IR 05000213/1979017

From kanterella
Jump to navigation Jump to search
IE Insp Rept 50-213/79-17 on 791015-19 & 24-26.No Noncompliance Noted.Major Areas Inspected:Security Plan, Security Program Audit,Security Organization & Physical Barriers.Details Withheld (Ref 10CFR2.790)
ML19257C854
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 11/19/1979
From: Devlin J, Evan Jones, Ladun R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML19257C852 List:
References
50-213-79-17, NUDOCS 8001300597
Download: ML19257C854 (1)


Text

'

' *

U. S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT

REGION I

Report No.

50-213/79-17 Category C

Docket No.

50-213 License No.

DPR-61 Safeguards Group

Licensee:

Connecticut Yankee Atomic Power Company P.O. Box 270

-

Hartford, Connecticut 06101 Facility Name:

Haddam Neck Inspection At:

Haddam Neck, Connecticut Inspection Conducted:

October 15-19 and 24-26, 1979 Date of Last Physical Security Inspection:

April 9-12, 1979 Type of Inspecti n:

Unannounced Physical Security Inspector :

,%2M

/[- / i ~ 7 f E. W. Jones, Physical Security Inspector date

'

,H A

/ / ' / '{ ' 7 '~l R. H. Ladun, Physical Security Inspector date L-e date Approved by

/t-vfDr U L

U l /.

/J.'W. Devlin, Chief, Security Section date

/

Inspection Summary:

Areas Inspected:

Security Plan; Security Program Audit; Security Organization; Physical Barriers (Protected and Vital area); Lighting; Access Control (Identi-fication, Authorization, Badging); Access Control (Search); Access Control (Escorting); Access Control (Vital Areas); Alarm Stations; Detection Aids; Assessment Aids; Communications; Testing and Maintenance; Compensatory Measures; Power Supply; Response; Locks, Keys and Combinations; Records and Reports and a followup of previous items of noncompliance; a followup on I&E Bulletin 79-16, and Independent Actions.

The inspection involved 84 inspector-hours onsite by two regional based inspectors.

The inspection was initiated during regular working hours; 7 inspection hours were accomplished during offshift periods.

Results:

The licensee was found to be in compliance with NRC requirements in all twenty-two areas examined.

1833 z47-Region I Form 167 (August 1979)

8001300 7