Forwards IE Insp Rept 50-213/79-18 on 791101-02.No Noncompliance Noted
ML19257C121
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 11/22/1979
From: Brunner E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Counsil W
CONNECTICUT YANKEE ATOMIC POWER CO.
Shared Package
ML19257C122 List:
References
NUDOCS 8001250005
Download: ML19257C121 (2)


See also: IR 05000213/1979018

Text

p

.-

a

,, n,n

UNITED STATES

o

NUCLEAR REGULATORY COMMISslON

o

REGION l

$

,, $

631 PARK AVENUE

f

KING OF PRUSSI A. PENNSYLVANIA 19406

%*****/

NOV 2 219M

Docket No. 50-213

Connecticut Yankee Atomic Power Company

ATTN: Mr. W. G. Counsil

Vice President - Nuclear

Engineering and Operations

P. O. Box 270

Hartford, Connecticut

06101

Gentlemen:

Subject:

Inspection 50-213/79-18

This refers to the inspection conducted by Mr. D. F. Johnson of this office on

November 1-2, 1979 at the Haddam Neck Plant of activities authorized by NRC

License No. DPR-61 and to the discussions of our findings held by Mr. Johnson

with Mr. R. Graves of your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the Office of Inspection

and Enforcement Inspection Report which is enclosed with this letter. Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observations by the

inspector.

Our insplctor also verified the steps you have taken to correct the items of

noncompliance brought to your attention in a letter dated August 21, 1979. We

have no further questions regarding your action at this time.

Within the scope of this inspection, no items of noncompliance were observed.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosed inspection

report will be placed in the NRC's Public Document Room.

If this report contains

any information that you (or your contractor) believe to be proprietary, it is

necessary that you make a written application within 20 days to this office to

withhold such infonnation from public disclosure. Any such application must be

accompanied by an affidavit executed by the owner of the information, which

identifies the document or part sought to be withheld, and which contains a

statement of reasons which addresses with specificity the items which will be

considered by the Commission as listed in subparagraph (b) (4) of Section

2.790. The information sought to be withheld shall be incorporated as far as

possible into a separate part of the affidavit.

If we do not hear from you in

this regard within the specified period, the report will be placed in the Public

Document Room.

8" #

1810

105

.

-

.

.

Connecticut Yankee Atomic Power

2

(40V 2 21979

Company

No reply to this letter is required; however, if you should have any questions

concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

n

ner, Chief

,

Reactor Operations and Nuclear

Support Branch

Enclosure: Office of Inspection and Enforcement Inspection

Report Number 50-213/79-18

cc w/ encl:

R. Graves, Plant Superintendent

D. G. Diedrick, Manager of Quality Assurance

J. R. Himmelwright, Licensing Safeguards Engineer

1810

106