Semantic search
Jump to navigation
Jump to search
Issue date | Title | |
---|---|---|
ML20311A484 | 6 November 2017 | 2017 Q1-Q4 ROP Inspection Findings |
IR 05000219/2016001 | 12 May 2016 | IR 05000219/2016001: Oyster Creek Nuclear Generating Station - Integrated Inspection Report (Jan 1 2016 - Mar 31 2016) |
ML16064A177 | 10 February 2016 | Final Written Examination with Answer Key (401-5 Format) (Folder 3) |
ML17216A172 | 10 February 2016 | Draft Operating Exam (Sections a, B and C) (Folder 2) |
ML16064A171 | 10 February 2016 | Final Operating Exam (Sections a, B, and C) (Folder 3) |
ML17216A174 | 10 February 2016 | Draft Written Exam (Folder 2) |
RA-15-042, Biennial 10 CFR 50.59 and 10 CFR 72.48 Change Summary Reports - January 1, 2013 Through December 31, 2014 | 26 May 2015 | Biennial 10 CFR 50.59 and 10 CFR 72.48 Change Summary Reports - January 1, 2013 Through December 31, 2014 |
ML14163A388 | 13 May 2014 | Final Operating Exam (Sections a, B, and C) (Folder 3) |
ML14167A384 | 2 April 2014 | Draft Operating Exam (Sections a, B, and C) (Folder 2) |
IR 05000219/2013002 | 29 April 2013 | IR 05000219-13-002, 01/01/2013 03/31/2013; Exelon Energy Company, LLC (Exelon), Oyster Creek Generating Station; Operability Determinations and Functionality Assessments |
IR 05000219/2011005 | 8 February 2012 | IR 05000219-11-005; 10/01/2011 - 12/31/2011; Oyster Creek Generating Station; Operability Determinations and Functionality Assessments |
ML12017A164 | 30 July 2011 | Draft - Outlines (Folder 2) |
IR 05000219/2011003 | 25 July 2011 | IR 05000219-11-003; 04/01/11 - 06/30/11; Oyster Creek Generating Station - NRC Integrated Inpsection Report |
ML112130528 | 6 July 2011 | Final Written Examination with Answer Key (401-5 Format) (Folder 2) |
ML111870274 | 26 May 2011 | Draft Written Exam (Folder 2) |
IR 05000219/2011002 | 13 May 2011 | IR 05000219-11-002; 01/01/2011 - 03/31/2011; Oyster Creek Generating Station - NRC Integrated Inspection Report |
IR 05000219/2010002 | 30 April 2010 | IR 05000219-10-002; 01/01/2010 - 03/31/2010; Exelon Energy Company, LLC, Oyster Creek Generating Station; Maintenance Effectiveness, Operability Evaluations |
ML082530401 | 12 June 2008 | Retake Exam Draft - Section C Operating Exam (Folder 2) |
ML082530408 | 12 June 2008 | Retake Exam Final - Section C Operating Exam (Folder 3) |
ML071100237 | 27 July 2007 | License Amendment, Issuance of Amendment Request to Change Technical Specification Definition of Channel Calibration, Channel Check, and Channel Test |
ML063070472 | 15 September 2006 | October 2006 Exam - Final Section C Operating Exam (Folder 3) |
ML063060395 | 5 September 2006 | October 2006 Exam - Draft Section C Operating Exam (Folder 2) |
ML063060323 | 5 September 2006 | Oct. 2006 Exam - Draft RO & SRO Written (Folder2) |
IR 05000219/2006002 | 4 May 2006 | IR 05000219-06-002 on 01/01/06 - 03/31/06 for Amergen Energy Company, LLC; Oyster Creek Generating Station; Maintenance Effectiveness, Refueling and Other Outage Activities, and Access Control to Radiologically Significant Areas |
ML060600122 | 27 February 2006 | 2006/02/27-Oyster Creek License Renewal AMP-AMR Audit Questions - Set 1 |
IR 05000219/2004005 | 31 January 2005 | IR 05000219-04-005 on 10/01/04 -12/31/04 for Oyster Creek Generating Station; Event Follow-up and Access Control to Radiologically Significant Areas |
ML050250141 | 24 January 2005 | Draft - RO & SRO Written Exam (Folder 2) |
ML050270025 | 24 January 2005 | Final - RO & SRO Written (Folder 3) |
IR 05000219/2004004 | 10 November 2004 | IR 05000219-04-004 on 07/01/04 - 09/30/04 for Oyster Creek Generating Station; Operability Evaluations, Event Follow-up |
IR 05000219/2004002 | 12 May 2004 | IR 05000219-04-002; 01/01/04 Through 03/31/04, for Oyster Creek Generating Station; Operability Evaluations; Access Control to Radiologically Significant Areas; ALARA Planning and Controls; Radiation Monitoring Instrumentation and Protectiv |
ML041750183 | 19 April 2004 | Final Section C Operating |
ML041890331 | 19 April 2004 | Draft Outlines |
ML041890336 | 19 April 2004 | Draft RO & SRO Written |
ML041890346 | 19 April 2004 | Draft Section C Operating |
ML041750143 | 19 April 2004 | Final RO & SRO Written |
ML041380169 | 19 April 2004 | Licensee Post Exam Written Comments (Initial Comments) |
ML021610225 | 31 May 2002 | Draft - Outlines (Facility Ltr Dtd 02/21/02) |
ML021610274 | 31 May 2002 | Draft - SRO Written, Oyster Creek 2002 NRC Initial Licensing Exam |
ML021610534 | 31 May 2002 | Final - Section C Operating |
ML021610358 | 31 May 2002 | Draft - Section C Operating |
ML20203B278 | 16 February 1998 | 10CFR50.59(b) Rept of Changes to Oyster Creek Systems & Procedures |
ML20133A790 | 20 December 1996 | Volumes 1 & 2 to Plant Referenced Simulator Certification |
Information Notice 1994-80, Inadequate DC Ground Detection in Direct Current Distribution Systems | 25 November 1994 | Inadequate DC Ground Detection in Direct Current Distribution Systems |
ML20064G539 | 14 January 1994 | Rev 0 to Div I Mod Design Description MDD-OC-622-C Div I, Replacement of Recirculation Flow Monitoring Electronics |
NRC Generic Letter 1991-09 | 27 June 1991 | NRC Generic Letter 1991-009: Modification of Surveillance Interval for the Electrical Protective Assemblies in Power Supplies for the Reactor Protection System |
ML20065Q931 | 20 September 1990 | Responds to NRC Re Violations Noted in Insp Rept 50-219/90-05.Concern 3 Re Certified Plant Ref Simulator Addressed |
ML20056B514 | 20 August 1990 | Description of Changes to Facility for CY89,per 10CFR50.59(a)(2) |
IR 05000219/1990005 | 9 August 1990 | Requalification Program Evaluation Rept 50-219/90-05OL on 900409-11 & 0416-18,0518-25,0601 & 0607-08.Audit Results: Three Reactor Operators Failed Written Exam & Two Reactor Operators Failed Operating Test |
IR 05000219/1989010 | 24 May 1989 | Insp Rept 50-219/89-10 on 890402-29.No Violations Noted. Major Areas Inspected:Action of Plant Deficiencies Discovered During Startup,Instrument Air Sys Problems, Surveillance Testing & Control Rod Scram Timing Testing |
IR 05000219/1989007 | 17 May 1989 | Insp Rept 50-219/89-07 on 890226-0401.No Violations Noted. Major Areas Inspected:Activities in Progress at Completion of Outage,In Preparation for Startup & Plant Startup Activities |