Semantic search

Jump to navigation Jump to search
 Issue dateTitle
IR 05000336/202001214 January 2021Biennial Problem Identification and Resolution Inspection Report 05000336/2020012 and 05000423/2020012
ML20217N22422 August 1997Rev 0 to 1-OM-7.1, Alarms & Indications
B16407, Application for Amend to License DPR-21,revising TS 3.1/4.1 by Removing Run Mode IRM High Flux/Inoperative W/Associated APRM Downscale Scram Trip Function (IRM Run Mode Scram).Revs Developed Using Guidance of NUREG-143315 May 1997Application for Amend to License DPR-21,revising TS 3.1/4.1 by Removing Run Mode IRM High Flux/Inoperative W/Associated APRM Downscale Scram Trip Function (IRM Run Mode Scram).Revs Developed Using Guidance of NUREG-1433
ML20134K1727 February 1997NRC Operator Licensing Exam Rept 50-245/96-12 Administered on 961202-06.Exam Results:Six of Seven Applicants Failed Exams & One Passed,But License Was Not Issued Due to Required Plant Manipulations Not Being Completed
Information Notice 1994-80, Inadequate DC Ground Detection in Direct Current Distribution Systems25 November 1994Inadequate DC Ground Detection in Direct Current Distribution Systems
ML20127E00612 January 1993Application for Amend to License DPR-21,changing TS Re Main Steam Line Radiation Monitor Trip Function.No Clean Demineralizers Rotated Into Svc Since 921223 Due to Current TS Requirements.Waiver of Compliance Also Requested
NRC Generic Letter 1991-0927 June 1991NRC Generic Letter 1991-009: Modification of Surveillance Interval for the Electrical Protective Assemblies in Power Supplies for the Reactor Protection System
IR 05000245/198902625 January 1990Requalification Program Evaluation & Eop/Bwr Power Oscillation Insp Rept 50-245/89-26OL on 891016-21 & 23-26. Exam Results:All 5 Reactor Operators (Ros) & 14 of 15 Senior ROs Passed All Portions of Exam & Replacement Exams Passed
IR 05000245/198801617 March 1989Exam Rept 50-245/88-16OL on 881107-10.Exam Results:All Reactor Operator Candidates Passed Exams.Six Senior Reactor Operator (SRO) Candidates Passed Written Exam & Operating Test.One SRO Candidate Failed Written Exam
ML20236A0366 March 1989Insp Rept 50-245/89-02 on 890110-0213.No Violations Noted. Major Areas Inspected:Plant Operations,Physical Security, Licensee Response to 10CFR21 Rept Involving Limitorque motor-operators,LERs & Committee Activities
Information Notice 1986-47, Erratic Behavior of Static O Ring Differential Pressure Switches10 June 1986Erratic Behavior of Static O Ring Differential Pressure Switches
ML20197F1698 May 1986Summary of Operating Reactors Events 860428 Meeting W/Listed Divs Re Chernobyl Nuclear Accident & Events at Us Reactors
ML20138P00821 October 1985Summary of Operating Reactors Events Meeting 85-19 on 851007 W/Ofc Directors,Div Directors & Representatives on Events Which Occurred Since Last Meeting on 851007
ML20112F59725 April 1984Logic Diagram:Turbine Plant Miscellaneous Drains. Actual Drawing NUMBER:12179-LSK-32-5.1D
ML20024C20724 June 1983Ro:On 830512,reactor Protection Sys Master Scram Contactor 590-108G Burned Out.Caused by end-of-life-cyle.Contactor Rebuilt W/New Core,Armature & Coil
ML20031D81630 September 1981SEP Topic VI-10.A,Testing of Reactor Trip Sys & ESF, Millstone Nuclear Power Station,Unit 1, Interim Rept
ML19327A32214 July 1980Forwards Response to IE Bulletin 80-17.Full Training of All Licensed Operators to Recognize & Mitigate Event Completed 800710.Util Has Revised Affected Procedures & Forms to Include Rept Requirements