 Issue dateTitle
IR 05000293/201601110 May 2017Supplemental Inspection Report (Inspection Procedure 95003 Phase 'C') 05000293/2016011 and Preliminary Greater-than-Green Finding
ML17009A3066 January 2017LTR-17-0008 - William Maurer and Diane Turco, Cape Downwinders, E-mail Call to Close Pilgrim Nuclear Power Station Due to Pending Winter Storm to Hit Plymouth
IR 05000293/201600210 August 2016Integrated Inspection Report 05000293/2016002, 04/01/2016 - 06/30/2016
IR 05000293/201500918 June 2015IR 05000293/2015009; 05/04/2015 - 05/08/2015; Pilgrim Nuclear Power Station (Pilgrim); Follow-up Supplemental Inspection - Inspection Procedure (IP) 95002
IR 05000293/201400826 January 2015IR 05000293/2014008; 11/3/2014 - 12/12/2014; Pilgrim Nuclear Power Station, Supplemental Inspection - Inspection Procedure (IP) 95002
IR 05000293/201300414 November 2013IR 05000293-13-004; 07/01/2013 - 09/30/2013; Pilgrim Nuclear Power Station; Problem Identification and Resolution
ML11187A27710 August 2011Attachment 1 to Enclosure - Pilgrim Scram Report 2000 - Present
IR 05000293/201100815 April 2011IR 05000293-11-008; on 02/14/2011 - 03/04/2011; Pilgrim Nuclear Power Station; Biennial Baseline Inspection of Problem Identification and Resolution. the Inspectors Identified One Finding in the Area of Problem Identification..
ML11101040624 January 2011Final Written Examination with Answer Key (401-5 Format)
ML1106204747 January 2011Draft Written Exam (Draft 2)
ML1106204797 January 2011Draft Operating Exam (Sections a, B, and C) (Folder 2)
IR 05000293/201000426 October 2010IR 05000293-10-004; Entergy Nuclear Operations, Inc.; 07/01/2010-09/30/2010; Pilgrim Nuclear Power Station, NRC Integrated Inspection Report
ML09126022921 November 2008Final - Operating Exam (Sections a, B, and C) (Folder 3)
ML07082036320 February 2007Final - RO & SRO Written Examination with Answer Key (401-5 Format) (Folder 3)
ML07061045111 December 2006Draft - RO & SRO Written Exam (Folder 2)
ML03288022829 September 2003Final RO & SRO Written
ML03288022329 September 2003Final Outlines (Change Summaries - Optional)
ML03288020829 September 2003Draft RO & SRO Written All Questions Key
ML0224102212 August 2002Final - RO & SRO Written
ML20198B2029 December 1998Advises of Planned Insp Effort Resulting from Licensee Irpm Review.Details of Insp Plan for Next 6 Months & Historical Listing of Plant Issues Encl
ML20196F3462 December 1998Forwards Info Re Operator Licensing Exam Administered on 981016-23 at Pilgrim Station,For Distribution Under Rids Code IE42
IR 05000293/199830124 November 1998NRC Operator Licensing Exam Rept 50-293/98-301OL (Including Completed & Graded Tests) for Tests Administered on 981016- 23.Exam Results:All Applicants Passed All Portions of Exam
ML20196F58014 August 1998Forwards Exam Outlines & Checklists for RO & Instant SRO Exams & Proposed Schedule for Conducting License Exams
IR 05000293/19980059 July 1998Insp Rept 50-293/98-05 on 980421-0608.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support.Concerns W/Fire Proctection Area Were Identified
IR 05000293/199800124 March 1998Insp Rept 50-293/98-01 on 980107-0224.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support
ML20149K13118 July 1997NRC Operator Licensing Exam Rept 50-293/97-06 (Including Completed & Graded Tests) for Tests Administered on 970505-09
IR 05000293/199600818 December 1996Insp Rept 50-293/96-08 on 960924-1122.Violation Noted.Major Areas Inspected:Engineering,Maint,Plant Support,Radioactive Effluent Controls Program,Radiological Environmental Monitoring & Meteorological Monitoring.Meeting Slides Encl
IR 05000293/199600630 October 1996Insp Rept 50-293/96-06 on 960729-0923.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support
Information Notice 1994-80, Inadequate DC Ground Detection in Direct Current Distribution Systems25 November 1994Inadequate DC Ground Detection in Direct Current Distribution Systems
IR 05000293/19930148 September 1993Insp Rept 50-293/93-14 on 930713-0816.No Violations Noted. Major Areas Inspected:Plant Operations,Maintenance & Surveillance,Engineering & Plant Support
