IR 05000266/1993009
| ML20046C036 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 07/30/1993 |
| From: | Greger L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Link R WISCONSIN ELECTRIC POWER CO. |
| References | |
| NUDOCS 9308090137 | |
| Download: ML20046C036 (1) | |
Text
,
JUL 3 01993 Docket No.. 50-266; 50-301 Wisconsin Electric Power Company-ATTN: Mr. R. Vice' President Nuclear Power 231 West Michigan Street - P379 Milwaukee, WI 53201
Dear Mr. Link:
SUBJECT:
NOTICE OF VIOLATION (NRC INSPECTION REPORT NO. 50-266/93009(DRP);
50-301/93009(DRP))
This will acknowledge receipt of your letter dated July 12, 1993, in response to our letter dated June 11, 1993, transmitting a Notice of Violation associated with Inspection Report No. 50-266/93009(DRP); 50-301/93009(DRP).
We have reviewed your corrective actions for example 2 of the violation and.
have no further questions at this time. These corrective actions will be examined during future inspections.
With regard to example 1 of the violation, we have reviewed your response and acknowledge that the event was not clearly required to be documented in a condition report in accordance with your corrective action system guidance.
However, based on discussions with your staff, we understand that you intend to provide additional information describing clarifications to your ' corrective:
action system concerning utilization of maintenance work requests and-condition reports.
-rco'
'
Sincerely,
)g
"Dev,rni cLped by L.R. crued L. Robert Greger, Chief Reactor Projects Branch 3 CC*
G. J. Maxfield, Plant Manager OC/LFDCB Resident Inspector, RIII Virgil Kanable, Chief Boiler Section Cheryl L. Parrino, Chairman Wisconsin Public Service Commission Robert M. Thompson, Administrator WI Div. of Emergency Govt.
bcc:
PUBLIC'
p RIlh f R IL RIII
WS LCO At)
St@reibfch w
ackiw Olteanu reger 5/?v!H 3/gc/99 9308090137 930730 PDR ADOCK 05000266 G