IR 05000237/2025011
| ML25136A348 | |
| Person / Time | |
|---|---|
| Site: | Dresden |
| Issue date: | 05/19/2025 |
| From: | Jasmine Gilliam NRC/RGN-III/DORS/EB2 |
| To: | Rhoades D Constellation Energy Generation |
| References | |
| IR 2025011 | |
| Download: ML25136A348 (1) | |
Text
SUBJECT:
DRESDEN NUCLEAR POWER STATION, UNITS 2 AND 3 - FIRE PROTECTION TEAM INSPECTION REPORT 05000237/2025011 AND 05000249/2025011
Dear David P. Rhoades:
On May 1, 2025, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Dresden Nuclear Power Station, Units 2 and 3 and discussed the results of this inspection with Carolyne Joseph and other members of your staff. The results of this inspection are documented in the enclosed report.
No findings or violations of more than minor significance were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely, Jasmine A. Gilliam, Chief Engineering Branch 2 Division of Operating Reactor Safety Docket Nos. 05000237 and 05000249 License Nos. DPR-19 and DPR-25
Enclosure:
As stated
Inspection Report
Docket Numbers:
05000237 and 05000249
License Numbers:
Report Numbers:
05000237/2025011 and 05000249/2025011
Enterprise Identifier:
I-2025-011-0030
Licensee:
Constellation Energy Generation, LLC
Facility:
Dresden Nuclear Power Station, Units 2 and 3
Location:
Morris, IL
Inspection Dates:
April 14, 2025 to May 01, 2025
Inspectors:
K. Fay, Senior Reactor Inspector
B. Jose, Senior Reactor Inspector
C. Padilla, Reactor Inspector
Approved By:
Jasmine A. Gilliam, Chief
Engineering Branch 2
Division of Operating Reactor Safety
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a fire protection team inspection at Dresden Nuclear Power Station,
Units 2 and 3, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
None.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
REACTOR SAFETY
71111.21N.05 - Fire Protection Team Inspection (FPTI) Structures, Systems, and Components (SSCs) Credited for Fire Prevention, Detection, Suppression, or Post-Fire Safe Shutdown Review (IP Section 03.01)
The inspectors verified that components and/or systems will function as required to support the credited functions stated for each sample. Additional inspection considerations are located in the fire hazards analysis (FHA) or safe shutdown analysis (SSA).
- (1) Fire Zone 1.1.2.4; Unit 2, Reactor Building General Area, Elevation 570'
- (2) Unit 3, 125 Vdc Distribution System
- (3) Unit 3, 4160 Vac Switch Gear Room
- (4) Unit 1, Diesel Driven Fire Pump
- (5) Unit 3, Low Pressure Coolant Injection System
Fire Protection Program Administrative Controls (IP Section 03.02) (2 Samples)
The inspectors verified that the selected control or process is implemented in accordance with the licensees current licensing basis. If applicable, ensure that the licensees FPP contains adequate procedures to implement the selected administrative control. Verify that the selected administrative control meets the requirements of all committed industry standards.
- (1) Hot Work Permits
- (2) Fire System Impairments
Fire Protection Program Changes/Modifications (IP Section 03.03) (2 Samples)
The inspectors verified the following:
a. Changes to the approved FPP do not constitute an adverse effect on the ability to safely shutdown.
b. The adequacy of the design modification, if applicable.
c.
Assumptions and performance capability stated in the SSA have not been degraded through changes or modifications.
d. The FPP documents, such as the Updated Final Safety Analysis Report, fire protection report, FHA, and SSA were updated consistent with the FPP or design change.
e. Post-fire SSD operating procedures, such as abnormal operating procedures, affected by the modification were updated.
