IR 05000261/2010201

From kanterella
Jump to navigation Jump to search

Download: ML111250400

Text

May 18, 2011

Mr. Robert J. Duncan, II, Vice President Carolina Power & Light Company H.B. Robinson Steam Electric Plant, Unit No. 2 3581 West Entrance Road Hartsville, SC 29550

SUBJECT: H.B. ROBINSON STEAM ELECTRIC PLANT, UNIT 2; NRC SECURITY INSPECTION REPORT 05000261/2011201

Dear Mr. Duncan:

On March 25, 2011, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at the H.B. Robinson Steam Electric Plant, Unit 2. The inspection covered one or more of the key attributes of the Security cornerstone of the NRC's Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on April 7, 2011, with you and other members of your staff. The inspection examined activities conducted under your license as they relate to security and compliance with the Commission's rules and regulations and with the conditions of your license. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel. No findings of significance were identified.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not be available for public inspection.

In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC's document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response "Security-Related Information - Withhold Under 10 CFR 2.390" and follow the instructions for withholding in 10 CFR 2.390(b)(1).Should you have any questions concerning this inspection, we will be pleased to discuss them with you.

Sincerely,/RA/

Robert C. Johnson, Chief Security Performance Evaluation Branch Division of Security Operations Office of Nuclear Security and Incident Response Docket No.: 50-261 License No.: DPR-23

Enclosure:

As stated cc w/encl: C. Johnson, NSIR J. Curry, NSIR D. Brady, NSIR S. Kennedy, RI M. Ernstes, RII, via SLES R. Skokowski, RIII M. Shannon, RIV S. West, H.B. Robinson Steam Electric Plant, Unit 2