Issue date | Title | |
---|---|---|
IR 05000293/2016011 | 10 May 2017 | Supplemental Inspection Report (Inspection Procedure 95003 Phase 'C') 05000293/2016011 and Preliminary Greater-than-Green Finding |
ML17009A306 | 6 January 2017 | LTR-17-0008 - William Maurer and Diane Turco, Cape Downwinders, E-mail Call to Close Pilgrim Nuclear Power Station Due to Pending Winter Storm to Hit Plymouth |
IR 05000293/2016002 | 10 August 2016 | Integrated Inspection Report 05000293/2016002, 04/01/2016 - 06/30/2016 |
IR 05000293/2015009 | 18 June 2015 | IR 05000293/2015009; 05/04/2015 - 05/08/2015; Pilgrim Nuclear Power Station (Pilgrim); Follow-up Supplemental Inspection - Inspection Procedure (IP) 95002 |
IR 05000293/2014008 | 26 January 2015 | IR 05000293/2014008; 11/3/2014 - 12/12/2014; Pilgrim Nuclear Power Station, Supplemental Inspection - Inspection Procedure (IP) 95002 |
IR 05000293/2013004 | 14 November 2013 | IR 05000293-13-004; 07/01/2013 - 09/30/2013; Pilgrim Nuclear Power Station; Problem Identification and Resolution |
ML11187A277 | 10 August 2011 | Attachment 1 to Enclosure - Pilgrim Scram Report 2000 - Present |
IR 05000293/2011008 | 15 April 2011 | IR 05000293-11-008; on 02/14/2011 - 03/04/2011; Pilgrim Nuclear Power Station; Biennial Baseline Inspection of Problem Identification and Resolution. the Inspectors Identified One Finding in the Area of Problem Identification.. |
ML111010406 | 24 January 2011 | Final Written Examination with Answer Key (401-5 Format) |
ML110620474 | 7 January 2011 | Draft Written Exam (Draft 2) |
ML110620479 | 7 January 2011 | Draft Operating Exam (Sections a, B, and C) (Folder 2) |
IR 05000293/2010004 | 26 October 2010 | IR 05000293-10-004; Entergy Nuclear Operations, Inc.; 07/01/2010-09/30/2010; Pilgrim Nuclear Power Station, NRC Integrated Inspection Report |
ML091260229 | 21 November 2008 | Final - Operating Exam (Sections a, B, and C) (Folder 3) |
ML070820363 | 20 February 2007 | Final - RO & SRO Written Examination with Answer Key (401-5 Format) (Folder 3) |
ML070610451 | 11 December 2006 | Draft - RO & SRO Written Exam (Folder 2) |
ML032880228 | 29 September 2003 | Final RO & SRO Written |
ML032880223 | 29 September 2003 | Final Outlines (Change Summaries - Optional) |
ML032880208 | 29 September 2003 | Draft RO & SRO Written All Questions Key |
ML022410221 | 2 August 2002 | Final - RO & SRO Written |
ML20198B202 | 9 December 1998 | Advises of Planned Insp Effort Resulting from Licensee Irpm Review.Details of Insp Plan for Next 6 Months & Historical Listing of Plant Issues Encl |
ML20196F346 | 2 December 1998 | Forwards Info Re Operator Licensing Exam Administered on 981016-23 at Pilgrim Station,For Distribution Under Rids Code IE42 |
IR 05000293/1998301 | 24 November 1998 | NRC Operator Licensing Exam Rept 50-293/98-301OL (Including Completed & Graded Tests) for Tests Administered on 981016- 23.Exam Results:All Applicants Passed All Portions of Exam |
ML20196F580 | 14 August 1998 | Forwards Exam Outlines & Checklists for RO & Instant SRO Exams & Proposed Schedule for Conducting License Exams |
IR 05000293/1998005 | 9 July 1998 | Insp Rept 50-293/98-05 on 980421-0608.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support.Concerns W/Fire Proctection Area Were Identified |
IR 05000293/1998001 | 24 March 1998 | Insp Rept 50-293/98-01 on 980107-0224.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support |
ML20149K131 | 18 July 1997 | NRC Operator Licensing Exam Rept 50-293/97-06 (Including Completed & Graded Tests) for Tests Administered on 970505-09 |
IR 05000293/1996008 | 18 December 1996 | Insp Rept 50-293/96-08 on 960924-1122.Violation Noted.Major Areas Inspected:Engineering,Maint,Plant Support,Radioactive Effluent Controls Program,Radiological Environmental Monitoring & Meteorological Monitoring.Meeting Slides Encl |
IR 05000293/1996006 | 30 October 1996 | Insp Rept 50-293/96-06 on 960729-0923.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support |
Information Notice 1994-80, Inadequate DC Ground Detection in Direct Current Distribution Systems | 25 November 1994 | Inadequate DC Ground Detection in Direct Current Distribution Systems |
IR 05000293/1993014 | 8 September 1993 | Insp Rept 50-293/93-14 on 930713-0816.No Violations Noted. Major Areas Inspected:Plant Operations,Maintenance & Surveillance,Engineering & Plant Support |
