IR 05000219/1982014
| ML20062C926 | |
| Person / Time | |
|---|---|
| Site: | Oyster Creek |
| Issue date: | 07/19/1982 |
| From: | Gody A, Madden W, Galen Smith NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | |
| Shared Package | |
| ML20062C893 | List: |
| References | |
| 50-219-82-14, NUDOCS 8208050400 | |
| Download: ML20062C926 (1) | |
Text
___
-
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
_
. _ _ _ _ _ _ _
-
=
.
U.S. NUCLEAR REGULATORY COMMISSION
REGION I
Report No. 50-219/82-14 Docket No. 50-219
' License No bPR-16 Safeguards Group IV Licensee: GPU Nuclear Corporation P. O. Box 388 Forked River, New Jersey Facility Name: Oyster Creek Nuclear Generating Station Inspection At: Forked River, New Jersey Inspection Conducted:
May 17-21, 1982 Date of Last Physical Protection Inspection: April 12-15, 1982 Type of Inspection: Routine Unannounced Physical Protection Inspection Inspectors:
).
7 - 1 7 - f 2-
W. Madden, Physical Protection
'date Inspector
-)9 d V
[ p.'G. Smith, Physical Protection
'
date Inspector
,
Approved by:
a M
b
-
-
(._Arittfoiiy T. ' Gody,
e feguar
/
date Section, Tec
' cal rogram nch Inspection Summary:
Inspec ~ n on May 17-21, 1982 (Report No. 50-219/82-14)
Areas Inspected:
Physical Barriers -- Vital / Protected Areas, Security System Power Supply, Lighting, Assessment Aids, Access Controls -- Personnel / Packages /
Vehicles, Detection Aids -- Protected / Vital Areas, Alarm Stations and Communi-cations.
The inspection involved 63 inspector-hours by two NRC regional based inspectors.
Four inspection hours were accomplished during off-shift periods.
Results:
The licensee was found to be in compliance with NRC requirements in the areas examined.
8208050400 920721
'
PDR ADOCK 05000219 O
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _