Semantic search
Jump to navigation
Jump to search
| Issue date | Title | |
|---|---|---|
| IR 05000336/2020012 | 14 January 2021 | Biennial Problem Identification and Resolution Inspection Report 05000336/2020012 and 05000423/2020012 |
| ML20217N224 | 22 August 1997 | Rev 0 to 1-OM-7.1, Alarms & Indications |
| B16407, Application for Amend to License DPR-21,revising TS 3.1/4.1 by Removing Run Mode IRM High Flux/Inoperative W/Associated APRM Downscale Scram Trip Function (IRM Run Mode Scram).Revs Developed Using Guidance of NUREG-1433 | 15 May 1997 | Application for Amend to License DPR-21,revising TS 3.1/4.1 by Removing Run Mode IRM High Flux/Inoperative W/Associated APRM Downscale Scram Trip Function (IRM Run Mode Scram).Revs Developed Using Guidance of NUREG-1433 |
| ML20134K172 | 7 February 1997 | NRC Operator Licensing Exam Rept 50-245/96-12 Administered on 961202-06.Exam Results:Six of Seven Applicants Failed Exams & One Passed,But License Was Not Issued Due to Required Plant Manipulations Not Being Completed |
| Information Notice 1994-80, Inadequate DC Ground Detection in Direct Current Distribution Systems | 25 November 1994 | Inadequate DC Ground Detection in Direct Current Distribution Systems |
| ML20127E006 | 12 January 1993 | Application for Amend to License DPR-21,changing TS Re Main Steam Line Radiation Monitor Trip Function.No Clean Demineralizers Rotated Into Svc Since 921223 Due to Current TS Requirements.Waiver of Compliance Also Requested |
| NRC Generic Letter 1991-09 | 27 June 1991 | NRC Generic Letter 1991-009: Modification of Surveillance Interval for the Electrical Protective Assemblies in Power Supplies for the Reactor Protection System |
| IR 05000245/1989026 | 25 January 1990 | Requalification Program Evaluation & Eop/Bwr Power Oscillation Insp Rept 50-245/89-26OL on 891016-21 & 23-26. Exam Results:All 5 Reactor Operators (Ros) & 14 of 15 Senior ROs Passed All Portions of Exam & Replacement Exams Passed |
| IR 05000245/1988016 | 17 March 1989 | Exam Rept 50-245/88-16OL on 881107-10.Exam Results:All Reactor Operator Candidates Passed Exams.Six Senior Reactor Operator (SRO) Candidates Passed Written Exam & Operating Test.One SRO Candidate Failed Written Exam |
| ML20236A036 | 6 March 1989 | Insp Rept 50-245/89-02 on 890110-0213.No Violations Noted. Major Areas Inspected:Plant Operations,Physical Security, Licensee Response to 10CFR21 Rept Involving Limitorque motor-operators,LERs & Committee Activities |
| Information Notice 1986-47, Erratic Behavior of Static O Ring Differential Pressure Switches | 10 June 1986 | Erratic Behavior of Static O Ring Differential Pressure Switches |
| ML20197F169 | 8 May 1986 | Summary of Operating Reactors Events 860428 Meeting W/Listed Divs Re Chernobyl Nuclear Accident & Events at Us Reactors |
| ML20138P008 | 21 October 1985 | Summary of Operating Reactors Events Meeting 85-19 on 851007 W/Ofc Directors,Div Directors & Representatives on Events Which Occurred Since Last Meeting on 851007 |
| ML20112F597 | 25 April 1984 | Logic Diagram:Turbine Plant Miscellaneous Drains. Actual Drawing NUMBER:12179-LSK-32-5.1D |
| ML20024C207 | 24 June 1983 | Ro:On 830512,reactor Protection Sys Master Scram Contactor 590-108G Burned Out.Caused by end-of-life-cyle.Contactor Rebuilt W/New Core,Armature & Coil |
| ML20031D816 | 30 September 1981 | SEP Topic VI-10.A,Testing of Reactor Trip Sys & ESF, Millstone Nuclear Power Station,Unit 1, Interim Rept |
| ML19327A322 | 14 July 1980 | Forwards Response to IE Bulletin 80-17.Full Training of All Licensed Operators to Recognize & Mitigate Event Completed 800710.Util Has Revised Affected Procedures & Forms to Include Rept Requirements |