IR 05000237/2025403
| ML26013A230 | |
| Person / Time | |
|---|---|
| Site: | Dresden |
| Issue date: | 01/15/2026 |
| From: | Michael Ziolkowski NRC/RGN-III |
| To: | Mudrick C Constellation Energy Generation, Constellation Nuclear |
| References | |
| IR 2025403 | |
| Download: ML26013A230 (0) | |
Text
SUBJECT:
DRESDEN NUCLEAR POWER STATION - SECURITY BASELINE INSPECTION REPORT 05000237/2025403 AND 05000249/2025403
Dear Christopher Mudrick:
On December 18, 2025, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Dresden Nuclear Power Station and discussed the results of this inspection with Joe Reda, Plant Manager, and other members of your staff. The results of this inspection are documented in the enclosed report.
No findings or violations of more than minor significance were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely, Michael E. Ziolkowski, Chief Security, Emergency Preparedness, and Incident Response Branch Division of Radiological Safety and Security Docket Nos. 05000237 and 05000249 License Nos. DPR-19 and DPR-25
Enclosure:
As stated
Inspection Report
Docket Numbers:
05000237 and 05000249
License Numbers:
Report Numbers:
05000237/2025403 and 05000249/2025403
Enterprise Identifier:
I-2025-403-0033
Licensee:
Constellation Energy Generation, LLC
Facility:
Dresden Nuclear Power Station
Location:
Morris, IL
Inspection Dates:
August 18, 2025, to December 18, 2025
Inspectors:
K. Maloney, Sr Physical Security Inspector
C. St. Peters, Sr Project Engineer
Approved By:
Michael E. Ziolkowski, Chief
Security, Emergency Preparedness, and Incident Response Branch
Division of Radiological Safety and Security
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Dresden Nuclear Power Station, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
None.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
SAFEGUARDS
71130.02 - Access Control
The inspectors evaluated the access control program through completion of the following inspection elements:
Access Control (1 Sample)
(1)02.01 a-e; 02.02 a-g; 02.04 c; 02.05 a; 02.06 c; 02.08 a, d; 02.09; 02.10 a.
71130.07 - Security Training
The inspectors evaluated the security training program through completion of the following procedure elements:
Security Training (1 Sample)
(1)02.01 a; 02.02 a, c, d, g; 02.03 a-c; 02.04 a-b; 02.05 a, c; 02.06 b; 02.10.
71130.09 - Security Plan Changes
The inspectors evaluated the security plan changes through completion of the following procedure elements:
Security Plan Changes (1 Sample)
(1)02.01 a-e Since the last NRC baseline inspection of this program area, Security Plan Revision 24 to 25 was implemented. Based on Dresden Station's evaluation, and in accordance with 10 CFR 50.54(p)(2), the change(s) resulted in no decrease in safeguards effectiveness of the security plan and the revised security plan change(s)continues to meet the requirements of 10 CFR 73.55(b). The inspector(s) conducted a review of the security plan change(s) to evaluate for a potential decrease in safeguards effectiveness of the security plan; however, this review does not constitute formal NRC approval of those change(s). Therefore, the change(s) remain subject to future NRC inspection in their entirety.
71130.14 - Review of Power Reactor Target Sets
The inspectors evaluated the Security Target Set Program. The following elements were evaluated:
Review of Power Reactor Target Sets (1 Sample)
(1)03.01 a; 03.02 a-d; 03.03 a; 03.04 a-b.
OTHER ACTIVITIES - BASELINE
71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:
PP01: Protected Area Security Equipment Performance Index Sample (IP Section 02.17) (1 Sample)
- (1) January 1, 2024, through June 30, 2025.
INSPECTION RESULTS
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified that no proprietary information was retained or documented in this report.
- On December 18, 2025, the inspectors presented the security baseline inspection results to Joe Reda, Plant Manager, and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Corrective Action Program (CAP) Procedure
009
Constellation Security Search Processes
039
Processing and Searching of Personnel and Vehicles
034
Control of Security Access Control Devices
010
Sy-AA-101-122
Testing Security Equipment
23
SY-AA-101-122-
103
Performance of Access Control Devices and Portal Testing
000
SY-AA-101-122-
104
Performance of Special Purpose Detector, Communications,
Lighting and Biometric Threshold Tests
000
Operations of the Security Control Center
016
Security events and Nuclear Regulatory Commission
Performance Indicators
2
SY-DR-101-112
Dresden Security Search Process
2
SY-DR-101-119
Control of Receiving Warehouses
009
SY-DR-101-122
Dresden Site Specific Testing
2
Sy-DR-101-122-
103
Dresden Specific Access Control Devices
001
Procedures
SY-DR-101-122-
104
Dresden Specific Performance of Special Purpose Detector,
Communication, Lighting, and Biometric Threshold Test
001
Constellation Nuclear Security Range Safety Briefing
Five Complete Supervisor Training Records
2/17/2025
Ten Complete Officer Training Records
2/17/2025
23, 2024, 2025
Twenty Security Officer Completed Training Records
23, 2024, 2025
Five Security Supervisor Completed Training Records
Miscellaneous
25
Dresden Station Tactical Course of Fire at LaSalle Range
PowerPoint
Annual Exam,
Versions A, B, C
Armed Security Officer/Armed Responder Exam
25
Annual Exam,
Versions A, B, C
Armed Security Supervisor (ALL)
25
Constellation Nuclear Security Training
SY-AA-150-101-
F-14
Three Year Security Training Calendar (2025, 2026 & 2027)
SY-AA-150-104-
F-02
Five Completed Armed Responder Contingency OJT
Requirements
SY-AA-150-104-
F-03
Five Completed Alarm Station Operator, Response Team
Leader, Security Shift Supervisor Contingency OJT
Requirements Packets
SY-AA-150-105-
F-02
Physical Fitness Test Warm-Up and Cool Down Checklist
Miscellaneous
SY-AA-150-105-
F-06
Dresden Physical Fitness Test (PFT)
Dresden Tactical Qualification Course Worksheet
Thermal Rifle Qualification Course Scoresheet
Procedures
Tactical Course Development, Approval and Conduct
Self-Assessments
QF0406
Security Training Snapshot Report
08/01/2025
4738903
SEC: Security Annual Target Sets Review
01/30/2024
Corrective Action
Documents
24590
Security Annual Target Sets Review
2/18/2024
Corrective Action
Documents
Resulting from
Inspection
21726
NRC ID: SY-DR-101-502-F-03 EIN Incorrect Unit Designator
2/16/2025
PI-AA-126-1001-
F-01
Self-Assessment Template
Revision, Control, and Distribution of Security Plans and
Implementing Procedures/T&RMs
SY-AA-101-104-
F-02
Procedure/T&RM Revision Summary
Safety/Security Interface
Procedures
SY-DR-101-502
Dresden Station Target Sets
9