ML20127P53125 January 1993Amend 145 to License DPR-35,revising TS SRs for Station Batteries by Replacing Rated Load Discharge Test W/Svc Discharge Test once-per-cycle & Performance Discharge Test Every Five Yrs
ML20099H12010 August 1992Proposed TS Surveillance Requirement 4.9.A Re Auxiliary Electrical Equipment & Bases 4.9 Re Svc Discharge Test
BECO-92-010, Responds to Generic Ltr 91-11 Re Resolution of Generic Issues 48 & 49.Conclusions from Review of Applicability of Subj Generic Issues to Electrical Distribution Sys Procedures & TS Listed5 February 1992Responds to Generic Ltr 91-11 Re Resolution of Generic Issues 48 & 49.Conclusions from Review of Applicability of Subj Generic Issues to Electrical Distribution Sys Procedures & TS Listed
BECO-91-150, Revised Proposed Tech Spec Re Auxiliary Electrical Sys6 December 1991Revised Proposed Tech Spec Re Auxiliary Electrical Sys
NRC Generic Letter 1991-0927 June 1991NRC Generic Letter 1991-009: Modification of Surveillance Interval for the Electrical Protective Assemblies in Power Supplies for the Reactor Protection System
ML20012D44915 March 1990Proposed Tech Specs Re Limiting Condition for Operation & Surveillance Requirements for Core & Containment Cooling Sys & Core Spray & LPCI Sys
ML20247K40811 September 1989Proposed Tech Specs,Revising Section 3/4.9 to Incorporate Reactor Protection Sys Electrical Protection Assemblies
ML20205N06026 October 1988Forwards Biweekly Status Rept for Period 881008-21
ML20204H35026 September 1988Restart Readiness Assessment Rept for Pilgrim Nuclear Power Station
ML20235R47815 August 1988Summary of Pilgrim Restart Assessment Panel 880811 Telcon Re Status of NRC & Licensee Activities Associated W/Proposed Plant Restart.Next Panel Meeting Will Be Held on 880825
IR 05000293/198801231 May 1988Insp Rept 50-293/88-12 on 880306-0417.Violations Noted. Major Areas Inspected:Radiation Protection,Physical Security,Plant Events,Maint,Surveillance,Outage Activites & Repts to NRC
IR 05000293/19880076 May 1988Insp Rept 50-293/88-07 on 880120-0305.Violations Noted.Major Areas Inspected:Insp of Plant Operations,Radiation Protection,Physical Security,Plant Events,Maint, Surveillance,Outage Activities & Repts to NRC
IR 05000293/19870273 September 1987Insp Rept 50-293/87-27 on 870623-0803.No Violations Noted. Major Areas Inspected:Plant Operations,Radiation Protection, Physical Security,Plant Events,Maint,Surveillance,Outage Activities & Repts to NRC
IR 05000293/198702513 July 1987Exam Rept 50-293/87-25OL of Exam Administered During Wk of 870526.All Eight Reactor Operator Candidates Passed.Insp of Licensed Operator Training on Mods & Procedure Changes Will Be Performed Prior to Startup
ML20236B10014 May 1987Forwards Background Info for Commissioner Carr Visit to Plant on 870522
BECO-87-070, Forwards Status Rept Re Progress Toward Resolution of Items Identified in NRC ,Per Request.Status Shown as of 870415.Progress & Effectiveness of Actions Monitored,W/ Verification & Validation of Completion Documentation6 May 1987Forwards Status Rept Re Progress Toward Resolution of Items Identified in NRC ,Per Request.Status Shown as of 870415.Progress & Effectiveness of Actions Monitored,W/ Verification & Validation of Completion Documentation
ML20210P4352 September 1986Insp Rept 50-293/86-25 on 860708-0804.Violations Noted: Failure to Follow Surveillance Test Procedures & to Initiate Failure & Malfunction Repts for Deficient Fire Barriers. Deviations Noted:Failure to Hold Fire Brigade Drills
IR 05000293/198601430 July 1986Insp Rept 50-293/86-14 on 860428-0602.Violations Noted: Inadequate Surveillance Testing of HPCI Sys Uncorrected for 6 Months & Equipment Overdue for Calibr Used on Three Occasions
ML20204F73130 July 1986Insp Rept 50-293/86-14 on 860428-0602.Violations Noted: Inadequate Surveillance Testing of HPCI Sys Uncorrected for 6 Months & Equipment Overdue for Calibr Used on Three Occasions
ML20211Q24117 July 1986Forwards Status Rept for Wk of 860710-16.Reactor in Cold Shutdown for Maint.Discusses 860711 Half Scram Due to Circuit Breaker Trip & Util Failure to Fulfill ATWS Sys Surveillance Test Tech Spec Requirements