Semantic search

Jump to navigation Jump to search
 Issue dateTitle
L-2006-073, NRC Generic Letter 2006/02 60-Day Response3 April 2006NRC Generic Letter 2006/02 60-Day Response
Information Notice 1994-80, Inadequate DC Ground Detection in Direct Current Distribution Systems25 November 1994Inadequate DC Ground Detection in Direct Current Distribution Systems
NRC Generic Letter 1991-0927 June 1991NRC Generic Letter 1991-009: Modification of Surveillance Interval for the Electrical Protective Assemblies in Power Supplies for the Reactor Protection System
Information Notice 1986-47, Erratic Behavior of Static O Ring Differential Pressure Switches10 June 1986Erratic Behavior of Static O Ring Differential Pressure Switches
ML18041A12330 December 1985LER 85-011-00:on 851129,Train a Engineered Safeguards Actuation Occurred.Caused by Poor Contact in Fuse Holder While Alternate Power Supply Deenergized for Mod.Fuse Holder Replaced & Actuation Signal reset.W/851230 Ltr