Text
-_
JUL 211987
,%
.
In Reply Refer To:
Docket: 50-267/87-10'
Public Service Company of Colorado
I
ATTN: Mr. Robert 0. Williams, Jr.
Vice President, Nuclear Operations
j
, Post Office Box 840
'
Denver, Colorado 80201-0840'
Dear Mr. Williams:
SUBJECT:
EQUIPMENT QUALIFICATION (EQ) INSPECTION N0. 50-267/87-10, FORT
ST. VRAIN NUCLEAR GENERATING STATION, PLATTEVILLE, COLORADO
This refers to an NRC Region IV inspection to review compliance with
10 CFR 50.49 of activities authorized by License No. DPR-34, conducted by
Messrs. A. R. Johnson and R. E. Ireland, onsite during the periods of
-April 6-10 and 20-24, 1987, and subsequently at the NRC Region IV office until
May 1, 1987, concerning the Fort St. Vrain Nuclear Generating Station. 'The
.
findings were discussed with members of your staff at the conclusion of the
inspection.
Areas examined during the inspection included your implementation of a program
for establishing and maintaining the qualification of electric equipment within
the scope of 10 CFR 50.49. Within these areas, the inspection consisted of
selective examination of procedures and representative records, interviews with
personnel, and observations by the NRC inspectors. The inspection findings are
documented in the enclosed inspection report.
Within the scope of the inspection, no new violations, deviations, or-
unresolved /open items were identified.
We have also examined actions you have taken with regard to two previous
potential enforcement / unresolved items, as identified in the enclosed Notice of
Violation (Appendix A), and five 'open items, including several PSC
recommendations incorporated into change notices committed to by you in " speed
letters." These previously identified inspection findings were a result of the
NRC first round s.pecial team EQ inspection conducted January 26-30, 1987,
(50-267/87-04).
Because you have.taken sufficient corrective action, no
response to the Notice of Violation (Appendix A) is required pursuant to
Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of
t
Federal Regulations. The status of these and remaining items is identified in
the enclosed report
__
__
_
4[ N 7
i
RIV:RSB
C:
AC:RSB
C:
NRR/VIB
l#
ARJohnson/cg
JPJ ud n
REIreland
JE ag iardo
C:SPS/UPotapovs
/ /87
7/d/87
]/p/87
1/l6/87
q . /87
C:RSB k
,
TFWesterman
l
g/g/87
/
'
i
I (
8707280290 070721
ADOCK0500g7
DR
_ - _ _
- - _ - .
_. _ _ _ - _ __
_
._.
_
-
_
-
_-
._
'
e,
,
,
i
Public Service Company of Colorado
-2-
,
Should you have any questions concerning this inspection, we will be pleased to-
~
discuss them with you.
'
Sincerely,
Original Signed By
, ,
J., P. Jaudon
T.'E.Gagliardo, Chief
Reactor Projects Branch
Enclosures:
1.
Appendix A - Notice of Violation
2.
Appendix B - NRC Inspection Report
50-267/87-10-
cc w/ enclosure:
Manager, Nuclear Production Division
Fort St. Vrain Nuclear Station
16805 WCR 191
Platteville, Colorado
80651
P. Tomlinson, Manager, Quality
!
Assurance Division
l
(sameaddress)
l
Colorado Radiation Control Program Director
i
Colorado Public Utilities Commission
bec to DMB (IE01)
bcc distrib. by RIV.
- RPB
DRSP
- RRI
R. D. Martin, RA
- SectionChief(RPB/A)
- RSB
- SectionChief(RSB/ES)
- Project Inspector
i
- R&SPB-
- D. Weiss, RM/ALF
,
- MIS System
- R. Hall
{
- RSTS Operator
E. Merschoff, NRR/RVSB
- RIV File
U. Potapovs, NRR/RVIB
J. Partlow, NRR/DRIS
K. Heitner, NRR/PD4
l
i
A. Johnson
- w/766
l