- (1) Engineering Change (EC) 637078; Technical Evaluation to Revise Specification K-4080 for Fire Protection Pipe Repair Method
- (2) Engineering Change (EC) 631956; Technical Evaluation to Justify Adequate Fire Suppression Coverage with Failed Sprinkler Heads in the Unit 3 Hotwell and Low Pressure and High Pressure Heater Bay Areas
INSPECTION RESULTS
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
- On May 1, 2025, the inspectors presented the fire protection team inspection results to Carolyne Joseph and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
DRE97-0256
Dresden Station Fire Protection System Design Basis
Hydraulic Calculations
Calculations
DRE98-0023
Diesel Fire Pump (DFP) Test Acceptance Criteria
0535326
Unexpected Station Black Out (SBO) Battery Room
Exhaust Fan Alarm
09/24/2006
3974158
2017 NRC Fire Protection Inspection, Inaccurate Pre-Fire
Plan, Unit 3 Hydrogen Storage Area
2/14/2017
4447383
Auto Start of Units 1 & 2/3 Diesel Fire Pumps (DFP)
10/19/2021
4459015
Unit1 (U1) Diesel Fire Pump Engine Oil Pressure High
11/06/2021
4474022
U1 DFP High Oil Pressure Troubleshooting Results
01/26/2022
4474035
U1 DFP Fuel Pump Leak
01/26/2022
4489534
Hotwork Fire Protection Non-Compliance
04/01/2022
4500854
U1 DFP Capacity Check Low Margin Results
05/19/2022
4507619
U1 Diesel Fire Pump Auto Start
06/26/2022
4509366
Diesel Fire Pump Low Pressure Switch Calibration Failed
07/05/2022
4519440
Work Request Needed for U1 DFP Electric Governor
Replacement
08/29/2022
21043
Fire Marshal (FM) Evaluate Transient Combustibles
Permit 1398
09/07/2022
27433
Procedure Revision(s) Needed to Manually Start a Fire
Pump
10/06/2022
4677733
U1 DFP Performance Follow-Up
05/12/2023
4699985
Potential Operator Work-Around
09/01/2023
4701206
Cribhouse XL3 51-22 Protection Wire
09/08/2023
4704642
U1 Diesel Fire Pump Low Level Switch Improperly Set
09/24/2023
4716701
Day Impairment Required per Technical Requirements
Manual (TRM) 3.7.j and 3.3.e for XL3 Zone 51 Inoperable
11/10/2023
4739790
U1 DFP Low Header Pressure Start Higher than Expected
01/31/2024
4742582
Fire Header Leak in U3 Reactor Building, Torus
Catwalk/Basement Bay 13
2/04/2024
71111.21N.05
Corrective Action
Documents
4760667
U1 Diesel Fire Pump High Oil Pressure
03/24/2024
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
4772037
XL3 51-22, 2/3 Cribhouse Basement Cable Tray Heat
Detector in Alarm.
05/04/2024
4776375
Multiple 2/3 Cribhouse Cable Tray Sprinkler Heads
Clogged
06/23/2024
4778675
Trend Issue Report (IR): DFPS 4134-09 Clogged Nozzles
06/04/2024
4779097
IR 4688423 Work Request (WR) 1543805 Not Executed
06/06/2024
4779433
Unexpected Alarm: 901-2 F-8 U1 Fire Pump Day Tank
Level Low
06/07/2024
4779477
U1 DFP Day Tank Level Indicator Stuck
06/08/2024
4779528
U1 DFP Day Tank Local Indicator Does Not Work
06/08/2024
4784952
U1 Battery Terminal Lead Connection damaged
07/04/2024
4785126
U2/3 Cribhouse Cable Tray Deluge Sys. Extent of
Condition
07/05/2024
4787364
U1 DFP Wet Pipe Sprinkler Technical Requirements
Manual (TRM) Required Action 3.7.j.A.5.2
07/16/2024
4810266
Throughwall Leak on Fire Protection Pipe on Unit 2 Torus
Catwalk
10/18/2024
4816525
Day IR per TRM 3.7.j for U3 Bus Duct Deluge System
Isolated
11/10/2024
24753
NRC Identified Issue
2/18/2024
4857890
NRC Identified: Power Cable Routed Through Doorway
04/17/2025
4857948
NRC Identified: Blue Tape on Piping in U3 West Corner
Room
04/17/2025
4858029
NRC Identified: Degraded Insulation
04/17/2025
4858310
NRC Identified: Procedure Revision for DFPS 4123-07
04/18/2025
4858338
NRC ID-Cable Not Removed during D3R24 MR90
Removal
04/18/2025
Corrective Action
Documents
Resulting from
Inspection
4859059
NRC Identified: Typo on Fire System Impairment
04/21/2025
Schematic Diagram Preaction System Deluge & Detectors
Control Panels 2202-56A, 2202-56B
F
Hot Shutdown HPCI/LPCI Method Cribhouse
A
Cold Shutdown Division II LPCI Cribhouse
A
Drawings
F-432
Fire Suppression System Cribhouse Basement Cable Tray
Area Isometric
A
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
F-5-1
Detection and Suppression, Reactor Building Elevation
570'
Engineering
Changes
Automatic Sprinkler Deluge Valve Reliable Model DDX 6