ML20127P531 | 25 January 1993 | Amend 145 to License DPR-35,revising TS SRs for Station Batteries by Replacing Rated Load Discharge Test W/Svc Discharge Test once-per-cycle & Performance Discharge Test Every Five Yrs |
ML20099H120 | 10 August 1992 | Proposed TS Surveillance Requirement 4.9.A Re Auxiliary Electrical Equipment & Bases 4.9 Re Svc Discharge Test |
BECO-92-010, Responds to Generic Ltr 91-11 Re Resolution of Generic Issues 48 & 49.Conclusions from Review of Applicability of Subj Generic Issues to Electrical Distribution Sys Procedures & TS Listed | 5 February 1992 | Responds to Generic Ltr 91-11 Re Resolution of Generic Issues 48 & 49.Conclusions from Review of Applicability of Subj Generic Issues to Electrical Distribution Sys Procedures & TS Listed |
BECO-91-150, Revised Proposed Tech Spec Re Auxiliary Electrical Sys | 6 December 1991 | Revised Proposed Tech Spec Re Auxiliary Electrical Sys |
NRC Generic Letter 1991-09 | 27 June 1991 | NRC Generic Letter 1991-009: Modification of Surveillance Interval for the Electrical Protective Assemblies in Power Supplies for the Reactor Protection System |
ML20012D449 | 15 March 1990 | Proposed Tech Specs Re Limiting Condition for Operation & Surveillance Requirements for Core & Containment Cooling Sys & Core Spray & LPCI Sys |
ML20247K408 | 11 September 1989 | Proposed Tech Specs,Revising Section 3/4.9 to Incorporate Reactor Protection Sys Electrical Protection Assemblies |
ML20205N060 | 26 October 1988 | Forwards Biweekly Status Rept for Period 881008-21 |
ML20204H350 | 26 September 1988 | Restart Readiness Assessment Rept for Pilgrim Nuclear Power Station |
ML20235R478 | 15 August 1988 | Summary of Pilgrim Restart Assessment Panel 880811 Telcon Re Status of NRC & Licensee Activities Associated W/Proposed Plant Restart.Next Panel Meeting Will Be Held on 880825 |
IR 05000293/1988012 | 31 May 1988 | Insp Rept 50-293/88-12 on 880306-0417.Violations Noted. Major Areas Inspected:Radiation Protection,Physical Security,Plant Events,Maint,Surveillance,Outage Activites & Repts to NRC |
IR 05000293/1988007 | 6 May 1988 | Insp Rept 50-293/88-07 on 880120-0305.Violations Noted.Major Areas Inspected:Insp of Plant Operations,Radiation Protection,Physical Security,Plant Events,Maint, Surveillance,Outage Activities & Repts to NRC |
IR 05000293/1987027 | 3 September 1987 | Insp Rept 50-293/87-27 on 870623-0803.No Violations Noted. Major Areas Inspected:Plant Operations,Radiation Protection, Physical Security,Plant Events,Maint,Surveillance,Outage Activities & Repts to NRC |
IR 05000293/1987025 | 13 July 1987 | Exam Rept 50-293/87-25OL of Exam Administered During Wk of 870526.All Eight Reactor Operator Candidates Passed.Insp of Licensed Operator Training on Mods & Procedure Changes Will Be Performed Prior to Startup |
ML20236B100 | 14 May 1987 | Forwards Background Info for Commissioner Carr Visit to Plant on 870522 |
BECO-87-070, Forwards Status Rept Re Progress Toward Resolution of Items Identified in NRC ,Per Request.Status Shown as of 870415.Progress & Effectiveness of Actions Monitored,W/ Verification & Validation of Completion Documentation | 6 May 1987 | Forwards Status Rept Re Progress Toward Resolution of Items Identified in NRC ,Per Request.Status Shown as of 870415.Progress & Effectiveness of Actions Monitored,W/ Verification & Validation of Completion Documentation |
ML20210P435 | 2 September 1986 | Insp Rept 50-293/86-25 on 860708-0804.Violations Noted: Failure to Follow Surveillance Test Procedures & to Initiate Failure & Malfunction Repts for Deficient Fire Barriers. Deviations Noted:Failure to Hold Fire Brigade Drills |
IR 05000293/1986014 | 30 July 1986 | Insp Rept 50-293/86-14 on 860428-0602.Violations Noted: Inadequate Surveillance Testing of HPCI Sys Uncorrected for 6 Months & Equipment Overdue for Calibr Used on Three Occasions |
ML20204F731 | 30 July 1986 | Insp Rept 50-293/86-14 on 860428-0602.Violations Noted: Inadequate Surveillance Testing of HPCI Sys Uncorrected for 6 Months & Equipment Overdue for Calibr Used on Three Occasions |
ML20211Q241 | 17 July 1986 | Forwards Status Rept for Wk of 860710-16.Reactor in Cold Shutdown for Maint.Discusses 860711 Half Scram Due to Circuit Breaker Trip & Util Failure to Fulfill ATWS Sys Surveillance Test Tech Spec Requirements |