UNITED STATES NUCLEAR REGULATORY COMMISSION
REGION I
475 ALLENDALEROAD KING OF PRUSSIA, PENNSYLVANIA19406-1415 ENCLOSURE 2 Docket No. 50-244 apg oi $92 Rochester Gas and Electric Corporation ATIM Mr. Roger Kober President and Chief Executive Officer 49 East Avenue Rochester, New York 14649 Gentlemen:
Subject:
Systematic Assessment of Licensee Performance (SALP) Report No. 50-244/90-99
=-The enclosed report transmits the initial results of the R. E. Ginna Nuclear Power Plant'ALP Board Meeting conducted on March 5, 1992.
We willdiscuss the evaluation with you on April 30, 1992 at the RG&E Training Center.
We believe this is an important meeting worthy of your attention.
At the meeting, please be prepared to discuss our assessment and any plans you may have to improve performance.
During the assessment period, performance in the areas of Maintenance/surveillance and Security continued to improve to a superior level.
But performance in the area of Emergency Preparedness showed some indication of decline from the previously superior level.
In the areas of Plant-Operations, Radiological Controls, Engineering/Technical Support, and Safety Assessment/Quality Verification,, performance remained good.
In particular, you should be prepared to discuss the plans you have to reverse the declining trend in the Emergency Preparedness area.
Following our meeting and receipt of your response, the enclosed report, your response, and summary of our findings and planned actions will be placed in the Public Document Room.
Because of the two week delay in scheduling the meeting, we would appreciate receiving your written response within 15 days of the meeting.
We appreciate your cooperation.
Sincerely, Thomas T. Martin Regional Administrator
Rochester Gas and Electric Corporation Enclosure:
SALP Report No. 50-224/90-99 APR 018S2 cc w/encl:
R. Mecredy, Vice President, Ginna Nuclear Production R. Smith, Senior Vice President, Production and Engineering Central Records (4 copies)
Director, Power Division State of New York, Delertment of Law N. Reynolds, Esquire The Chairman Commissioner Curtiss Commissioner Rogers Commissioner Remick Commissioner de Planque Institute for Nuclear Power Operations (INPO)
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
K. Abraham, PAO (19 copies)
NRC Resident Inspector State of New York, SLO Designee
ENCL'OSURE 3 GINNA SALP MANAGE<22TMEETING'ATTI~22lDKES TER A
AND LE APRIL 30, 1992 RP RA C. Anderson J. Cook W. Dillon C. Edgar D. Filion
'.
Fischer C. Fortiell P. Gorski A. Harhay A. 'Herman D. Irish M. Lilley R. Marchionda T. Marlow W. McCoy R. Mecredy G. Meier F. Mis R. Peck T. Powell D. Schrouder T. Schuler R. Smith J. St. Martin R. Watts J. Widay P. Wilkens R. Wood G. Wrobel Manager, Quality Assurance Reactor Engineer Director, Corporate Security Manager, Electrical/I&C
Radiochemist Maintenance Planning and Scheduling Manager Manager, Electrical Engineering Manager, Mechanical Maintenance
..Manager, Health Physcis and Chemistry Health Physicist Division Manager, F/H Production Manager, Nuclear Assurance Superintendent, Support Services Superintendent, Ginna Production Department Manager; Quality Performance Vice President, Ginna Nuclear Production Department Manager, Production Division Training Health Physicist Corporate Spokesperson Department Manager, Risk Management Vice President, Employee Relations, Public Affairs Operations Manager Senior Vice President, Production and Engineering
. Corrective Action Coordinator Director, Corporate Radiation Protection Plant Manager Department Manager, Nuclear Engineering Services Supervisor, Nuclear Security Manager, Nuclear Safety and Licensing U
LEAR RE LAT RY MMI I W. Butler C. Hehl A. Johnson E. Knutson W. Lazarus J. Linville T. Moslak Director, Project Directorate I-3, NRR Director, Division of Reactor Projects, Region I Project Manager, NRR Resident Inspector Chief, Reactor Projects Section 3B, Region I Chief, Projects Branch No. 3, Region I Senior Resident Inspector
Enclosure 3 QTHER J: Reinhold D. Tomb H. Kujawa K. Roenick
'
Shelter/Evacuation Officer, Monroe;County'.=.
"..:.-
Reporter, Democrat and Chronicle Supervisor, Town of Webster Engineer, Power Division, NYS PSC
xc:
U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C.
20555 Nr. 'Allen R. Johnson (Yiail stop 14D1)
Project Directorate I-3 Washington, D.C.
20555 Ginna Senior Resident Inspector