U.S. NUCLEAR REGULATORY COMMISSION
REGION III
,
Reports No~. 50-266/90013(DRSS); 50-301/90013(DRSS)
f f
<
.Licensect Wisconsin Electric Power Company 231 West Michigan
'
Milwaukee, WI 53201 E
Facility Name: Point Beach. Nuclear Plant. Units 1 and 2
' Inspection At: Plant Site, Two Rivers, Wisconsin
-
.
Inspection Dates:
June 18-22, 1990
' Inspector: hb l 13h 6 v\\
"
7. L. Belanger, Sdnidr Date-Phys _ical Security Inspector
+
Approved By:
D
. R. Creed, Chief Date-i Safeguards Section Inspection Summary
Inspection'on June (18-22, 1990 (Reports No. 50-266/90013(DRSS);
No. 50-301/90013(DRSS)-
- Areas inspected:
Routine unannounced physical security inspection involving:
. Management Support, Testing Maintenance and Compensatory Measures; Training
- and Qualif.ications; and Review of Licensee Actions on Previous Inspection Findings. 'In addition, the following specific areas were reviewed: Security.
.
-Plan and Implementing Procedures and-Records and Reports.
Results: 'Of the~ areas inspected, two violations were identified (Paragraph l
.6.a and Pargraph 6.b). The security significance of the two violations was
' considered major since there were two other recent licensee security event
. reports (SER 90-S01-001 and SER 89-S06-00) that were caused by alarm station operator error. Corrective actions taken or planned should be effective in a
preventing further-problems in this area. The open item concerning the T
Lexcessive. use of compensatory measures for a failed alarm zone was closed.
Strengths observed in the licensee's-security program included the following:
1.
' Licensee management has demonstrated their support for the security
. program by the recent purchase of new x-ray and explosive detectors which wiil-enhance the search process.
s 2.
The licensee-has included the contract security force in a series of plant leadership and -team-building workshops that are designed to enhance bst ction and improve communications within the Nuclear [ncTosuro contains 0 r SAFEGUJ3DS INFORMATION-
,
9007230006 900713 Upon Separation This
'
R,ADOCK0500g6 Pago Is Dscontrolled
'
.
.
,
.
.
ll43.
'9> m, -
'
k( ',..
' * '
-
,.-
+
..
3.-
The licensee is committed-to a long-term espital improvement program-which will upgrade existing lighting, asser.sment aids, and an alarm station.
'
A finding was noted regarding the negative ef'ect on guard force morale-due to a high turnover rate of new security cfficers. The licensee is reviewing potential factors affecting turnover and is seeking to lower the current rate.
-Another finding was observed regarding the current design and layout of an alarm station. This issue will be addressed under the licensee's ongoing security-system upgrade program.
.
.