Inch Valve
ATI 935492-02
U1 DFP Surveillance Clarifications
09/18/2009
Generic Letter 86-10 Evaluation to Justify Adequate Fire
Suppression Coverage with Failed Sprinkler Heads in the
U3 Hotwell and Low Pressure and High Pressure Heater
Bay Areas
Engineering
Evaluations
Generic Letter 86-10 Evaluation to Revise Specification
K-4080 for Fire Protection Pipe Repair Method
Fire Plans
2 U1CH
Fire Zone 11.3 - Unit 1 Cribhouse Pre-Fire Plan
1-4101-DFPLO
U1 Diesel Fire Pump Lube Oil Analysis Results (Feb
21-Feb 2022)
03/08/2022
1-4101-DFPLO
U1 Diesel Fire Pump Lube Oil Analysis Results (May
22-September 2022)
09/23/2022
1-4101-DFPLO
U1 Diesel Fire Pump Lube Oil Analysis Results
(November 2022-September 2023)
09/27/2023
1-4101-DFPLO
U1 Diesel Fire Pump Lube Oil Analysis Results (January
24-July 2024)
07/01/2024
1-4101-DFPLO
U1 Diesel Fire Pump Lube Oil Analysis Results (July
24-March 2025)
03/09/2025
24-098
Manual Fire System Impairment (FSI) Permit
08/15/2024
24-121
Manual Fire System Impairment (FSI) Permit
10/20/2024
24-130
Manual Fire System Impairment (FSI) Permit
11/24/2024
24-132
Manual Fire System Impairment (FSI) Permit
2/07/2024
25-013
Manual Fire System Impairment (FSI) Permit
2/24/2025
25-020
Manual Fire System Impairment (FSI) Permit
03/18/2025
25-027
Manual Fire System Impairment (FSI) Permit
04/15/2025
AH1542-
41066063
Long Range Guided Wave Ultrasonic Pipe Screening
Results of 2/3-4101-8" Fire Water
07/05/2022
Fire Protection Degraded Maintenance Backlog
Fire Event Report
2/11/2020
Miscellaneous
Fire Event Report
04/25/2024
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Fire Event Report
09/29/2022
23-07
Unit 1 Fire Pump Capacity Check
Fuse Control
CY-DR-120-900
Diesel Fuel Oil Testing
DFPP 4131-03
Resetting Automatic Sprinkler Pre-Action or Deluge
Valves
DFPS 4123-01
Unit 1 Diesel Fire Pump Operability
DFPS 4132-01
Verification of Unit 1, 2, & 3 Sprinkler Systems Integrity
DFPS 4133-01
Water Based Fire Suppression System Supervisory
Device Test
DIP 1500-07
Installation and Removal of Containment Cooling Heat
Exchanger Thermal Test Instrumentation
DTS 1500-05
Containment Cooling Heat Exchanger Thermal Test Data
System Performance Monitoring and Analysis
License Renewal Quarterly Walkdown of Fire Protection
MA-AA-716-230-
1001
Oil Analysis Interpretation Guideline
Operator Work-Around Program
Fire Prevention for Hot Work
Control of Transient Combustible Material
Corrective Action Program (CAP) Procedure
Procedures
Management and Control of Temporary Power
Self-
Assessments
AR-4826073-05
Dresden Fire Protection NRC Inspection Preparatory
Self-Assessment
01/16/2025
0985980
Unexpected Alarm "U2 SBO Battery Room Exhaust Fan
Low Flow"
2/20/2006
1380824
Work Order (WO) Needed to Replace RX Bldg. 125 DC
Dist. Panel Breakers
11/11/2016
1440766
Year Preventive Maintenance Inspect/Clean
2/26/2020
4803806
D2/3 18 Month Cribhouse Cable Tray Deluge System Test
2/27/2020
4805437
D1 2 Year Diesel Fire Pump Inspection.
08/05/2020
4953166
D1 6 Year Diesel Fire pump Inspection & Overhaul
07/08/2022
Work Orders
5076236
D1 2 Year Diesel Fire Pump Inspection
07/05/2022
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
217811
D2/3 Inspections of Buried Piping
08/17/2022
28210
D1 2 Year Diesel Fire Pump Inspection.
07/05/2024
5493717
D1 18 Month Diesel Fire Pump Flow Capacity Test
04/03/2025
5551630
Equipment Operator Round: Water In-Leakage - U1
Cribhouse Penetrations
08/10/2024
5580646
D1 Quarterly Check/Remove Accumulated
Water/Sediment Sample
2/17/2024
5583174
D1 Quarterly Diesel Fire Pump Day Tank Fuel Oil Sample
2/14/2024
5585927
D1 Quarterly Engineering Review Fuel Quality Results
01/24/2025
5602041
D1 Monthly Engineering Review DFP Day Tank 1-5200-T-
137A Fuel Oil Analysis
2/31/2024
5605924
Monthly Fire Extinguisher Inspection W D00Z4114-15-01S
(12/2024)
2/27/2024
5612238
Monthly Fire Extinguisher Inspection W D00Z4114-15-01S
(01/2025)
01/26/2025
20402
Monthly Fire Extinguisher Inspection W D00Z4114-15-01S
(2/2025)
2/23/2025
5635534
Diesel Fire pump Operability Surveillance 1-4104-K-124A
PMPA P38
04/03/2025
2980
D1 12 Year Diesel Fire Pump Inspection and Maintenance
08/05/2020