IR 05000213/1979018

From kanterella
Jump to navigation Jump to search
IE Insp Rept 50-213/79-18 on 791101-02.No Noncompliance Noted.Major Areas Inspected:Routine Insp Re Turning Over Assignment of Principal IE Inspector & Followup on Selected Previous Findings
ML19257C123
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 11/21/1979
From: Dante Johnson, Keimig R, Lazarus W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML19257C122 List:
References
50-213-79-18, NUDOCS 8001250006
Download: ML19257C123 (3)


Text

.

U.S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT Region I Report No. 50-213/79-18 Docket No. 50-213 License No. DPR-61 Prioritt Category C

--

Licensee: Connecticut Yankee Atomic Power Comoany P. O. Box 270 Hartford, Connecticut 06101 Facility Name: Haddam Neck Plant Inspection at: Haddam Neck, Connecticut Inspection conducted:

No ember 1-2, 1979 p/;a Inspectors:

wm

D.

' finson, Reactor Inspector

'date signed MV

//

2 99

>

W. Mazahph, Reactor Inspector date signed date signed Approved by-

~

M J./ !? 7

. R. Keimig, Chief, Reactor Projects Section

' date si'gned No. 1, RO&NS Branch Insoection Summary:

Inspection on November 1-2,1979 (Report No. 50-213/79-18)

Areas Inspected:

Routine, unannounced inspection for the purpose of turning over assignment of the principal IE inspector and to followup on selected previous inspection findings. The inspection involved 18 inspector-hours on site by two regional based inspectors.

Results: No items of noncompliance were identified.

1810 107 Region I Form 12 B0012 W (Rev. April 77)

-

DETAILS 1.

Persons Contacted R. Blewett, Quality Assurance Supervisor G. Bouchard, Maintenance Supervisor N. Burnett, Operations Sup2rvisor H. Clow, Health Physics Supervisor

  • J. DeLaurence, Engineer J. Eppinger, Reactor Supervisor
  • R. Graves, Station Superintendent J. Kangley, Chemistry Supervisor L. Levine, Engineering Supervisor T. Mawson, Project Engineer (NUSCO)
  • R. Traggio, Unit Superintendent The inspectors also interviewed several members of the licensee's operations, technical, and administrative staffs.
  • denotes those present at the exit interview.

2.

Followup on Previous Insoection Findines (Closed) Unresolved Item (213/79-13-01): The inspector verified that procedure SUR 5.1-126-C, Revision 1, had been revised to add safety related valves and breakers as noted in NRC:RI Irispection Report No. 79-13.

(Closed) Noncompliance (213/79-13-03): The inspector verified that procedures SUR 5.1-4C, Revision 6, and N0P 2.12-1, Revision 9, had been revised to reflect the required position of SI-V-866 as " throttled."

(Closed) Noncompliance (213/79-13-04): The inspector verified that the previously unapproved locked valve checklist used by the licensee had been incorporated into procedure SUR 5.1-126-C, and had been properly reviewed and approved.

(Closed) Noncompliance (213/79-13-05): The inspector verified that the procedural inadequacies addressed for the diesel generator fuel valves were corrected y*th the issuance of SUR 5.1-126-C.

(Closed) Unresolved Item (213/79-13-08): The inspector verified that procedures SUR 5.2-5, Revision 2, and SUR 5.2-4, Revision 2, in-luded the changes necessary to reflect the fact that pressurizer level channels had been " tripped" as required by IE Bulletin 79-06.

1810 108

.

.

(Closed) Noncompliance (213/79-15-0'): The inspector verified that procedure SUR 5.2-9-C had been revised (Revision 5) to require testing high and midlevel NI trips during routine surveillance testing.

(0 pen) Unresolved Item (213/79-16-01):

in a review of the diesel fuel oil drawings used for the pipe support verification, the inspector noted that the unistrut support he had identified to the licensee during inspection 79-16 had not yet been added to drawings. This item will be reviewed in a subsequent inspection and will be resolved by the licensee prior to submittal of their final report for IE Bulletin 79-14.

3.

Plant Tour The inspectors performed a tour of accessible areas of the plant to determine the acceptability of housekeeping and cleanliness, existence of fire and safety hazards, piping vibration and fluid leaks, health physics controls, control room manning, and status of existing alarms.

Areas toured included Turbine Building, Switchgear Rooms, Diesel Generator Rooms, Control Room, Primary Auxiliary Building, Health Physics Control Point, and Containment Cable Penetration Vault.

Except as noted below, no unacceptable conditions were identified.

During the inspection tour of the Switchgear Room, the inspector identified three areas where fire barrier material had been disturbed to install new cables.

Two of the areas had been temporarily repaired, but one had been left open.

the inspector brought this to the attention of the licensee and subsequent investigation determined that work in the area had not been completed, but the licensee agreed to install a temporary fire barrier immediately and to insure that when work in an area was temporarily halted in similar cases, that workers would be required to install temporary fire barriers.

The inspector noted that the Switchgear Room is manned continuously by a member of the security force and that the licensee is still in the process of implementing the requirements of their Fire Protection Plan.

This item is unresolved pending inspection by NRC:RI of the permanent repair to the disturbed fire barriers (213/79-18-01).

4.

Unresolved Items Items about which more information is required to determine acceptability and considered unresolved.

Paragraph 3 contains an unresolved item.

5.

Exit Interview At the conclusion of the inspection the inspector met with licensee represen-tatives (see Details 1 for attendees) to discuss the scope and findings of the inspection as detailed in this report.

1810 109