company Diablo Canyon Power Plant P.O.

Box 56 Avila Beach, California 93424

Pacific Gas and Electric Company E-Mail report to D. Nelson (DJN)

E-Hail report to NRR Event Tracking System (IPAS)

E-Mail report to H. Davis (MJD1) in the NRR Inspection. Program Branch (PIPB)

bcc to DHB ( IE06)

bcc distrib.

by RIV:

L. J. Callan DRP Director Branch Chief (DRP/E, WCFO)

Senior Project Inspector (DRP/E.

WCFO)

Branch Chief (DRP/TSS)

Leah Tremper (OC/LFDCB, HS:

TWFN 9E10)

L. T. Ricketson, PSB J.

B. Nicholas, PSB Resident Inspector DRS-PSB MIS System RIV File H.

Hammond (PAO, WCFO)

B. Hurray, PS6 DOCUMENT E:

G:%REPORTS 08RP.JBN To receive py f document, indicate n box "C" = Copy without enctosures

"E" -" Copy with enciosures "N" = No copy SRS: P BHurray LTRicket

cg JBNic N

SRS:P N

C:PSB

.

N D:D S N

PBE:DRP TP lynn HJWong I

gfEP i 07/V /96 07/0 /96 07/v~ /96

/9 07/'7/96 D:DRS TPGwynn 07/ 0/96

Pacific Gas and Electric Company-4-E-Hail report to D. Nelson (DJN)

E-Hail report to NRR Event Tracking System ( IPAS)

E-Hail report to H. Davis (MJD1) in the NRR Inspection Program Branch (PIPB)

bcc to DMB ( IE06)

bcc distrib.

by RIV:

L. J.

Ca 1 l an DRP Director Branch Chief (DRP/E, WCFO)

Senior Project Inspector (DRP/E, WCFO)

Branch Chief (DRP/TSS)

Leah Tremper (OC/LFDCB, MS:

TWFN 9E10)

L. T. Ricketson, PSB J.

B. Nicholas, PSB Resident Inspector DRS-PSB HIS System RIV File H.

Hammond (PAO, WCFO)

B. Hurray, P$ 6 DOCUMENT N E:

G:NREPORTS 08RP.JBN To receive py f document, indicate box "C" = Copy without enciosures

"E" = Copy with enctosures "N" = No copy SRS:P SRS:P N

CPSB N

DD S N

PBE:DRP LTRicket 07/

/96 Cg JBNic 07/8 /96 BHur ay 07/

/96 TPG

ynn

/9 HJWong I

07/'7/96 D:DRS TPGw nn 07/ b/96 I